IP Library Granted Patent US 8,548,655
Granted Patent B2
US 8,548,655 · App. 11/861,180 · Granted Oct 1, 2013

Method and system for grade crossing protection

Inventor: Abe Kanner (Mississauga, CA)
Assignee: Thales Canada Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,548,655
App. No.
11/861,180
Granted
Oct 1, 2013
Kind
B2
Abstract

Apparatus and methods for a grade crossing protection system include at least one camera providing surveillance of a grade crossing, the at least one camera coupled to a transmitter configured to transmit a signal that includes imagery of the grade crossing to a transceiver onboard a train. A display unit onboard the train is provided to allow the train operator to view the grade crossing. A control unit in communication with the transceiver is configured to monitor the received signal and, based upon a determined location of the train relative to the train crossing, issue a command to the train's brake system to reduce the speed of the train, or stop the train, before the train reaches the grade crossing.

Claims (27)

1. A method for automatically braking a train approaching a grade crossing comprising the steps of:

receiving, by an onboard control unit, a transmission comprising imagery of a surveillance area at a grade crossing;

displaying the received imagery on a device viewable by a train operator;

determining a position of the train relative to the grade crossing;

automatically reducing, by the onboard control unit, train speed to a predetermined speed at a predetermined distance from the grade crossing; receiving an override command from an operator of the train; and overriding the automatic reduction in speed of the train based upon a status of the received transmission.

2. The method of claim 1 , further comprising:

determining a position of the train based upon a Global Positioning Satellite signal.

3. The method of claim 1 , further comprising:

determining a position of the train based upon a location signal received from a positioning transponder disposed along the train track; and

comparing the position of the train to a stored location of the grade crossing.

4. The method of claim 1 , further comprising:

determining a received status of the transmission from grade crossing; and

stopping the train prior to the grade crossing based upon the determined status of the received signal.

5. The method of claim 1 , wherein overriding the automatic reduction in speed comprises maintaining the speed of the train.

6. The method of claim 1 , wherein overriding the automatic reduction in speed comprises increasing the speed of the train.

7. The method of claim 1 , further comprising stopping the train prior to the grade crossing based upon determining a lack of receipt of a subsequent transmission comprising imagery.

8. The method of claim 1 , wherein the receiving comprises receiving a near-real time visual image of the surveillance area.

9. The method of claim 1 , wherein the receiving comprises receiving a continuous sequence of images of the surveillance area.

10. A method of controlling a train approaching a grade crossing comprising:

receiving, by an onboard control unit, imagery of a surveillance area at a grade crossing;

displaying received imagery of the surveillance area at the grade crossing on a device viewable by a train operator;

monitoring the distance from the train to the grade crossing;

automatically reducing, by the onboard control unit, train speed to a predetermined speed at a predetermined distance from the grade crossing;

increasing or maintaining the train speed responsive to receipt of an override command from an operator of the train if imagery is displayed to the train operator;

stopping the train if imagery is not displayed to the train operator and an override command is not received from the train operator; receiving an override command from an operator of the train; and overriding the automatic reduction in speed of the train based upon a status of the received transmission.

11. The method of claim 10 , wherein the receiving comprises receiving a near-real time visual image of the surveillance area.

12. The method of claim 10 , wherein the receiving comprises receiving a continuous sequence of images of the surveillance area.

Assignments (3)
CHANGE OF NAME Recorded Sep 6, 2024
From: GROUND TRANSPORTATION SYSTEMS CANADA INC.
To: HITACHI RAIL GTS CANADA INC.
Reel/Frame 068829/0478 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 14, 2023
From: THALES CANADA INC
To: GROUND TRANSPORTATION SYSTEMS CANADA INC.
Reel/Frame 065566/0509 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 11, 2007
From: KANNER, ABE
To: THALES RAIL SIGNALLING SOLUTIONS INC.
Reel/Frame 020229/0910 →
Continuity (2)
Provisional Application 60863045 · Oct 26, 2006
Related Publication 20080103648A1 · May 1, 2008