IP Library Granted Patent US 8,745,210
Granted Patent B2
US 8,745,210 · App. 12/976,560 · Granted Jun 3, 2014

Migration control apparatus and migration control method

Inventor: Atsuji Sekiguchi (Kawasaki, JP)
Assignee: Fujitsu Limited
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,745,210
App. No.
12/976,560
Granted
Jun 3, 2014
Kind
B2
Abstract

A migration control apparatus for controlling migration of a virtual machine includes a monitoring section, a planning section, a time estimation section, a comparing section, and a plan execution section. The monitoring section monitors a status of a current migration of the virtual machine running on a first physical machine. The planning section makes, on the basis of the status of the current migration, a new migration plan for migrating the virtual machine. The time estimation section estimates a first migration time required to perform a new migration. The comparing section compares the first migration time with a second migration time to determine which migration will be completed earlier. The second migration time is an estimated time required to complete the current migration. The plan execution section performs the new migration when it has been determined that the new migration will be completed earlier.

Claims (23)

1. A migration control apparatus for controlling migration of a virtual machine, the migration control apparatus comprising:

a processor to:

monitor a status of a current migration of the virtual machine running on a first physical machine, the current migration being performed in accordance with a current migration plan;

make, on the basis of the status of the current migration and while the current migration is being performed, a new migration plan for migrating the virtual machine from the first physical machine to a second physical machine, the new migration plan includes reducing power consumption by aggregating virtual machines in a smaller number of physical machines to terminate physical machines on which no virtual machine is running and which are estimated to consume only constant amount of power;

estimate a first migration time required to perform a new migration in accordance with the new migration plan;

compare the first migration time with a second migration time to determine which migration will be completed earlier between the new migration and the current migration, the second migration time being an estimated time required to complete the current migration; and

perform the new migration when it has been determined that the new migration will be completed earlier.

2. The migration control apparatus according to claim 1 , wherein the status of the current migration is anyone of an amount of memory data to be copied by data transfer in the current migration, a ratio of memory data changed during the data transfer, and a throughput of the data transfer.

3. The migration control apparatus according to claim 1 , wherein the processor estimates the first migration time in response to a predetermined trigger.

4. The migration control apparatus according to claim 3 , wherein the predetermined trigger is one of elapsing a predetermined time period, receiving request for assigning a new virtual machine, and

completing a migration of any virtual machine.

5. A migration control method executed by a migration control apparatus for controlling migration of a virtual machine, the migration control method comprising:

monitoring a status of a current migration of the virtual machine running on a first physical machine, the current migration being performed in accordance with a current migration plan;

making, on the basis of the status of the current migration and while the current migration is being performed, a new migration plan for migrating the virtual machine from the first physical machine to a second physical machine, the new migration plan includes reducing power consumption by aggregating virtual machines in a smaller number of physical machines to terminate physical machines on which no virtual machine is running and which are estimated to consume only constant amount of power;

estimating a first migration time required to perform a new migration in accordance with the new migration plan;

comparing, by the migration control apparatus, the first migration time with a second migration time to determine which migration will be completed earlier between the new migration and the current migration, the second migration time being an estimated time required to complete the current migration; and

performing the new migration when it has been determined that the new migration will be completed earlier.

6. A non-transitory computer-readable storing medium storing a program causing a computer for controlling migration of a virtual machine to execute:

monitoring a status of a current migration of the virtual machine running on a first physical machine, the current migration being performed in accordance with a current migration plan;

making, on the basis of the status of the current migration and while the current migration is being performed, a new migration plan for migrating the virtual machine from the first physical machine to a second physical machine, the new migration plan includes reducing power consumption by aggregating virtual machines in a smaller number of physical machines to terminate physical machines on which no virtual machine is running and which are estimated to consume only constant amount of power;

estimating a first migration time required to perform a new migration in accordance with the new migration plan;

comparing the first migration time with a second migration time to determine which migration will be completed earlier between the new migration and the current migration, the second migration time being an estimated time required to complete the current migration; and

performing the new migration when it has been determined that the new migration will be completed earlier.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 29, 2011
From: SEKIGUCHI, ATSUJI
To: FUJITSU LIMITED
Reel/Frame 025718/0277 →
Priority Claims (1)
JP 2009-295915 · Dec 25, 2009 · national
Continuity (1)
Related Publication 20110161491A1 · Jun 30, 2011