IP Library Granted Patent US 9,342,375
Granted Patent B2
US 9,342,375 · App. 13/282,394 · Granted May 17, 2016

Managing workload at a data center

Inventors: Chris D. Hyser (Victor, NY); Martin Arlitt (Calgary, CA); Tahir Cader (Liberty Lake, WA); Cullen E. Bash (Los Gatos, CA); Richard Shaw Kaufmann (San Diego, CA)
Assignee: Hewlett Packard Enterprise Development LP
G06F9/5094G05B2219/2639Y02B60/142Y02E50/343
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,342,375
App. No.
13/282,394
Filed
Oct 26, 2011
Granted
May 17, 2016
Kind
B2
Art Unit
2121
USPC
700/286
Abstract

Systems and methods of managing workload at a data center are disclosed. An example method may include actively managing workload at a data center to realize energy savings. The method may also include providing excess power generated for the data center onto a utility grid.

Claims (26)

1. A method comprising:

actively managing workload at a data center to realize energy savings, wherein the actively managing includes increasing spot pricing for a computing service provided by the data center to reduce the workload at the data center, wherein the computing service includes running at least a portion of the workload on processing resources of the data center; and

providing excess power generated for the data center onto a utility grid when a current grid price is higher than estimated self-generated energy costs, wherein providing excess power comprises configuring a subset of a plurality of off-grid resources to produce excess biogas during off peak usage, wherein the subset of the plurality of off-grid resources comprise a subset of a plurality of digesters producing biogas for a micro-grid of the data center, and the subset of digesters have greater biogas storage capacity than other digesters on the micro-grid, and the subset of digesters have a faster rate of biogas production than the other digesters on the micro-grid.

2. The method of claim 1 , further comprising responding to an increase in price being paid for providing the excess power onto the utility grid by reducing the workload at the data center.

3. The method of claim 1 , further comprising responding to a power shortage on the utility grid by reducing the workload at the data center to provide the excess power generated for the data center onto the utility grid.

4. The method of claim 1 , further comprising reducing quality of service of the computing service to reduce the workload at the data center.

5. The method of claim 1 , further comprising modifying quality of service for a green class of service provided by the data center to reduce the workload at the data center.

6. The method of claim 1 , further comprising generating the excess power for the data center on an energy micro-grid separate from the utility grid.

7. The method of claim 6 , further comprising generating the excess power using renewable resources.

8. The method of claim 1 , further comprising storing ice at the data center, wherein the stored ice is used for cooling the data center to reduce power consumption at the data center.

9. The method of claim 8 , wherein at least some excess power realized by using the stored ice, is transferred to the utility grid.

10. A system including machine readable instructions stored in a non-transient computer-readable medium, the machine readable instructions comprising instructions executable to cause a processor to:

actively manage workload at a data center to realize energy savings, wherein to actively manage the workload the processor is to increase spot pricing for a computing service provided by the data center to reduce the workload at the data center, wherein the computing service includes running at least a portion of the workload on processing resources of the data center;

estimate self-generated energy costs of the data center; and

provide excess power generated for the data center onto a utility grid when a current grid price is higher than the estimated self-generated energy costs, wherein the excess power is provided by a subset of a plurality of digesters producing biogas for a micro-grid of the data center, and the subset of digesters have greater biogas storage capacity than other digesters on the micro-grid, and the subset of digesters have a faster rate of biogas production than the other digesters on the micro-grid.

11. The system of claim 10 , wherein the excess power is provided onto the utility grid in response to an increase in price being paid for the excess power.

12. The system of claim 10 , wherein the excess power is provided onto the utility grid in response to a predicted brownout or blackout event on the utility grid to help prevent an actual brownout or blackout event.

13. The system of claim 10 , wherein the machine readable instructions further comprise instructions executable to cause the processor to modify quality of service for a green class to reduce the workload at the data center.

14. The system of claim 10 , wherein the machine readable instructions further comprise instructions executable to cause the processor to manage ice storage at the data center, the ice storage used for cooling the data center.

15. The system of claim 14 , wherein the machine readable instructions further comprise instructions executable to cause the processor to transfer at least some excess power realized from energy savings at the data center using the ice storage, to the utility grid.

16. A system comprising:

at least one processor to:

actively manage workload at a data center to realize energy savings, wherein actively managing includes increasing spot pricing for a computing service provided by the data center to reduce the workload at the data center, wherein the computing service includes running at least a portion of the workload on processing resources of the data center;

estimate self-generated energy costs of the data center; and

provide excess power generated for the data center onto a utility grid when a current grid price is higher than the estimated self-generated energy costs, wherein the excess power is provided by a subset of a plurality of digesters producing biogas for a micro-grid of the data center, and the subset of digesters have greater biogas storage capacity than other digesters on the micro-grid, and the subset of digesters have a faster rate of biogas production than the other digesters on the micro-grid.

17. The system of claim 16 , wherein the excess power is provided onto the utility grid in response to an increase in price being paid for the excess power.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE NAME PREVIOUSLY RECORDED ON REEL 027204 FRAME 0930. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Apr 13, 2016
From: HYSER, CHRIS D.; ARLITT, MARTIN; CADER, TAHIR; BASH, CULLEN E.; KAUFMANN, RICHARD SHAW
To: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
Reel/Frame 038427/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 9, 2015
From: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
To: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Reel/Frame 037079/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 6, 2011
From: HYSER, CHRIS D.; ARLITT, MARTIN; CADER, TAHIR; BASH, CULLEN E.; KAUFMANN, RICHARD SHAW
To: COMPANY, HEWLETT-PACKARD
Reel/Frame 027204/0930 →
Continuity (1)
Related Publication 20130111494A1 · May 2, 2013