IP Library Granted Patent US 9,042,131
Granted Patent B2
US 9,042,131 · App. 14/182,236 · Granted May 26, 2015

Power-packet-switching converter with sequenced connection to link inductor

Inventors: Guy Michael Barron (Austin, TX); William C. Alexander (Spicewood, TX)
Assignee: Ideal Power Inc.
H02M1/08H02M2001/0058H02M2001/123H02M7/4826H02M3/335H02M5/225H02M7/219H02M2007/4815H02M3/33507H02M5/458Y02B70/1441
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,042,131
App. No.
14/182,236
Granted
May 26, 2015
Kind
B2
Abstract

Methods and systems for managing link voltages in a power converter, where single phase, three phase or universal systems can be used. Common mode management refers to shifting of voltages in a particular direction to perform transition between input and output ports, in addition to maintaining soft switching property. Voltages in power converters can be freely increasing and decreasing, and thus damage to the circuit can be caused if these voltages change are not controlled.

Claims (17)

1. A method of operating a power-packet-switching converter, comprising the actions of:

a) connecting first and second lines of a first port, through first and second respective phase legs, to drive an inductor, and thereby increase the amount of energy stored in the inductor;

b) isolating the inductor, so that the inductor drives current into a capacitance which is paralleled with the inductor, to thereby change the voltage on the capacitor and on the inductor;

c) connecting first and second lines of a second port, through first and second respective phase legs each comprising bidirectional switching devices, to draw power from the inductor, under zero-voltage-switching conditions;

d) turning off said first but not said second phase leg of said second port, to fix the voltage of one terminal of the inductor, while the inductor changes the voltage differential across the capacitor;

e) turning off the second phase leg of said second port, while the inductor continues to change the voltage differential across the capacitor;

f) coupling power from the inductor, through one of said first and second phase legs of said second port, in combination with another phase leg, under zero-voltage-switching conditions; and

repeating steps a)-f) with reversed current direction.

2. A solar energy system which implements the method of claim 1 .

3. A power conversion system which implements the method of claim 1 .

4. A method of operating a power-packet-switching converter, comprising the actions of:

a) connecting first and second lines of a first port, through first and second respective phase legs each comprising two bidirectional switching devices, to drive an inductor and increase the amount of energy stored therein;

b) turning off said first phase leg but not said second phase leg, to fix the voltage of one terminal of the inductor, while said inductor drives current into a capacitor, which is connected in parallel with the inductor, to thereby change the voltage differential across the inductor;

c) turning off said second phase leg, while allowing said voltage differential to continue changing;

d) once the voltage differential stops changing, connecting third and fourth lines of a second port, through third and fourth respective phase legs each comprising two bidirectional switching devices, to thereby transfer polyphase power out to said second port.

5. A solar energy system which implements the method of claim 4 .

6. A power conversion system which implements the method of claim 4 .

Assignments (6)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 2, 2020
From: CE+T ENERGY SOLUTIONS INC.
To: CE+T GROUP SA
Reel/Frame 052810/0773 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 25, 2019
From: IDEAL POWER INC.
To: CE+T ENERGY SOLUTIONS INC.
Reel/Frame 051112/0840 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 11, 2019
From: PATHION HOLDINGS, INC.; PATHION, INC.
To: IDEAL POWER INC.
Reel/Frame 050341/0761 →
COURT ORDER Recorded Sep 4, 2019
From: PATHION, INC.; PATHION HOLDINGS, INC.
To: IDEAL POWER INC.
Reel/Frame 050270/0702 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 1, 2019
From: IDEAL POWER INC.
To: PATHION HOLDINGS, INC.
Reel/Frame 049934/0768 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 14, 2015
From: BARRON, GUY MICHAEL; ALEXANDER, WILLIAM C.
To: IDEAL POWER, INC.
Reel/Frame 035403/0333 →
Continuity (2)
Provisional Application 61765129 · Feb 15, 2013
Related Publication 20150003115A1 · Jan 1, 2015