IP Library Granted Patent US 8,204,632
Granted Patent B2
US 8,204,632 · App. 12/131,986 · Granted Jun 19, 2012

Emergency frequency load shedding scheme

Assignee: Electric Power Research Institute, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,204,632
App. No.
12/131,986
Granted
Jun 19, 2012
Kind
B2
Abstract

A load shedding system and method for controlling imbalances in a power system includes a signal generator adapted to generate a signal representative of a local system, and a modifying circuit adapted to adjust set frequencies. The system also includes a processing circuit adapted to process data received from the signal generator and modifying circuit and set load shedding priorities for the local system based on the processed data.

Claims (12)

1. A load shedding system, comprising:

(a) a signal generator adapted to generate a signal equal to a local system frequency;

(b) a modifying circuit adapted to adjust a predetermined frequency based on a rate of change of the local system frequency and thereby generate an adjusted frequency; and

(c) a processing circuit adapted to:

(i) compare the adjusted frequency to the predetermined frequency; and

(ii) set load shedding priorities for the local system based on the comparison of the adjusted frequency to the predetermined frequency.

2. The load shedding system according to claim 1 , wherein the signal generator provides localized readings of frequency and power carried by the local system.

3. The load shedding system according to claim 1 , wherein the signal generator generates a signal equal to a frequency measured at the local system.

4. The load shedding system according to claim 1 , wherein the signal generator generates a signal equivalent to a power carried and measured at the local system.

5. The load shedding system according to claim 1 , wherein the processing circuit includes a processor for setting the load shedding priorities.

6. The load shedding system according to claim 1 , wherein the processing circuit compares data from the signal generator and the modifying circuit to predetermined frequencies.

7. The load shedding system according to claim 1 , wherein the signal generator provides localized readings of frequency and power carried by feeders of the local system.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 3, 2008
From: ABI-SAMRA, NICHOLAS C
To: ELECTRIC POWER RESEARCH INSTITUTE, INC.
Reel/Frame 021033/0018 →
Continuity (1)
Related Publication 20090299540A1 · Dec 3, 2009