IP Library Granted Patent US 9,262,227
Granted Patent B2
US 9,262,227 · App. 14/305,050 · Granted Feb 16, 2016

Virtual machine management method and apparatus

Inventor: Tsunehisa Doi (Kawasaki, JP)
Assignee: FUJITSU LIMITED
G06F9/5016G06F9/4856
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,262,227
App. No.
14/305,050
Granted
Feb 16, 2016
Kind
B2
Abstract

A non-transitory computer-readable recording medium has a program stored therein for causing a computer to execute a process. The process includes estimating a cost of executing a live migration of a virtual machine, using a count value of an access counter for counting the number of accesses to a memory allocated to the virtual machine, a capacity of the memory, and a bandwidth of data transfer between physical machines relating to the live migration.

Claims (24)

1. A non-transitory computer-readable recording medium having a program stored therein for causing a computer to execute a process, the process comprising:

estimating a cost of executing a live migration of a virtual machine, using a count value of an access counter for counting the number of accesses to a memory allocated to the virtual machine, a capacity of the memory, and a bandwidth of data transfer between physical machines relating to the live migration.

2. The non-transitory computer-readable recording medium as claimed in claim 1 , wherein the cost is a memory transfer time.

3. The non-transitory computer-readable recording medium as claimed in claim 1 , the process further comprising:

excluding the virtual machine from execution targets of the live migrations, or stopping execution of the live migration if the live migration of the virtual machine is being executed, based on a result of comparing the estimated cost with a predetermined threshold value.

4. The non-transitory computer-readable recording medium as claimed in claim 1 , the process further comprising:

determining an execution plan of the live migrations of a plurality of the virtual machines, based on the estimated costs; and

executing the live migrations based on an allocation plan.

5. A method of managing a live migration of a virtual machine, executed by a computer, the method comprising:

estimating a cost of executing the live migration of the virtual machine, using a count value of an access counter for counting the number of accesses to a memory allocated to the virtual machine, a capacity of the memory, and a bandwidth of data transfer between physical machines relating to the live migration.

6. The method as claimed in claim 5 , wherein the cost is a memory transfer time.

7. The method as claimed in claim 5 , further comprising:

excluding the virtual machine from execution targets of the live migrations, or stopping execution of the live migration if the live migration of the virtual machine is being executed, based on a result of comparing the estimated cost with a predetermined threshold value.

8. The method as claimed in claim 5 , further comprising:

determining an execution plan of the live migrations of a plurality of the virtual machines, based on the estimated costs; and

executing the live migrations based on an allocation plan.

9. An apparatus for managing a live migration of a virtual machine, comprising:

a cost estimation unit configured to estimate a cost of executing the live migration of the virtual machine, using a count value of an access counter for counting the number of accesses to a memory allocated to the virtual machine, a capacity of the memory, and a bandwidth of data transfer between physical machines relating to the live migration.

10. The apparatus as claimed in claim 9 , wherein the cost is a memory transfer time.

11. The apparatus as claimed in claim 9 , further comprising:

an allocation control unit configured to exclude the virtual machine from execution targets of the live migrations, or to stop execution of the live migration if the live migration of the virtual machine is being executed, based on a result of comparing the estimated cost with a predetermined threshold value.

12. The apparatus as claimed in claim 9 , further comprising:

an allocation planning unit configured to determine an execution plan of the live migrations of a plurality of the virtual machines, based on the estimated costs; and

a migration execution unit configured to execute the live migrations based on an allocation plan.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2014
From: DOI, TSUNEHISA
To: FUJITSU LIMITED
Reel/Frame 033399/0236 →
Continuity (2)
Continuation PCTJP2012050273 · Jan 10, 2012
Related Publication 20140298338A1 · Oct 2, 2014