IP Library Granted Patent US 10,041,318
Granted Patent B2
US 10,041,318 · App. 14/453,357 · Granted Aug 7, 2018

Full bore system without stop shoulder

Inventor: Dennis P. Nguyen (Pearland, TX)
Assignee: CAMERON INTERNATIONAL CORPORATION
E21B23/01E21B23/00E21B33/035E21B33/038E21B33/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,041,318
App. No.
14/453,357
Granted
Aug 7, 2018
Kind
B2
Abstract

A production assembly for controlling production from a well includes a wellhead and a tubing hanger assembly. The wellhead includes a bore formed through the wellhead with a first groove and a second groove each extending into the wellhead and axially spaced apart from each other. The tubing hanger assembly is installable in the wellhead and includes a load segment expandable into engagement with the first groove to support the tubing hanger assembly within the wellhead and a lock ring expandable into engagement with the second groove to secure the tubing hanger assembly within the wellhead.

Claims (44)

1. A production assembly for controlling production from a well, the assembly comprising:

a wellhead including a bore formed through the wellhead with a first groove and a second groove each extending into the wellhead and axially spaced apart from each other; and

a tubing hanger assembly installable in the wellhead and comprising:

a load segment expandable into engagement with the first groove to support the tubing hanger assembly within the wellhead; and

a lock ring expandable into engagement with the second groove to secure the tubing hanger assembly within the wellhead.

2. The assembly of claim 1 , wherein the wellhead does not include a support shoulder extending into the interior of the bore.

3. The assembly of claim 1 , wherein the tubing hanger assembly further comprises:

a load shoulder;

a tubing hanger supportable by the load shoulder; and

wherein the load segment is movably connected to the load shoulder.

4. The assembly of claim 3 , wherein the tubing hanger is positionable by a tubing hanger running tool onto the load shoulder to transfer support of the tubing hanger to the load shoulder.

5. The assembly of claim 1 , wherein the load segment is configured to expand into engagement with the first groove before the lock ring expands into engagement with the second groove.

6. The assembly of claim 1 , wherein the load segment is expandable into engagement with the first groove independently of the lock ring expandable into engagement with the second groove.

7. The assembly of claim 1 , wherein the tubing hanger assembly further comprises a first wedge and a second wedge, the first wedge being configured to be actuated by hydraulic fluid pressure to be moved within the bore of the wellhead to expand the load segment into engagement with the first groove, and the second wedge being configured to be actuated by mechanical force to move within the bore of the wellhead to expand the lock ring into engagement with the second groove.

8. The assembly of claim 1 , further comprising an adapter mountable on the wellhead to selectively support the tubing hanger assembly when not engaged with the wellhead.

9. The assembly of claim 8 , wherein:

the adapter comprising a load pin moveable between an extended position for supporting the tubing hanger assembly and a withdrawn position; and

a tubing hanger running tool configured to run the tubing hanger assembly into the wellhead and land on the load pin in the extended position to support the tubing hanger assembly.

10. The assembly of claim 9 , wherein:

the adapter comprises a first hydraulic port;

the tubing hanger running tool comprises a second hydraulic port, the first and second hydraulic ports being alignable with each other for hydraulic fluid to be communicated through the first and second hydraulic ports to actuate the expansion of the load segment into engagement with the bore of the wellhead.

11. The assembly of claim 1 , further comprising an overshot tool engageable with the tubing hanger assembly to expand the lock ring into engagement with the second groove.

12. The assembly of claim 11 , wherein:

the adapter comprising a load pin moveable between an extended position for supporting the tubing hanger assembly and a withdrawn position; and

a tubing hanger running tool configured to run the tubing hanger assembly into the wellhead and land on the load pin in the extended position to support the tubing hanger assembly.

13. The assembly of claim 12 , wherein:

the adapter comprises a first hydraulic port;

the tubing hanger running tool comprises a second hydraulic port, the first and second hydraulic ports being alignable with each other for hydraulic fluid to be communicated through the first and second hydraulic ports to actuate the expansion of the load segment into engagement with the bore of the wellhead.

14. A production assembly for controlling production from a well, the assembly comprising:

a wellhead including a bore formed through the wellhead with a first groove and a second groove formed within the bore, and the second groove is axially spaced apart from the first groove;

a tubing hanger assembly installable in the wellhead and comprising:

a load segment expandable into engagement with the first groove; and

a lock ring expandable into engagement with the second groove to secure the tubing hanger assembly within the wellhead; and

an adapter mountable on the wellhead to selectively support the tubing hanger assembly within the wellhead.

15. The assembly of claim 14 , wherein the load segment is configured to expand into engagement with the first groove before the lock ring expands into engagement with the second groove.

16. The assembly of claim 14 , wherein the load segment is expandable into engagement with the first groove independently of the lock ring expandable into engagement with the second groove.

17. The assembly of claim 14 , wherein the tubing hanger assembly further comprises a first wedge and a second wedge, the first wedge being configured to be actuated by hydraulic fluid pressure to be moved within the bore of the wellhead to expand the load segment into engagement with the first groove, and the second wedge being configured to be actuated by mechanical force to move within the bore of the wellhead to expand the lock ring into engagement with the second groove.

18. The assembly of claim 14 , further comprising an overshot tool engageable with the tubing hanger assembly to expand the lock ring into engagement with the second groove.

19. The assembly of claim 14 , wherein the wellhead does not include a support shoulder extending into the interior of the bore.

20. The assembly of claim 14 , wherein the tubing hanger assembly further comprises:

a load shoulder;

a tubing hanger supportable by the load shoulder; and

wherein the load segment is movably connected to the load shoulder.

21. The assembly of claim 20 , wherein the tubing hanger is positionable by a tubing hanger running tool onto the load shoulder to transfer support of the tubing hanger to the load shoulder.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 20, 2015
From: NGUYEN, DENNIS P.
To: CAMERON INTERNATIONAL CORPORATION
Reel/Frame 034994/0737 →
Continuity (3)
Continuation 13124688
Provisional Application 61138773 · Dec 18, 2008
Related Publication 20140345849A1 · Nov 27, 2014