IP Library Granted Patent US 8,763,704
Granted Patent B2
US 8,763,704 · App. 13/328,245 · Granted Jul 1, 2014

High pressure hydrocarbon fracturing on demand method and related process

Inventor: Dana Pettigrew (Airdrie, CA)
Assignee: Nexen Energy ULC
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,763,704
App. No.
13/328,245
Granted
Jul 1, 2014
Kind
B2
Abstract

A method or process for hydraulically fracturing an underground hydrocarbon deposit includes using as a source of water an underground aquifer which contains water which is stable and clear in the aquifer but which may include undesirable chemical compounds as soluble components that are not in solution when subjected to reduced pressure at atmospheric conditions. Water from the aquifer is used as a source of water for the hydrocarbon fracturing process. The water is pumped at a pressure above its bubble point pressure A source well and a disposal well are drilled into the aquifer. A pump capable of maintaining the water above its bubble point pressure is provided, and a closed loop is established with a manifold, or a manifold and pumps, to keep the aquifer water circulating at a pressure above its bubble point pressure. The hydrocarbon reserve is fractured using the water.

Claims (31)

1. A method or process for hydraulically fracturing an underground hydrocarbon deposit comprising the steps of:

using as a source of water an underground aquifer which contains water which is stable and clear in the aquifer but which may include undesirable chemical compounds as soluble components that are not in solution when subjected to a relatively reduced pressure at atmospheric conditions,

utilizing the water from the aquifer as a source of water for a hydrocarbon fracturing process,

pumping the water under pressure at a predetermined level for the aquifer water and above a bubble point pressure for the water contained in the aquifer to prevent the undesirable chemical compounds in said water from separating out of solution,

maintaining said water pressure above the bubble point pressure at all times during a fracturing operation,

drilling a source well into the aquifer,

drilling a disposal well into the aquifer,

providing a pump capable of maintaining the water above the bubble point pressure,

establishing a closed loop with a manifold, or a manifold and pumps, to keep the aquifer water circulating at all times until the fracturing operation begins when water will be supplied from that manifold,

providing the fracturing operation with water from the manifold, or a manifold and pumps, so as to fracture the hydrocarbon deposit,

wherein in using water from the aquifer in the fracturing operation and by maintaining said water above its bubble point pressure, said water remains stable and the undesirable chemical compounds remain in solution and the water remains clear.

2. The method of claim 1 wherein the soluble components in the water from the source aquifier are at about 22,000 ppm.

3. A method or process of high-pressure fracturing of a shale gas deposit comprising the steps of:

using as a source of water an underground aquifer which contains sour water including hydrogen sulfide,

utilizing the sour water from the aquifer as a source of water to be used on at least a clean side of a fracturing operation,

pumping said sour water under pressure and above a bubble point pressure for the sour water contained in the aquifer to prevent hydrogen sulfide from falling out of solution,

maintaining said sour water pressure above the bubble point pressure at all times during the fracturing operation,

drilling a source well into the aquifer,

drilling a disposal well into the aquifer,

providing a pump capable of maintaining the water above the bubble point pressure,

establishing a closed loop with a manifold, or a manifold and pumps, to keep the sour water circulating at all times until the fracturing operation begins when water will be supplied from that manifold,

providing the clean side of the fracturing operation with sour water from the manifold, or a manifold and pumps, so as to fracture the shale gas deposit,

wherein in using sour water from the aquifer for the fracturing operation and in maintaining said sour water above its bubble point pressure, said water remains stable and the constituents remain in solution and the water remains clear.

4. The method or process of claim 1 or 3 wherein said water source is utilized along with a sand on a dirty side of the hydrocarbon deposit or shale gas deposit fracturing operation.

5. The method or process of claim 1 or 3 further comprising providing a plurality of pumps and source wells and disposal water wells to enable the fracturing operation to occur on demand for each pad of a predetermined number of pads.

6. The method or the process of claim 1 or 3 wherein said water from the source aquifer is kept at an elevated temperature in relation to ambient surface water.

7. The method or process of claim 6 wherein the elevated temperature of the water from the source aquifier is about 38° C.

8. The method or process of claim 1 or 3 further comprising providing an underground pipeline system including a water circulation line and a back pressure control valve located in the water circulation line wherein the pipeline system is in communication with the manifold or the manifold and pumps, and wherein when water is required, it will be withdrawn from the manifold, or the manifold and pumps.

9. The method or process of claim 1 or 3 further comprising providing a high pressure blender to maintain the water above its bubble point pressure.

10. The method or process of claim 1 or 3 wherein after pumping, the water is discharged at a pressure of about 6,000 to 10,000 psig.

11. The method or process of claim 10 wherein a suction pressure employed for a pump utilized in the process is about 15 to 600 psig.

Assignments (4)
CHANGE OF NAME Recorded Feb 19, 2019
From: NEXEN ENERGY ULC
To: CNOOC PETROLEUM NORTH AMERICA ULC
Reel/Frame 048366/0576 →
CHANGE OF NAME Recorded Nov 15, 2013
From: NEXEN ENERGY INC.
To: NEXEN ENERGY ULC
Reel/Frame 031611/0627 →
CERTIFICATE OF CONTINUATION Recorded Nov 15, 2013
From: NEXEN INC.
To: NEXEN ENERGY INC.
Reel/Frame 031644/0988 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 2, 2012
From: PETTIGREW, DANA
To: NEXEN INC.
Reel/Frame 027795/0130 →
Continuity (4)
Provisional Application 61426123 · Dec 22, 2010
Provisional Application 61434167 · Jan 19, 2011
Provisional Application 61434171 · Jan 19, 2011
Related Publication 20120160502A1 · Jun 28, 2012