IP Library Granted Patent US 10,337,357
Granted Patent B2
US 10,337,357 · App. 15/420,776 · Granted Jul 2, 2019

Steam turbine preheating system with a steam generator

Inventors: George Vargese Mathai (Atlanta, GA); Joseph Philip Klosinski (Kennesaw, GA); Sanji Ekanayake (Mableton, GA); Alston Ilford Scipio (Mableton, GA); William Theadore Fisher (Atlanta, GA)
Assignee: General Electric Company
F01K13/025F01D25/10F01K13/003F01K17/025F01K23/10F02C6/06F02C6/18F05D2220/72Y02E20/14Y02E20/16
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,337,357
App. No.
15/420,776
Granted
Jul 2, 2019
Kind
B2
Abstract

The present application provides a power generation system. The power generation system may include a gas turbine engine, a steam turbine, and a steam turbine preheating system. The steam turbine preheating system may include a steam generator that creates a flow of steam to preheat the steam turbine from an extraction of the gas turbine engine.

Claims (33)

1. A power generation system, comprising:

a gas turbine engine;

a steam turbine; and

a steam turbine preheating system;

wherein the steam turbine preheating system comprises a steam generator that creates a flow of steam to preheat the steam turbine from an extraction of the gas turbine engine.

2. The power generation system of claim 1 , wherein the gas turbine engine comprises a turbine casing and wherein the extraction extends from the turbine casing to the steam generator.

3. The power generation system of claim 1 , wherein the extraction comprises an extraction of hot combustion gases.

4. The power generation system of claim 1 , wherein the steam generator comprises a source of feedwater in communication therewith.

5. The power generation system of claim 1 , wherein the steam turbine comprises a steam turbine shell and wherein the flow of steam extends from the steam generator to the steam turbine shell.

6. The power generation system of claim 1 , further comprising a controller in communication with a plurality of sensors.

7. The power generation system of claim 1 , further comprising a heat recovery steam generator.

8. The power generation system of claim 1 , wherein the steam turbine preheating system comprises an attemperation system.

9. The power generation system of claim 8 , wherein the attemperation system comprises a spray system for at least one of a water injection and a steam injection.

10. The power generation system of claim 1 , wherein the steam turbine preheating system comprises an ejector in communication with the steam generator.

11. The power generation system of claim 10 , wherein the ejector is in communication with at least one of an ambient air flow, a filtered air flow, and a compressor air extraction.

12. The power generation system of claim 1 , wherein the steam turbine preheating system comprises a cascading ejector system in communication with the steam generator.

13. The power generation system of claim 12 , wherein the cascading ejector system comprises a first ejector in communication with a compressor of the gas turbine engine and a second ejector in communication with a turbine of the gas turbine engine.

14. The power generation system of claim 1 , wherein the steam turbine preheating system comprises a further extraction from downstream of the gas turbine engine to the steam generator.

15. A method of preheating a steam turbine in a power generation system, comprising:

extracting hot combustion gases from a gas turbine to a steam generator;

flowing feedwater to the steam generator;

exchanging heat between the hot combustion gases and the flow of feedwater to create a flow of steam in the steam generator; and

flowing the steam to the steam turbine to warm a shell of the steam turbine.

16. A combined cycle power generation system, comprising:

a gas turbine engine;

a steam turbine;

a heat recovery steam generator; and

a steam turbine preheating system;

wherein the steam turbine preheating system comprises a steam generator that creates a flow of steam to preheat the steam turbine from an extraction of the gas turbine engine and a flow of feedwater.

17. The combined cycle power generation system of claim 16 , wherein the gas turbine engine comprises a turbine casing and wherein the extraction extends from the turbine casing to the steam generator.

18. The combined cycle power generation system of claim 16 , wherein the extraction comprises an extraction of hot combustion gases.

19. The combined cycle power generation system of claim 16 , wherein the steam turbine comprises a steam turbine shell and wherein the flow of steam extends from the steam generator to the steam turbine shell.

20. The combined cycle power generation system of claim 16 , wherein the steam turbine preheating system comprises a spray system for at least one of a water injection and a steam injection.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2023
From: GENERAL ELECTRIC COMPANY
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 065727/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 9, 2017
From: MATHAI, GEORGE VARGESE; KLOSINSKI, JOSEPH PHILIP; EKANAYAKE, SANJI; SCIPIO, ALSTON ILFORD; FISHER, WILLIAM THEADORE
To: GENERAL ELECTRIC COMPANY
Reel/Frame 041530/0496 →
Continuity (1)
Related Publication 20180216499A1 · Aug 2, 2018
Cited By (1)
US 12,448,917