IP Library Granted Patent US 9,441,390
Granted Patent B2
US 9,441,390 · App. 14/820,299 · Granted Sep 13, 2016

Storage tank construction method

Inventor: Saori Ijichi (Tokyo, JP)
Assignee: IHI CORPORATION
E04H7/20E04B1/167E04B2/8635E04H7/18E04B2103/02E04H7/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,441,390
App. No.
14/820,299
Granted
Sep 13, 2016
Kind
B2
Abstract

The storage tank construction method includes a step of forming a side wall while a temporary opening is provided, a step of fitting precast concrete slabs into respective inner and outer wall sides of the temporary opening to close the inner and outer wall sides of the temporary opening, and a step of pouring concrete between the precast concrete slabs using the precast concrete slabs as molds to block the temporary opening.

Claims (14)

1. A storage tank construction method comprising:

a step of forming a side wall while a temporary opening is provided;

a step of fitting precast concrete slabs into respective inner and outer wall sides of the temporary opening to close the inner and outer wall sides of the temporary opening, each of the precast concrete slabs including a first surface and a second surface opposite to the first surface, and the first surfaces of the precast concrete slabs facing each other when the precast concrete slabs are fit into the respective inner and outer wall sides of the temporary opening; and

a step of pouring concrete between the precast concrete slabs using the precast concrete slabs as molds to block the temporary opening,

wherein metal plates are previously bonded to the first surfaces of the precast concrete slabs,

wherein a first connecting fitting which is configured to be connected to a side-wall connecting fitting embedded in the side wall is embedded in the precast concrete slab fit into the inner wall side of the temporary opening so that the first connecting fitting is exposed to the first surface of the precast concrete slab fit into the inner wall side of the temporary opening,

wherein a shape of the metal plate, which is bonded to the first surface of the precast concrete slab fit into the inner wall side of the temporary opening, has a shape that avoids a position at which the first connecting fitting is embedded in the precast concrete slab, and

wherein a second connecting fitting which is configured to be connected to a side-wall connecting fitting embedded in the side wall is embedded in the precast concrete slab fit into the outer wall side of the temporary opening so that the second connecting fitting is exposed to the second surface of the precast concrete slab fit into the outer wall side of the temporary opening.

2. The storage tank construction method according to claim 1 , wherein, after the precast concrete slabs are fitted into the respective inner and outer wall sides of the temporary opening, a separator is mounted between the precast concrete slabs to maintain a constant interval between the precast concrete slabs, and then the concrete is poured between the precast concrete slabs.

3. The storage tank construction method according to claim 1 , wherein

cutout grooves are formed in an upper end of the precast concrete slab fit into the outer wall side of the temporary opening, and in an upper end of the metal plate which is bonded to the first surface of the precast concrete slab fit into the outer wall side of the temporary opening.

4. The storage tank construction method according to claim 2 , wherein:

a nut configured to be screwed to one end side of the separator is embedded in a center of the first surface of the precast concrete slab fit into the inner wall side of the temporary opening such that the nut is exposed to the first surface of the precast concrete slab fit into the inner wall side of the temporary opening, and a through-hole configured to communicate with the nut is formed in a center of the metal plate which is bonded to the first surface of the precast concrete slab fit into the inner wall side of the temporary opening; and

through-holes for inserting the separator are formed in a center of the precast concrete slab fit into the outer wall side of the temporary opening, and in a center of the metal plate which is bonded to the first surface of the precast concrete slab fit into the outer wall side of the temporary opening.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 6, 2015
From: IJICHI, SAORI
To: IHI CORPORATION
Reel/Frame 036272/0328 →
Priority Claims (1)
JP 2013-106465 · May 20, 2013 · national
Continuity (2)
Continuation PCTJP2014063299 · May 20, 2014
Related Publication 20150345167A1 · Dec 3, 2015