IP Library Granted Patent US 9,890,891
Granted Patent B2
US 9,890,891 · App. 14/984,858 · Granted Feb 13, 2018

Liner assembly for pipeline repair or reinforcement and method of installing same

Inventor: Cameron Manners (Oshawa, CA)
Assignee: NU FLOW TECHNOLOGIES 2000 INC.
F16L55/1654
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,890,891
App. No.
14/984,858
Granted
Feb 13, 2018
Kind
B2
Abstract

A liner assembly for pipeline repair or reinforcement includes an outer tubular liner, and an inner malleable inflatable bladder fabricated of a resilient material and positioned longitudinally within the tubular liner. The inflatable bladder has an outer surface configured to bond to the tubular liner and an inner surface configured to provide a resilient surface on the pipeline interior.

Claims (35)

1. A method of installing a liner assembly for a pipeline repair or reinforcement, the method comprising:

securing an installation gear to ends of an inner malleable inflatable bladder;

forming a textured surface on an outer surface of the inflatable bladder after securing the installation gear to the ends thereof;

pulling a prepared liner assembly into position in the pipeline, the liner assembly comprising an outer tubular liner, the inner malleable inflatable bladder positioned longitudinally within the tubular liner, and the installation gear secured to the ends of the inner malleable inflatable bladder, the inflatable bladder being fabricated of a resilient material and having the textured outer surface configured to bond to the tubular liner and an inner surface configured to provide a resilient surface on the pipeline interior, the tubular liner and the outer surface being wetted with a curable compound;

introducing fluid into the inflatable bladder so that the inflatable bladder expands to bring the tubular liner into firm contact with an interior surface of the pipeline;

maintaining the liner assembly in an inflated condition for a time period sufficient for the tubular liner and the outer surface of the inflatable bladder to cure; and

deflating the inflatable bladder and retrieving at least a portion of the liner assembly from the pipeline.

2. The method of claim 1 , wherein the textured outer surface is one or more of a roughened surface and a porous surface.

3. The method of claim 2 , wherein the roughened surface is formed by one or more of mechanical abrasion and chemical abrasion.

4. The method of claim 1 , wherein the liner assembly further comprises a protective sheathing surrounding the tubular liner.

5. The method of claim 4 , wherein the protective sheathing is fitted to the outer surface of the tubular liner.

6. The method of claim 4 , wherein the protective sheathing comprises a first longitudinal edge and a second longitudinal edge, the second longitudinal edge being adapted to overlap the first longitudinal edge.

7. The method of claim 6 , wherein the overlap is tack welded.

8. The method of claim 1 , wherein the inflatable bladder has a longitudinal over-expansion inhibiting element therein.

9. The method of claim 8 , wherein the longitudinal over-expansion inhibiting element is a longitudinal strap.

10. The method of claim 8 , wherein the inflatable bladder further comprises a radial over-expansion inhibiting structure.

11. The method of claim 10 , wherein the radial over-expansion inhibiting structure comprises sleeves adjacent opposite ends of the liner assembly.

12. The method of claim 1 , wherein said forming a textured surface on an outer surface of the inflatable bladder comprises one or more of:

mechanically abrading the outer surface of the inflatable bladder, and

chemically abrading the outer surface of the inflatable bladder.

13. The method of claim 1 , wherein said retrieving at least the portion of the liner assembly from the pipeline comprises retrieving an unbonded portion of the inflatable bladder from the pipeline.

14. The method of claim 13 , further comprising:

prior to said retrieving, cutting unbonded portions of the inflatable bladder from a bonded portion of the inflatable bladder using a cutting tool.

15. The method of claim 1 , wherein the inflatable bladder having the textured outer surface is a first inflatable bladder, and the liner assembly comprises a second inflatable bladder positioned longitudinally within the first inflatable bladder,

wherein said introducing fluid comprises introducing fluid into the second inflatable bladder,

wherein said maintaining the liner assembly in the inflated condition comprises maintaining the liner assembly in the inflated condition for a time period sufficient for the tubular liner, the outer surface of the first inflatable bladder, and the curable compound to cure,

wherein said deflating the inflatable bladder comprises deflating the second inflatable bladder, and

wherein said retrieving at least the portion of the liner assembly from the pipeline comprises retrieving the second inflatable bladder from the pipeline.

16. The method of claim 1 , wherein the installation gear comprises a pull block secured to an installation end of the inner malleable inflatable bladder and an inflation block secured to an inflation end of the inner malleable inflatable bladder.

17. The method of claim 1 , wherein the liner assembly comprises:

an outer tubular liner;

a first inner malleable inflatable bladder fabricated of a resilient material and positioned longitudinally within the tubular liner, the first inflatable bladder having a textured outer surface configured to bond to the tubular liner and an inner surface configured to provide a resilient surface on the pipeline interior; and

a second malleable inflatable bladder positioned longitudinally within the first inflatable bladder, with the ends of the second inflatable bladder extending beyond the ends of the first inflatable bladder.

18. The method of claim 1 , wherein the tubular liner and the outer surface are wetted with the curable compound by delivering the curable compound to a space between the outer tubular liner and the inner malleable inflatable bladder at one of the ends of the inner malleable inflatable bladder.

19. The method claim 18 , wherein a protective sheathing surrounding the outer tubular liner is scored to facilitate migration of the curable compound out of the outer tubular liner so that it can contact an inside surface of a pipe.

Assignments (3)
RELEASE OF SECURITY INTEREST Recorded Jul 7, 2020
From: EICF AGENT LLC, AS AGENT
To: NU FLOW TECHNOLOGIES (2000) INC.; ORBIS INTELLIGENT SYSTEMS, INC.
Reel/Frame 053142/0689 →
SECURITY AGREEMENT Recorded Oct 4, 2018
From: NU FLOW TECHNOLOGIES (2000) INC.; ORBIS INTELLIGENT SYSTEMS, INC.
To: EICF AGENT LLC, AS AGENT
Reel/Frame 047641/0832 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 28, 2016
From: MANNERS, CAMERON
To: NU FLOW TECHNOLOGIES 2000 INC.
Reel/Frame 039033/0078 →
Continuity (2)
Provisional Application 62097816 · Dec 30, 2014
Related Publication 20160186911A1 · Jun 30, 2016