IP Library Granted Patent US 9,593,867
Granted Patent B2
US 9,593,867 · App. 13/928,656 · Granted Mar 14, 2017

Large scale ground mounting system for photovoltaics

Inventors: Martin Seery (San Rafael, CA); Isaac Childress (San Anselmo, CA); Tim Henson (San Francisco, CA); Kate Miller (Berkeley, CA); Clara Nagy (San Francisco, CA)
Assignee: SunLink Corporation
F24J2/5232F24J2/5258F24J2/5264H02S20/00F24J2/526H02S20/10Y02E10/47Y02E10/50
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,593,867
App. No.
13/928,656
Granted
Mar 14, 2017
Kind
B2
Abstract

A mounting system for mounting photovoltaic panels, which provides for a quick and easy assembly. The ground mount system for photovoltaic panels includes at least two vertical supports, wherein attached to each vertical support are a T plate connected to a vertical support, a post frame connected to the T plate, and a kicker brace connected between the vertical support and the post frame. The ground mount system may further include a first C-Purlin connected to a first end of the post frame, to a second C-Purlin connected to a second end of the post frame, a purlin tie connected between the first C-Purlin and the second C-Purlin. Panel clamps secure a photovoltaic panel assembly to the mounting system.

Claims (36)

1. A ground mount system for photovoltaic panels, the system comprising:

at least two vertical supports, wherein attached to each vertical support are:

a flat T plate having a vertical segment and a crossing segment, wherein the vertical segment and crossing segment are not perpendicular, the vertical segment connected to a vertical support;

a post frame connected to the crossing segment of the flat T plate, the length of the post frame being greater than the length of the crossing segment;

a kicker brace connected between the vertical support and the post frame;

a first C-Purlin connected to a first end of the post frame;

a second C-Purlin connected to a second end of the post frame;

a panel assembly frame of photovoltaic panels;

a purlin tie connected between the first C-Purlin and the second C-Purlin, the purlin tie aligned beneath the panel assembly frame;

at least two north rail clamps; and

at least two south rail clamps;

wherein the north and south rail clamps secure the panel assembly frame to the first and second C-Purlins, respectively.

2. The ground mount system of claim 1 , further comprising:

a purlin torsion brace connected between the second C-Purlin and the panel assembly frame.

3. The ground mount system of claim 1 , wherein the T plate has vertical slots to allow for variations in ground height during assembly.

4. The ground mount system of claim 1 , wherein the panel assembly frame comprises:

a west U-rail and an east U-rail formed in a “U” shape, and at least one panel clamp assembly to attach each photovoltaic panel to the U-rails.

5. The ground mount system of claim 4 , wherein the panel clamp assembly comprises:

a panel clamp top;

a panel clamp T configured to slide into a U-rail and twist 90 degrees to secure the clamp in the U-rail; and

a bolt and nut attaching the panel clamp top and the panel clamp T.

6. A ground mount system for photovoltaic panels, the system comprising:

at least two vertical supports, wherein attached to each vertical support are:

a flat T plate having a vertical segment and a crossing segment, wherein the vertical segment and crossing segment are not perpendicular, the vertical segment connected to a vertical support;

a post frame connected to the crossing segment of the flat T plate the length of the post frame being greater than the length of the crossing segment; and

a kicker brace connected between the vertical support and the post frame;

a first C-Purlin connected to a first end of the post frame;

a second C-Purlin connected to a second end of the post frame;

a purlin tie connected between the first C-Purlin and the second C-Purlin, the purlin tie aligned above the post frame;

a photovoltaic panel assembly frame, the assembly frame comprising a plurality of photovoltaic panels, at least two rails, and at least two angle plates;

at least two north rail clamps; and

at least two south rail clamps;

wherein the north and south rail clamps secure the panel assembly to the first and second C-Purlins, respectively.

7. The ground mount system of claim 6 , wherein the kicker brace connects to the vertical support with two kicker clips.

8. The ground mount system of claim 7 , wherein each kicker clip comprises at least one tooth to engage the vertical support.

9. The ground mount system of claim 6 , further comprising a purlin torsion brace connected between the second C-Purlin and the panel assembly frame.

Assignments (8)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 5, 2020
From: MULTIPLIER CAPITAL II ACQUISITION LLC
To: COROSOLAR LLC
Reel/Frame 052033/0179 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 3, 2020
From: SUNLINK CORPORATION
To: MULTIPLIER CAPITAL II ACQUISITION, LLC
Reel/Frame 052000/0846 →
SECURITY INTEREST Recorded Dec 19, 2017
From: SUNLINK CORPORATION
To: MULTIPLIER CAPITAL II, LP
Reel/Frame 044438/0374 →
SECURITY INTEREST Recorded Feb 9, 2017
From: SUNLINK CORPORATION
To: HERITAGE BANK OF COMMERCE
Reel/Frame 041208/0133 →
RELEASE OF SECURITY INTEREST Recorded Feb 8, 2017
From: SILICON VALLEY BANK
To: SUNLINK CORPORATION
Reel/Frame 041664/0352 →
SECURITY INTEREST Recorded Jul 2, 2015
From: SUNLINK CORPORATION
To: SILICON VALLEY BANK
Reel/Frame 035973/0791 →
SECURITY INTEREST Recorded Nov 21, 2014
From: SUNLINK CORPORATION
To: UNION BAY CAPITAL PARTNERS I, LLC
Reel/Frame 034229/0303 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 18, 2013
From: SEERY, MARTIN; CHILDRESS, ISAAC; HENSON, TIMOTHY J.; MILLER, CATHERINE; NAGY, CLARA
To: SUNLINK CORPORATION
Reel/Frame 031235/0193 →
Continuity (2)
Provisional Application 61669919 · Jul 10, 2012
Related Publication 20140014155A1 · Jan 16, 2014