IP Library Granted Patent US 9,647,283
Granted Patent B2
US 9,647,283 · App. 14/627,290 · Granted May 9, 2017

Measurement device for measuring voltages along a linear array of voltage sources

Inventors: John Matthew Fisher (San Jose, CA); Ian Russell (Sunnyvale, CA); Chad Pearson (Mountain View, CA); Robert Hintz (San Jose, CA); Nathan Ben Erlin (San Jose, CA); David Edmonston (Santa Cruz, CA); Stephen Couse (Sunnyvale, CA); Michael Dubuk (San Mateo, CA)
Assignee: BLOOM ENERGY CORPORATION
H01M8/04559G01R1/06705G01R19/0084G01R31/3606H01M8/04552G01R1/07G01R31/36G01R31/362G01R31/3627G01R31/3631G01R31/3658H01M8/04537H01M8/04544H01M10/482Y02E60/50
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,647,283
App. No.
14/627,290
Granted
May 9, 2017
Kind
B2
Abstract

A measurement device for measuring voltages along a linear array of voltage sources, such as a fuel cell stack, includes at least one movable contact or non-contact voltage probe that measures a voltage of an array element.

Claims (9)

1. A fuel cell system comprising:

at least one fuel cell stack; and

a measuring device comprising at least one movable contact or non-contact voltage probe that is configured to be propelled along the fuel cell stack to measure a voltage of fuel cell stack elements;

a movable carriage;

one or more probe supports suspended from the movable carriage by swing arms, wherein the at least one probe is supported by the one or more probe supports and wherein the swing arms allow the one or more probe supports to swing freely below the movable carriage;

a screw mechanism for imparting linear motion to the carriage in a vertical direction; one or more guide rails and wherein the guide rails guide the movable carriage parallel to the fuel cell stack;

a base and one or more supporting spines, wherein the one or more guide rails and the one or more spines are attached to the base;

an electrical conductor or conductive chain connected to the at least one probe for receiving a signal from the fuel cell stack; and

a signal processor configured to receive the signal from the electrical conductor and to determine a voltage from the signal.

Assignments (2)
RELEASE OF SECURITY INTEREST Recorded Nov 29, 2018
From: U.S. BANK NATIONAL ASSOCIATION, AS COLLATERAL AGENT
To: BLOOM ENERGY CORPORATION
Reel/Frame 047686/0121 →
SECURITY INTEREST Recorded Dec 15, 2015
From: BLOOM ENERGY CORPORATION
To: U.S. BANK NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 037301/0093 →
Continuity (3)
Division 13556794 · Jul 24, 2012
Provisional Application 61511305 · Jul 25, 2011
Related Publication 20150162631A1 · Jun 11, 2015