Method for operating a wind energy installation

Inventors: Stephan Engelhardt (Sonsbeck, DE); Andrzej Geniusz (Mulheim an der Ruhr, DE)
Assignee: Woodward Kempen
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,487,461
App. No.
12/811,721
Granted
Jul 16, 2013
Kind
B2
Abstract

The invention relates to a method for operating a wind energy plant having a double-fed asynchronous machine, at least one inverter and at least one control device, wherein electrical energy is at least partly supplied into a grid via the inverter, the inverter comprises per phase at least one power semi-conductor module with at least two transistor circuits and at least two free-wheeling diodes and the inverter by using the control device is actuated at least at times via a pulse width modulation (PWM). The object, namely of providing a generic method for operating a wind energy plant in which an improved power output is effected even in the low-noise rotational speed range of the rotors, is achieved in that, at frequencies of the current to be impressed by the inverter on the machine side of less than 10 Hz, preferably less than 6 Hz, the switching-on duration and/or the switching frequency of the transistor circuits and/or of the free-wheeling diodes of the inverter are altered via the control device by taking their thermal heating into account.

Claims (15)

1. A method for operating a wind energy plant having a double-fed asynchronous machine, at least one inverter and at least one control device, wherein electrical energy is at least partly supplied to a grid via the inverter, wherein the inverter comprises per phase at least one power semi-conductor module having at least two transistor circuits and at least two free-wheeling diodes as components, and wherein the control device actuates the inverter at least at times via a pulse width modulation (PWM), the method comprising:

altering, at frequencies of currents to be impressed by the inverter on a machine side of less than 10 Hz, the switching frequency of the transistor circuits and/or of the free-wheeling diodes of the inverter via the control device depending upon the thermal heating of the respective components such that the number of switching operations in the power semi-conductor module is reduced.

2. The method according to claim 1 , wherein the inverter is used on the rotor side.

3. The method according to claim 1 , further comprising:

altering, at frequencies of the currents to be impressed by the inverter on the machine side of less than 10 Hz, the switching-on duration of the transistor circuits and/or of the free-wheeling diodes of the inverter via the control device depending upon the thermal heating of the respective components such that the number of switching operations in the power semi-conductor module is reduced.

4. The method according to claim 3 , wherein the switching-on duration and/or the switching frequency of the transistor circuits and/or of the free-wheeling diodes is/are selected at least dependent in each case on a relationship between a temperature of the respective components and a maximum junction temperature.

5. The method according to claim 3 , wherein the switching-on duration of the transistor circuits and of the free-wheeling diodes is selected such that a temperature of the respective component in each case is proportionate to a maximum junction temperature of the respective component.

6. The method according to claim 3 , wherein the dependency of the switching-on duration and/or of the switching frequency of the transistor circuits and/or of the free-wheeling diode on the respective component temperature is pre-determined by means of simulating the thermal behaviour of the components.

7. The method according to claim 1 , wherein temperatures of the components are determined via sensors.

8. The method according to claim 1 , wherein, during the altering step, the power semi-conductor modules are actuated by using a flat top process or via pre-calculated pulse patterns in order to reduce the switching operations.

9. The method according to claim 3 , wherein at frequencies of the currents to be impressed by the inverter on a machine side of less than 6 Hz, the switching-on duration and/or the switching frequency of the transistor circuits and/or of the free-wheeling diodes of the inverter is/are altered via the control device by taking their thermal heating into account in that the number of switching operations in the power semi-conductor module is reduced.

10. A computer program with commands, the execution of which causes a processor to carry out the method according to claim 1 .

11. A computer program product which contains a computer program with commands, the execution of which causes a processor to carry out the method according to claim 1 .

12. A control device of a double-fed asynchronous machine of a wind energy plant, wherein the control device controls an inverter of a double-fed asynchronous machine for supplying electrical energy to a grid and means are provided for actuating the inverter according to a method according to claim 1 .

13. A wind energy plant comprising a double-fed asynchronous machine, at least one inverter and a control device for carrying out a method according to claim 1 .

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 1, 2023
From: CONVERTERTEC DEUTSCHLAND GMBH
To: KK WIND SOLUTIONS A/S
Reel/Frame 065730/0101 →
CORRECTIVE ASSIGNMENT TO CORRECT THE THE NATURE OF CONVEYANCE AND ADD EFFECTIVE DATE OF JULY 20, 2020 PREVIOUSLY RECORDED ON REEL 054347 FRAME 0204. ASSIGNOR(S) HEREBY CONFIRMS THE NUNC PRO TUNC ASSIGNMENT. Recorded Nov 19, 2020
From: WOODWARD KEMPEN GMBH
To: CONVERTERTEC DEUTSCHLAND GMBH
Reel/Frame 054477/0942 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 12, 2020
From: WOODWARD KEMPEN GMBH
To: CONVERTERTEC DEUTSCHLAND GMBH
Reel/Frame 054347/0204 →
CHANGE OF NAME Recorded Feb 5, 2013
From: WOODWARD SEG GMBH & CO. KG
To: WOODWARD KEMPEN GMBH
Reel/Frame 029752/0701 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 6, 2010
From: ENGELHARDT, STEPHAN; GENIUSZ, ANDRZEJ
To: WOODWARD SEG GMBH & CO. KG
Reel/Frame 024636/0553 →
Priority Claims (1)
DE 10 2008 003 299 · Jan 7, 2008 · national
Continuity (1)
Related Publication 20100277134A1 · Nov 4, 2010