IP Library Granted Patent US 9,460,133
Granted Patent B2
US 9,460,133 · App. 14/356,514 · Granted Oct 4, 2016

Data management apparatus, data management method and data management program

Inventor: Akira Nojima (Minato-ku, JP)
Assignee: TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION
G06F17/30312G05B19/4183G05B2219/37532G05B2219/37533Y02P90/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,460,133
App. No.
14/356,514
Granted
Oct 4, 2016
Kind
B2
Abstract

An apparatus includes: the arrangement pattern sampling data generator 111 b for generating the arrangement pattern sampling; the bit pattern sampling data generator 111 c for, each time process data are acquired from the controllers 51 to 5 n , generating the bit pattern sampling; the calculator 111 d for calculating the number-of-change-points threshold value indicating the threshold value for the number of process data each including the chronological change on the basis of the data size needed to store the elapsed times and the sampling cycles (the acquisition intervals) for the process data acquisition; and the storage controller 111 a for storing any one of the bit pattern sampling data and the arrangement pattern sampling data, which requires a smaller storage capacity, into the storage unit 113.

Claims (24)

1. A data management apparatus comprising:

an arrangement pattern sampling data generator for generating arrangement pattern sampling data in which process data acquired from a monitoring target and including a chronological change, and an elapsed time from a reference point of time to a point of time of the chronological change are associated with each other;

a bit pattern sampling data generator for, each time process data are acquired from the monitoring target, generating bit pattern sampling data in which a flag indicating a presence or an absence of the chronological change in the process data acquired from the monitoring target, and the process data acquired from the monitoring target and including the chronological change are associated with each other;

a storage controller for storing any one of the bit pattern sampling data and the arrangement pattern sampling data, which requires a smaller storage capacity, into a storage;

a plant control system coupled with the storage and configured to retrieve any one of the stored bit pattern sampling data and the stored arrangement pattern sampling data from the storage to control a plant including the monitoring target.

2. The data management apparatus of claim 1 further comprising:

a calculator for calculating a number-of-change-points threshold value indicating a threshold value for a number of process data each including the chronological change based on a data size needed to store the elapsed time and acquisition intervals for a process data acquisition;

wherein each time process data are acquired from the monitoring target, the storage controller stores the bit pattern sampling data if the number of process data each including the chronological change is greater than the change-point threshold value calculated by the calculator, or stores the arrangement pattern sampling data if the number of process data each including the chronological change is less than the change-point threshold value calculated by the calculator.

3. An data management method comprising:

generating arrangement pattern sampling data in which process data acquired from a monitoring target and including a chronological change, and an elapsed time from a reference point of time to a point of time of the chronological change, are associated with each other;

each time process data are acquired from the monitoring target, generating bit pattern sampling data in which a flag indicating a presence or an absence of the chronological change in the process data acquired from the monitoring target, and the process data acquired from the monitoring target and including the chronological change are associated with each other;

storing any one of the bit pattern sampling data and the arrangement pattern sampling data, which requires a smaller storage capacity, into a storage; and

retrieving any one of the stored bit pattern sampling data and the stored arrangement pattern sampling data from the storage to control a plant including the monitoring target by a plant control system coupled with the storage.

4. The data management method of claim 3 further comprising:

calculating a number-of-change-points threshold value indicating a threshold value for a number of process data each including the chronological change based on a data size needed to store the elapsed time and acquisition intervals for a process data acquisition;

wherein each time process data are acquired from the monitoring target, the bit pattern sampling data is stored in the storage controlling step if the number of process data each including the chronological change is greater than the change-point threshold value calculated during the calculation of the number-of-change-points threshold value or the arrangement pattern sampling data is stored in the storage controlling step if the number of process data each including the chronological change is less than the change-point threshold value calculated during the calculation of the number-of-change-points threshold value.

5. A data management program causing a computer to execute:

generating arrangement pattern sampling data in which process data acquired from a monitoring target and including a chronological change, and an elapsed time from a reference point of time to a point of time of the chronological change are associated with each other;

each time process data are acquired from the monitoring target, generating bit pattern sampling data in which a flag indicating a presence or an absence of the chronological change in the process data acquired from the monitoring target, and the process data acquired from the monitoring target and including the chronological change are associated with each other;

storing any one of the bit pattern sampling data and the arrangement pattern sampling data, which requires a smaller storage capacity, into a storage; and

retrieving any one of the stored bit pattern sampling data and the stored arrangement pattern sampling data from the storage to control a plant including the monitoring target by a plant control system coupled with the storage.

6. The data management program of claim 5 causing the computer to execute:

calculating a number-of-change-points threshold value indicating a threshold value for a number of process data each including the chronological change based on a data size needed to store the elapsed time and acquisition intervals for process data acquisitions;

wherein each time process data are acquired from the monitoring target, the bit pattern sampling data is stored during the storing if the number of process data each including the chronological change is greater than the change-point threshold value calculated during the calculation of the number-of-change-points threshold value, and the arrangement pattern sampling data is stored during the storing if the number of process data each including the chronological change is less than the change-point threshold value calculated during the calculation of the number-of-change-points threshold value.

Assignments (2)
CHANGE OF NAME Recorded Apr 26, 2024
From: TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION
To: TMEIC CORPORATION
Reel/Frame 067244/0359 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 6, 2014
From: NOJIMA, AKIRA
To: TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION
Reel/Frame 032832/0400 →
Continuity (1)
Related Publication 20140297638A1 · Oct 2, 2014