IP Library Granted Patent US 9,689,732
Granted Patent B1
US 9,689,732 · App. 13/168,496 · Granted Jun 27, 2017

Data analysis tool for sewer systems

Inventors: Luis A. Montestruque (South Bend, IN); Patrick M. Henthorn (South Bend, IN); Brent P. Hussung (Mishawaka, IN)
Assignee: EMNET, LLC
G01F23/00G01F1/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,689,732
App. No.
13/168,496
Granted
Jun 27, 2017
Kind
B1
Abstract

An analysis tool for monitoring and displaying the real time and historical hydraulic conditions in a sewer system as measured by monitors distributed throughout the sewer system and associated weather data. Data about the hydraulic conditions of the sewer system are displayed in a graphical display that incorporates a visual representation of the sewer system infrastructure.

Claims (28)

1. A method of processing and displaying hydraulic conditions along a length of a pipe of a sewer system, said method executed on a computing device including a processor for executing a program and a memory for storing the program, the method comprising:

receiving, for a period of time, time-stamped water level data from a plurality of water level monitors each of which is disposed to measure water levels upstream or downstream of an outfall located in said sewer system;

accepting a user-selected time within said period of time;

determining, for each of said plurality of water level monitors, one or more values of water level data at said accepted user-selected time from said time-stamped water level data; and

displaying, on a display, a visual representation of said outfall at said user-selected time, said visual representation of said outfall having a vertical bar object associated with said outfall, and wherein said vertical bar object indicates a value of water level in said pipe located upstream from said outfall, a level at which water will overflow out of said sewer system, and a level of water downstream of said outfall, such that a viewer of said display is allowed to determine for said user selected time if water will stay in said sewer system, will flow from said sewer system to a reservoir, and/or will flow from said reservoir into said sewer system.

2. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 1 , further comprising:

displaying, on said display, a schematic view of said pipe at said user-selected time according to a vertical scale relative to a ground elevation, said schematic view including: 1) a variation of pipe height along said pipe and 2) a visual indication of height of water along said length of said pipe utilizing one or more of said values of water level data along said pipe, such that said water level and headroom along said length of said pipe are displayed.

3. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 1 , further comprising:

displaying, on said display, a plurality of water flow rate gauges, each of which corresponds to one of a plurality of water flow rate monitors, and each of said plurality of rate gauges presents flow conditions at said user-selected time along said length of said pipe that are determined by a corresponding water flow rate monitor.

4. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 1 , wherein a visual representation of said length of pipe is displayed according to a vertical scale relative to said length of pipe diameter.

5. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 1 , further includes displaying a time control tool on said display, and where said accepting accepts a user input to said time control tool.

6. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 5 , wherein said time control tool includes a date selector, and wherein said user input is a date and time selected from a drop-down menu or calendar on said display.

7. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 5 , wherein displaying further includes displaying said water level and/or said flow rates at sequential times, where said time control tool includes media control buttons, where said media control button includes a play button, such that when said play button is selected, said display presents said water level and/or said flow rates at sequential times.

8. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 7 , wherein said media control buttons tool includes a pause button, a back button and a forward button, such that said user may control said display of water level and said flow rates.

9. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 5 , wherein said time control tool includes a time slide bar, and wherein said user input is movement of a sliding element on said display.

10. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 2 , wherein said plurality of water level monitors includes water level monitors in a trunk lines generally providing water into a main pipe of said sewer system, said method further comprising:

displaying, on said display, a schematic view of said trunk line, wherein said schematic view of said trunk lines is a visual representation of water level and headroom in said trunk line.

11. The method of processing and displaying hydraulic conditions along a length of pipe of a sewer system of claim 1 , wherein said water level downstream of said outfall is a river stage.

12. A method of processing and displaying hydraulic conditions along a length of a pipe of a sewer system, said method executed on a computing device including a processor for executing a program and a memory for storing the program, the method comprising:

receiving, for a period of time, time-stamped water level data from a plurality of water level monitors each of which is disposed to measure water levels upstream or downstream of an outfall located in said sewer system;

accepting a user-selected time within said period of time;

determining, for each of said plurality of water level monitors, one or more values of water level data at said accepted user-selected time from said time-stamped water level data; and

displaying, on a display, 1) a visual representation of said outfall at said user-selected time, said visual representation of said outfall indicating a value of water level in said pipe located upstream from said outfall, a level at which water will overflow out of said sewer system, and a level of water downstream of said outfall, such that a viewer of said display is capable of determining if water will stay in said sewer system, will flow from said sewer system to a reservoir, and/or will flow from said reservoir into said sewer system and 2) a visual representation of said length of pipe displayed according to a vertical scale relative to said length of pipe diameter.

13. A method of processing and displaying hydraulic conditions along a length of a pipe of a sewer system, said method executed on a computing device including a processor for executing a program and a memory for storing the program, the method comprising:

receiving, for a period of time, time-stamped water level data from a plurality of water level monitors each of which is disposed to measure water levels upstream or downstream of an outfall located in said sewer system;

accepting a user-selected time within said period of time;

determining, for each of said plurality of water level monitors, one or more values of water level data at said accepted user-selected time from said time-stamped water level data;

displaying, on a display, 1) a visual representation of said outfall at said user-selected time, said visual representation of said outfall indicating a value of water level in said pipe located upstream from said outfall, a level at which water will overflow out of said sewer system, and a level of water downstream of said outfall, such that a viewer of said display is capable of determining if water will stay in said sewer system, will flow from said sewer system to a reservoir, and/or will flow from said reservoir into said sewer system and 2) a plurality of water flow rate gauges, each of which corresponds to one of a plurality of water flow rate monitors, and each of said plurality of rate gauges presents flow conditions at said user-selected time along said length of said pipe that are determined by a corresponding water flow rate monitor.

Assignments (2)
MERGER Recorded Nov 29, 2023
From: EMNET, LLC
To: XYLEM VUE INC.
Reel/Frame 065697/0021 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2011
From: MONTESTRUQUE, LUIS A.; HENTHORN, PATRICK M.; HUSSUNG, BRENT P.
To: EMNET, LLC
Reel/Frame 026780/0227 →
Continuity (1)
Provisional Application 61398345 · Jun 24, 2010