IP Library Granted Patent US 9,616,620
Granted Patent B2
US 9,616,620 · App. 13/513,559 · Granted Apr 11, 2017

Installation for the layered construction of a shaped body, comprising a coating device cleaner

Inventors: Rainer Hoechsmann (Langenneufnach, DE); Alexander Mueller (Koenigsbrunn, DE)
Assignee: ExOne GmbH
B29C67/0096B05C19/04B05C19/06B29C67/0062B29C41/12B29C67/0077B29C67/0081
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,616,620
App. No.
13/513,559
Granted
Apr 11, 2017
Kind
B2
Abstract

A plant ( 100 ) for the layered construction of a molded body comprises a coating device ( 400 ) and a coating device cleaner ( 600 ). The coating device is movable horizontally across a construction field for applying a uniform layer of construction material to be solidified to the construction field and has an elongate metering shaft ( 410 ), at the lower side of which a longitudinal slot ( 412 ) is provided for outputting the construction material as the metering shaft ( 410 ) moves across the construction field. The coating device cleaner ( 600 ) is mounted on a construction frame ( 150 ) of the plant and serves for cleaning the metering shaft ( 410 ). The coating device cleaner ( 600 ) comprises an elongate wiper element ( 610 ) that is received under the metering shaft ( 410 ) of the coating device ( 400 ) at least in part in a construction material collection container ( 620 ).

Claims (15)

1. Plant for the layered construction of a molded body by forming layers of construction material lying one upon another, on a construction field, and by selectively solidifying a partial area of the respective construction material layer prior to forming the next layer, comprising:

a coating device which is movable horizontally across the construction field for applying a uniform layer of the construction material to be solidified to the construction field, and comprises an elongate metering shaft, at the lower side of which a longitudinal slot is provided for outputting the construction material as the metering shaft moves across the construction field, and

a stationary coating device cleaner mounted on a construction frame of the plant below the coating device for cleaning the lower end and the longitudinal slot of the metering shaft, comprising an elongate wiper element that is received below the metering shaft of the coating device at least in part in a construction material collection container,

wherein the length of the wiper element is greater than or equal to the length of the metering shaft,

wherein the wiper element is supported rotatably and is rotatably drivable by a wiper element drive for making a relative motion between the wiper element and the metering shaft, and

wherein the coating device is moveable to the coating device cleaner, in order to wipe away construction material adhering to the lower side of the metering shaft and to wipe the longitudinal slot of the metering shaft, in order to remove obstructions.

2. Plant according to claim 1 , wherein the wiper element is a brush.

3. Plant according to claim 1 , further comprising a deflector plate which is arranged within the construction material collection container in such a manner that construction material that is stripped off the metering shaft by means of the wiper element is deflected by the deflector plate to the lower side of the construction material collection container.

4. Plant according to claim 1 , wherein the construction material collection container leads to a reservoir.

5. Plant according to claim 4 , wherein the reservoir comprises a lower output opening provided in an exterior wall of the plant housing, through which the construction material collected in the reservoir is capable of being removed.

6. Plant according to claim 5 , wherein the output opening is formed above a reservoir outlet trough to which the reservoir leads.

7. Plant according to claim 1 , wherein the elongate metering shaft is funnel-shaped in cross-section.

8. The plant according to claim 1 , further comprising a controller configured such that, following a predetermined number of coating displacements or depending on a sensor signal which indicates whether it is necessary to clean the metering shaft, the controller controls a drive of the coating device in such a manner that the coating device is moved to the coating device cleaner, and controls the drive of the wiper element for making the relative motion.

9. The plant according to claim 4 , wherein the reservoir comprises a storage funnel for excessive construction material.

10. The plant according to claim 5 , wherein the construction material collected in the reservoir is capable of being removed by withdrawal by suction.

Assignments (2)
CHANGE OF ADDRESS Recorded Dec 8, 2016
From: EXONE GMBH
To: EXONE GMBH
Reel/Frame 040851/0837 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 21, 2012
From: HOECHSMANN, RAINER; MUELLER, ALEXANDER
To: EXONE GMBH
Reel/Frame 028822/0774 →
Priority Claims (1)
DE 10 2009 056 687 · Dec 2, 2009 · national
Continuity (1)
Related Publication 20130000553A1 · Jan 3, 2013