IP Library Granted Patent US 10,036,233
Granted Patent B2
US 10,036,233 · App. 14/601,711 · Granted Jul 31, 2018

Method and system for automatically adjusting one or more operational parameters in a borehole

Inventors: Weiting Tang (Tomball, TX); Blake C. Burnette (Tomball, TX); William D. Holcomb (The Woodlands, TX); Scott G. Nelson (Cypress, TX); Yong N. Kang (Houston, TX)
Assignee: BAKER HUGHES, A GE COMPANY, LLC
E21B41/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,036,233
App. No.
14/601,711
Filed
Jan 21, 2015
Granted
Jul 31, 2018
Kind
B2
Art Unit
2121
USPC
700/275
Abstract

An embodiment of a method of performing an energy industry operation includes: collecting historical data relating to one or more previously performed operations having a characteristic common to both the one or more previously performed operations and a proposed operation; planning the proposed operation based on the historical data, the proposed operation associated with one or more operational parameters; performing the proposed operation; measuring a condition during performance of the proposed operation and comparing the measured condition to the historical data; and automatically adjusting the one or more operational parameters based on the comparison.

Claims (32)

1. A method of performing an energy industry operation, comprising:

collecting historical data relating to one or more previously performed operations having a characteristic common to both the one or more previously performed operations and a proposed operation;

planning the proposed operation based on the historical data, the proposed operation associated with one or more operational parameters, and generating an operational plan prior to performing the proposed operation, the operational plan including a limit of the one or more operational parameters;

performing the proposed operation, wherein performing the proposed operation includes disposing a downhole component in a borehole in an earth formation and controlling the one or more operational parameters based on the operational plan and the operational parameter limit;

measuring a condition during performance of the proposed operation and comparing the measured condition to the historical data; and

automatically adjusting the one or more operational parameters based on the comparison.

2. The method of claim 1 , wherein collecting includes accessing a database of energy industry data taken from a plurality of operations, and identifying a subset of the plurality of operations having the common characteristic.

3. The method of claim 1 , wherein the common characteristic includes at least one of: geographic location, formation characteristics, type of operation, type of equipment used, and operational parameters.

4. The method of claim 1 , wherein the historical data includes measurements of operational parameters and conditions taken during the one or more previously performed operations.

5. The method of claim 1 , wherein planning includes recognizing a pattern in the historical data, associating the pattern with an event having an impact on an operation, and creating guidelines for performance of the proposed operation based on the pattern.

6. The method of claim 5 , wherein comparing includes comparing the pattern in the historical data to a pattern in the measured condition.

7. The method of claim 5 , wherein the one or more previous operations and the proposed operation include injecting fluid into a borehole, and the pattern includes at least one of a pattern of fluid pressure values and a pattern of temperatures measured during the one or more previously performed operations.

8. The method of claim 1 , wherein planning the proposed operation includes creating one or more rules to be followed during performance of the proposed operation.

9. The method of claim 8 , wherein adjusting includes automatically controlling the proposed operation by a processor based on the comparison and the one or more rules.

10. The method claim 1 , wherein planning includes applying predictive analytics to the historical data to identify patterns in the historical data associated with a problem that occurred in one or more of the previously performed operations.

11. A system for performing an energy industry operation, comprising:

a carrier configured to be disposed in a borehole in an earth formation, the carrier connected to a device for performing the energy industry operation; and

a processor configured to collect historical data relating to one or more previously performed operations having a characteristic common to both the one or more previously performed operations and a proposed operation; the processor configured to perform:

planning the proposed operation based on the historical data, the proposed operation associated with one or more operational parameters, and generating an operational plan prior to performing the proposed operation, the operational plan including a limit of the one or more operational parameters;

performing the proposed operation, wherein performing includes disposing the carrier in the borehole and controlling the one or more operational parameters by the device based on the operational plan and the operational parameter limit;

receiving measurement data, the measurement data associated with a condition measured during performance of the proposed operation;

comparing the measurement data to the historical data; and

automatically adjusting the one or more operational parameters based on the comparison.

12. The system of claim 11 , wherein collecting includes accessing a database of energy industry data taken from a plurality of operations, and identifying a subset of the plurality of operations having the common characteristic.

13. The system of claim 11 , wherein the common characteristic includes at least one of: geographic location, formation characteristics, type of operation, type of equipment used, and operational parameters.

14. The system of claim 11 , wherein the historical data includes measurements of operational parameters and conditions taken during the one or more previously performed operations.

15. The system of claim 11 , wherein planning includes recognizing a pattern in the historical data, associating the pattern with an event having an impact on an operation, and creating guidelines for performance of the proposed operation based on the pattern.

16. The system of claim 15 , wherein comparing includes comparing the pattern in the historical data to a pattern in the measured condition.

17. The system of claim 15 , wherein the one or more previous operations and the proposed operation include injecting fluid into a borehole, and the pattern includes at least one of a pattern of fluid pressure values and a pattern of temperatures measured during the one or more previously performed operations.

18. The system of claim 11 , wherein planning the proposed operation includes creating one or more rules to be followed during performance of the proposed operation.

19. The system of claim 18 , wherein adjusting includes automatically controlling the proposed operation by the processor based on the comparison and the one or more rules.

20. The system claim 11 , wherein planning includes applying predictive analytics to the historical data to identify patterns in the historical data associated with a problem that occurred in one or more of the previously performed operations.

Assignments (7)
SECURITY INTEREST Recorded Sep 17, 2024
From: BJ ENERGY SOLUTIONS. LLC
To: ECLIPSE BUSINESS CAPITAL LLC. AS AGENT
Reel/Frame 068970/0125 →
SECURITY INTEREST Recorded Dec 13, 2022
From: BJ ENERGY SOLUTIONS, LLC
To: ECLIPSE BUSINESS CAPITAL LLC
Reel/Frame 062116/0333 →
SECURITY INTEREST Recorded Jan 24, 2022
From: BJ ENERGY SOLUTIONS, LLC
To: BAIWIN FINANCING, LLC
Reel/Frame 058829/0708 →
IP ASSIGNMENT AGREEMENT Recorded Sep 2, 2020
From: BJ SERVICES, LLC; BJ SERVICES HOLDINGS CANADA ULC
To: BJ ENERGY SOLUTIONS, LLC (FORMERLY TES ASSET ACQUISITION, LLC)
Reel/Frame 053667/0333 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ADDRESS OF ASSIGNEE BJ SERVICES, LLC PREVIOUSLY RECORDED ON REEL 040804 FRAME 0552. ASSIGNOR(S) HEREBY CONFIRMS THE PATENT ASSIGNMENT AGREEMENT.. Recorded Jan 18, 2017
From: BAKER HUGHES INCORPORATED; BAKER HUGHES OILFIELD OPERATIONS, INC.
To: BJ SERVICES, LLC
Reel/Frame 041391/0934 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 29, 2016
From: BAKER HUGHES INCORPORATED; BAKER HUGHES OILFIELD OPERATIONS, INC.
To: BJ SERVICES, LLC
Reel/Frame 040804/0552 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 5, 2015
From: TANG, WEITING; BURNETTE, BLAKE C.; HOLCOMB, WILLIAM D.; NELSON, SCOTT G.; KANG, YONG N.
To: BAKER HUGHES INCORPORATED
Reel/Frame 034897/0190 →
Continuity (1)
Related Publication 20160208595A1 · Jul 21, 2016
Cited By (4)
US 12,287,444 US 12,292,539 US 12,467,354 US 12,663,555