IP Library Granted Patent US 9,255,162
Granted Patent B2
US 9,255,162 · App. 14/419,552 · Granted Feb 9, 2016

Polymerisation process

Inventors: Guillaume Lajus (Martigues, FR); Rupert Parkinson (Stirlingshire, GB); Leslie William Bolton (Fleet Hampshire, GB)
Assignee: INEOS EUROPE AG
C08F10/06C08F10/00C08F10/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,255,162
App. No.
14/419,552
Granted
Feb 9, 2016
Kind
B2
Abstract

Process for the polymerization of olefins in a gas phase fluidized bed reactor, by i) passing a fluidizing gas to the reactor to fluidize a bed of polymer particles therein, ii) withdrawing the fluidizing gas from the reactor, iii) cooling all or a portion of the fluidizing gas withdrawn from the reactor to a temperature at which a portion of the components of the fluidizing gas condense to form condensed liquid, and iv) passing condensed liquid and non-condensed components of the fluidizing gas back to the reactor. A reservoir of condensed liquid downstream of the cooling step is provided, and variations in the inventory of the condensed liquid are made in order to control the temperature in the reactor.

Claims (41)

1. A process for the polymerisation of olefins in a gas phase fluidised bed reactor, the polymerisation process comprising:

i) passing a fluidising gas to the reactor to fluidise a bed of polymer particles therein,

ii) withdrawing the fluidising gas from the reactor,

iii) cooling all or a portion of the fluidising gas withdrawn from the reactor to a temperature at which a portion of the components of the fluidising gas condense to form condensed liquid, and

iv) passing condensed liquid and non-condensed components of the fluidising gas back to the reactor,

wherein there is provided a reservoir of condensed liquid downstream of the cooling step, and variations in the inventory of the condensed liquid are made in order to control the temperature in the reactor.

2. A process according to claim 1 wherein the variations in the inventory are variations in an inventory set point in the reservoir.

3. A process according to claim 1 wherein the variations in the inventory of condensed liquid are such that ΔTNR is greater than 0.1° C., ΔTNR being defined as:

Δ TNR=R *(Δ m /mass_bed)

Where:

Δm=change in mass of liquid in the reservoir [kg]

mass_bed=mass of polymer in the fluidised bed reactor [kg]

R=137 [and has units of ° C.].

4. A process according to claim 2 wherein the variations in the inventory of condensed liquid are of at least 5% compared to the initial inventory set point.

5. A process according to claim 1 which comprises a temperature control system for the reactor, which temperature control system acts as follows in the event that a variation in the cooling in the reactor is required:

a) the control system acts to vary the inventory of liquid in the reservoir, and

b) the control system acts to adjust the amount of cooling applied in step (iii).

6. A process according to claim 5 wherein the control system in step (a) acts directly on the flow of liquid from the reservoir to the reactor.

7. A process according to claim 5 wherein the control system in step (a) acts by changing the inventory set point in the reservoir.

8. A process according to claim 5 wherein the variation of the inventory of liquid in the reservoir in step (a) and the adjustment of the cooling in step (b) are performed in parallel.

9. A process according to claim 1 which has a deadtime at least 50% lower than the deadtime as would be determined for the same system under the same process conditions but based on the deadtime measured from when the control system requests a change in the applied cooling to the recycle stream if the variation in liquid inventory according to the present invention is not performed.

10. A process according to claim 1 wherein the polymerisation is a commercial scale fluidised bed polymerisation process and has a control system with a deadtime of 120 seconds or less.

11. A process for the polymerisation of olefins in a gas phase fluidised bed reactor, the polymerisation process comprising

i) passing a fluidising gas to the reactor to fluidise a bed of polymer particles therein,

ii) withdrawing the fluidising gas from the reactor,

iii) cooling all or a portion of the fluidising gas withdrawn from the reactor to a temperature at which a portion of the components of the fluidising gas condense to form condensed liquid, and

iv) passing condensed liquid and non-condensed components of the fluidising gas back to the reactor,

wherein the process has a temperature control system for the reactor which has a deadtime of 120 seconds or less.

12. A process according to claim 11 wherein the deadtime is 90 seconds or less.

13. A process according to claim 1 which is a process for the production of polyethylene or polypropylene by polymerisation of ethylene or propylene respectively.

14. A process according to claim 1 which has a production rate of at least 40 tonnes/hour.

15. A process according to claim 11 which is a process for the production of polyethylene or polypropylene by polymerisation of ethylene or propylene respectively.

16. A process according to claim 11 which has a production rate of at least 40 tonnes/hour.

17. A process according to claim 2 wherein the variations in the inventory are variations in a liquid level set point.

18. A process according to claim 17 wherein the variations in the inventory of condensed liquid are of a liquid level change of at least 5% compared to the initial liquid level set point.

19. A process according to claim 17 wherein the control system in step (a) acts by changing the liquid level set point in the reservoir.

20. A process according to claim 10 wherein the deadtime is 90 seconds or less.

21. A process according to claim 10 wherein the deadtime is 60 seconds or less.

22. A process according to claim 12 wherein the deadtime is 60 seconds or less.

23. A process according to claim 14 which has a production rate of 55 tonnes/hour.

24. A process according to claim 16 which has a production rate of 55 tonnes/hour.

Assignments (2)
SECURITY INTEREST Recorded May 4, 2017
From: INEOS TECHNOLOGIES USA LLC; INEOS EUROPE AG
To: BARCLAYS BANK PLC
Reel/Frame 042398/0916 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 23, 2015
From: LAJUS, GUILLAUME; PARKINSON, RUPERT; BOLTON, LESLIE WILLIAM
To: INEOS EUROPE AG
Reel/Frame 035005/0207 →
Priority Claims (1)
EP 12179365 · Aug 6, 2012 · regional
Continuity (1)
Related Publication 20150191557A1 · Jul 9, 2015