IP Library Granted Patent US 10,145,902
Granted Patent B2
US 10,145,902 · App. 15/519,882 · Granted Dec 4, 2018

Storage battery capacity measurement device

Inventors: Masato Hanada (Tokyo, JP); Daisuke Tsurumaru (Tokyo, JP)
Assignee: TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION
G01R31/3679G01R31/3658H01M10/4285H01M10/482H02J3/32H02J7/0054H02J7/35
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,145,902
App. No.
15/519,882
Granted
Dec 4, 2018
Kind
B2
Abstract

A storage battery capacity measurement device is provided in in-plant equipment including a storage battery system connected to an intra-equipment electric wire. The storage battery system includes plural storage batteries connected in parallel to the intra-equipment electric wire. The storage battery capacity measurement device is configured to execute a determining one storage battery among the plural storage batteries as a measurement target storage battery, and at least one storage battery other than the measurement target storage battery as a measurement support storage battery, discharging an electricity amount of the measurement target storage battery from an upper limit to a lower limit, and charging the discharged electricity amount to the measurement support storage battery, and calculating a discharge capacity of the measurement target storage battery, based on an integrated value of a current flowing through the measurement target storage battery during discharge.

Claims (17)

1. A storage battery capacity measurement device provided in in-plant equipment including a storage battery system connected to an intra-equipment electric wire,

wherein the intra-equipment electric wire is connected to a power system,

wherein the storage battery system includes a plurality of storage batteries connected in parallel to the intra-equipment electric wire,

wherein the in-plant equipment includes a switch capable of switching an electrical connection of the power system and the intra-equipment electric wire to either one of a connected state or a disconnected state, and

wherein each of the plurality of storage batteries is connected to an individual power conditioning system,

the storage battery capacity measurement device comprising:

a processor to execute a program; and

a memory to store the program which, when executed by the processor, results in performance of steps comprising,

a) determining one storage battery among the plurality of storage batteries as a measurement target storage battery, and at least one storage battery other than the measurement target storage battery as a measurement support storage battery,

b) switching to the disconnected state,

c) operating the power conditioning system connected to the measurement support storage battery in an autonomous operation mode, in the disconnected state,

d) discharging an electricity amount of the measurement target storage battery from an upper limit to a lower limit, and charging the discharged electricity amount to the measurement support storage battery, and

e) calculating a discharge capacity of the measurement target storage battery, on a basis of an integrated value of a current flowing through the measurement target storage battery during discharge, and

wherein the autonomous operation mode is a mode of automatically charging and discharging the measurement support storage battery so as to balance electric power supply/demand of the intra-equipment electric wire.

2. The storage battery capacity measurement device according to claim 1 ,

wherein the steps further comprise:

charging the electricity amount of the measurement target storage battery to the upper limit by discharging the measurement support storage battery prior to the discharging step d).

Assignments (2)
CHANGE OF NAME Recorded Apr 26, 2024
From: TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION
To: TMEIC CORPORATION
Reel/Frame 067244/0359 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 18, 2017
From: HANADA, MASATO; TSURUMARU, DAISUKE
To: TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION
Reel/Frame 042040/0788 →
Continuity (1)
Related Publication 20170315182A1 · Nov 2, 2017