IP Library Granted Patent US 10,215,216
Granted Patent B2
US 10,215,216 · App. 15/013,082 · Granted Feb 26, 2019

Method of installing a spark containment cap

Inventors: Richard Dobbin (Bristol, GB); Ben Humphrys (Chester, GB)
Assignee: AIRBUS OPERATIONS LIMITED
F16B37/14B64D45/02F16B33/004Y10T29/49948
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,215,216
App. No.
15/013,082
Granted
Feb 26, 2019
Kind
B2
Abstract

A method of forming a sealed cavity around an end of a fastener protruding from a structure is disclosed having the steps of: (i) installing a cap having a cap body terminating at a rim which surrounds an opening of a cavity over the end of the fastener so that the end of the fastener is enclosed within the cavity; (ii) heating the cap to increase a temperature within the cavity; (iii) providing a bead of uncured sealing material around the rim of the cap body to seal a volume of gas within the cavity; and (iv) curing the bead of sealing material during a cure period.

Claims (13)

1. A method of forming a sealed cavity around an end of a fastener protruding from a structure, the method comprising: (i) installing a cap having a cap body terminating at a rim which surrounds an opening of a cavity over the end of the fastener so that the end of the fastener is enclosed within the cavity; (ii) heating the cap to increase a temperature within the cavity; (iii) providing a bead of uncured sealing material around the rim of the cap body to seal a volume of gas within the cavity; and (iv) curing the bead of sealing material during a cure period, wherein step (ii) is carried out before step (iii), and step (iii) is carried out when the temperature within the cavity is equal to or higher than an ambient temperature, whereby the cap is bonded to the structure.

2. The method according to claim 1 , wherein the cap comprises an annular skirt extending radially outwardly from the cap body, and a sealing material inlet in fluid communication with the annular sealing volume, and step (iii) includes injecting the uncured sealing material into an annular sealing volume via the sealing material inlet to provide the bead of uncured sealing material.

3. The method according to claim 2 , wherein step (ii) includes providing a flow of heated air into the annular sealing volume via the sealing material inlet.

4. The method according to claim 2 , wherein the cap comprises an inner cap member and an outer cap member, the sealing material inlet is provided in the outer cap member, one or more channels between the inner and outer cap members provide fluid communication between the sealing material inlet and the annular sealing volume, and step (ii) includes providing a flow of heated air into the one or more channels via the sealing material inlet.

5. The method according to claim 1 , wherein step (iii) includes installing or applying the bead of uncured sealing material around the rim of the cap body, and wherein step (ii) is carried out before the bead of uncured sealing material has been installed or applied around the rim of the cap body in step (iii).

6. The method according to claim 5 , wherein the bead of uncured sealing material is installed or applied around the rim of the cap body by injection.

7. The method according to claim 1 , wherein step (ii) is carried out by placing a heated pad in contact with the cap body.

8. The method according to claim 7 , wherein step (i) includes providing a plurality of caps, each cap having a cap body terminating at a rim which surrounds an opening of a cavity for receiving the end of the fastener, step (iii) includes providing a bead of uncured sealing material around the rim of each cap body to seal the respective cavity, and in step (ii) the heated pad is placed in contact with each of the plurality of caps substantially simultaneously before steps (iii) and (iv) are carried out.

9. The method according to claim 1 , wherein the ambient temperature comprises a maximum ambient temperature during the cure period.

10. The method according to claim 1 , wherein step (ii) is carried out by directing a flow of heated air at the cap body.

11. The method according to claim 1 , wherein in step (iv) the cure period comprises a period of time during which the bead of sealing material at least partially cures.

12. The method according to claim 1 , wherein the cap is installed over the end of the fastener before step (ii) is carried out.

13. The method according to claim 1 , wherein step (ii) is carried out before the cap is installed over the end of the fastener.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 2, 2016
From: DOBBIN, RICHARD; HUMPHRYS, BEN
To: AIRBUS OPERATIONS LIMITED
Reel/Frame 037642/0984 →
Priority Claims (1)
GB 1502133.0 · Feb 9, 2015 · national
Continuity (1)
Related Publication 20160230801A1 · Aug 11, 2016
Cited By (1)
US 12,270,426