System and method of selecting wind turbine generators in a wind park for curtailment of output power to provide a wind reserve
In one aspect, a method of selecting wind turbine generators in a wind park for curtailment of output power to provide a wind reserve comprises providing a wind park comprised of a plurality n of wind turbines each having an individual possible power output and the wind park has a combined possible power output of X, where X comprises a summation of the individual possible power output of the n wind turbines; setting a power setpoint Y for the wind park, wherein Y≦X and X−Y comprises a wind reserve; selecting, on a non-spatial basis, n−1 or fewer wind turbines from the wind park for power output curtailment; and curtailing power output of one or more of the selected n−1 or fewer wind turbines such that a total power output of the wind park comprises Y.
1. A method of selecting wind turbine generators in a wind park for curtailment of output power to provide a wind reserve, said method comprising:
providing a wind park comprised of a plurality n of wind turbines, wherein the n wind turbines each have an individual possible power output and the wind park has a combined possible power output of X wherein X comprises a summation of the individual possible power outputs of the n wind turbines;
setting a power setpoint Y for the wind park, wherein Y≦X and X−Y comprises a wind reserve;
assigning a curtailment priority to each of the n wind turbines based on one or more non-spatial factors;
selecting n−1 or fewer wind turbines from the wind park for power output curtailment based on the curtailment priority assigned to each of the n wind turbines; and
curtailing power output of one or more of the selected n−1 or fewer wind turbines until a summation of the curtailed power output of the one or more selected n−1 or fewer wind turbines equals X−Y, such that a total power output of the wind park comprises Y.
2. The method of claim 1 , wherein said one or more non-spatial factors include at least one of noise produced by a specific wind turbine, distance from a specific wind turbine to a sound sensitive location, expected lifetime of a specific wind turbine's pitch system, contractual requirements, electrical limitations of the wind park, operational characteristics of a specific wind turbine, need to perform maintenance on a specific wind turbine pitch movements of a specific wind turbine, cumulative curtailment time of a specific wind turbine or operating conditions of the wind turbine.
3. The method of claim 2 , wherein the operating conditions comprise at least one of converter temperature, gearbox temperature or generator temperature.
4. The method of claim 1 , wherein selecting n−1 or fewer wind turbines from the wind park for power output curtailment comprises selecting the n−1 or fewer wind turbines dynamically based on the assigned curtailment priority.
5. The method of claim 1 , wherein selecting n−1 or fewer wind turbines from the wind park for power output curtailment comprises selecting the n−1 or fewer wind turbines from a static list based on the assigned curtailment priority.
6. The method of claim 5 , wherein the wind turbines having the highest assigned priority are first selected to form the static list.
7. The method of claim 1 , wherein the wind turbine with the highest curtailment priority is first selected for curtailing power output.
8. A system for selecting wind turbine generators in a wind park for curtailment of output power to provide a wind reserve, said system comprising:
a wind park comprised of a plurality n of wind turbines, wherein the n wind turbines each have an individual possible power output and the wind park has a combined possible power output of X wherein X comprises a summation of the individual possible power outputs of the n wind turbines; and
a controller, wherein the controller is operably connected to each of the n wind turbines and configured to send control signals to each of the n wind turbines and to receive signals from each of the n wind turbines, said controller having a user interface and said controller further configured to:
receive a power setpoint Y for the wind park, wherein Y≦X and X−Y comprises a wind reserve;
select n−1 or fewer wind turbines from the wind park for power output curtailment based on a curtailment priority assigned to each of the n based on one or more non-spatial factors; and
send one or more signals to curtail power output of one or more of the selected n−1 or fewer wind turbines until a summation of the curtailed power output of the one or more selected n−1 or fewer wind turbines equals X−Y, such that a total power output of the wind park comprises Y.
9. The system of claim 8 , wherein the controller is configured to dynamically select said n−1 or fewer wind turbines for power output curtailment based on the assigned curtailment priority or select said n−1 or fewer wind turbines from a static list for power output curtailment based on the assigned curtailment priority.
10. The system of claim 8 , wherein said one or more non-spatial factors include at least one of noise produced by a specific wind turbine, distance from a specific wind turbine to a sound sensitive location, expected lifetime of a specific wind turbine's pitch system, contractual requirements, electrical limitations of the wind park, operational characteristics of a specific wind turbine, need to perform maintenance on a specific wind turbine, pitch movement of a specific wind turbine, cumulative curtailment time of a specific wind turbine or operating conditions of a specific wind turbine.
11. The system of claim 9 , wherein the wind turbines having the highest assigned priority are first selected to form the static list.
12. The system of claim 10 , wherein the operating conditions comprise at least one of converter temperature, gearbox temperature or generator temperature.
13. The system of claim 8 , wherein curtailing power output of one or more of the selected n−1 or fewer wind turbines until the summation of the curtailed power output of the one or more selected n−1 or fewer wind turbines equals X−Y, such that a total power output of the wind park comprises Y comprises curtailing power output of another wind turbine in addition to the one or more of the selected n−1 or fewer wind turbines if the summation of the curtailed power output of the one or more selected n−1 or fewer wind turbines is less than X−Y.
14. The system of claim 8 , wherein curtailing power output of one or more of the selected n−1 or fewer wind turbines until the summation of the curtailed power output of the one or more selected n−1 or fewer wind turbines equals X−Y, such that a total power output of the wind park comprises Y comprises curtailing power output of one fewer wind turbine of the one or more selected n−1 or fewer wind turbines if the summation of the curtailed power output of the one or more selected n−1 or fewer wind turbines is greater than X−Y.
15. The system of claim 8 , wherein the controller is further configured to assign the curtailment priority to each of the n wind turbines based on the one or more non-spatial factors.
16. The system of claim 8 , wherein the wind turbine with the highest curtailment priority is first selected for curtailing power output.
17. A method of selecting wind turbine generators in a wind park for curtailment of output power to provide a wind reserve, said method comprising:
providing a wind park comprised of a plurality n of wind turbines, wherein the n wind turbines each have an individual possible power output and the wind park has a combined possible power output of X wherein X comprises a summation of the individual possible power outputs of the n wind turbines;
setting a power setpoint Y for the wind park, wherein Y≦X and X−Y comprises a wind reserve;
assigning a curtailment priority to each of the n wind turbines based on cumulative curtailment time of each of the n wind turbines, wherein the wind turbine with a lowest cumulative curtailment time gets assigned a highest curtailment priority and the wind turbine with a highest cumulative curtailment time gets assigned a lowest curtailment priority;
selecting, on a non-spatial basis, n−1 or fewer wind turbines from the wind park for power output curtailment based on the curtailment priority assigned to each of the n wind turbines; and
curtailing power output of one or more of the selected n−1 or fewer wind turbines until a summation of the curtailed power output of the one or more selected n−1 or fewer wind turbines equals X−Y, such that a total power output of the wind park comprises Y.
18. The method of claim 17 , wherein the wind turbine with the highest curtailment priority is first selected for curtailing power output.