IP Library Granted Patent US 10,738,552
Granted Patent B1
US 10,738,552 · App. 15/896,042 · Granted Aug 11, 2020

Modular managed pressure drilling choke system

Inventors: Martyn Parker (Fort Smith, AR); Benjamin Micah Spahn (Alma, AR)
Assignee: PRUITT TOOL & SUPPLY CO.
E21B21/106F16K31/02G05D7/0664
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,738,552
App. No.
15/896,042
Granted
Aug 11, 2020
Kind
B1
Abstract

The modular managed pressured drilling system provides multiple skids with individual chokes and PRVs on the skids. These skids secure to one another to construct a modular MPD system that provides the proper equipment for the drilling operation. An inlet flow block and an outlet flow block are secured to each skid. The flow blocks provide multiple apertures to provide different pathways for the drilling fluid through the flow blocks. The flow blocks may direct the fluid through a first choke, a second choke, a pressure relief valve, or a bypass.

Claims (55)

1. A modular managed pressure drilling system for a well, the system comprising:

a first skid;

a first choke secured to the first skid;

a first inlet flow block connected to the first choke wherein the first inlet flow block directs fluid into the first choke from the well, wherein the first inlet flow block provides at least three openings from which the fluid flows through the first inlet flow block into the first choke;

a first outlet flow block connected to an outlet of the first choke wherein the fluid exits the first choke through the first outlet flow block, wherein the first outlet flow block provides at least three openings from which the fluid may flow through the first outlet flow block;

a second skid;

a first component secured to the second skid wherein the fluid flows from the first choke to the first component.

2. The system of claim 1 , wherein

the first outlet flow block connects to the outlet of the first choke wherein the first outlet flow block directs the fluid from the first choke to the first component;

a flange of the first outlet flow block wherein the flange accepts a blank flange to close at least one of the openings of the first outlet flow block.

3. The system of claim 1 further comprising:

a bypass allowing the fluid to bypass the first choke and the first component.

4. The system of claim 3 wherein the bypass is a 4 1/16 inch full bore bypass.

5. The system of claim 1 wherein the first component is a second choke.

6. The system of claim 5 wherein the first choke and the second choke are three inch electrically actuated linear drilling chokes.

7. The system of claim 1 wherein the first component is a pressure relief valve.

8. The system of claim 7 further comprising:

a human machine interface/programmable logic controller (HMI/PLC) connected to the managed pressure drilling system.

9. The system of claim 8 wherein the HMI/PLC controls the pressure relief valve.

10. The system of claim 1 wherein the first skid attaches to the second skid at a base of each skid.

11. The system of claim 1 wherein the first choke is an electrically actuated linear drilling choke.

12. The system of claim 1 wherein the first skid attaches to the second skid at a base of each skid.

13. A modular managed pressure drilling system for a well, the system comprising:

a first skid;

a first choke secured to the first skid;

a first inlet flow block connected to an inlet of the first choke wherein the first inlet flow block directs fluid into the first choke from the well, wherein the first inlet flow block provides at least three openings from which the fluid may flow through the first inlet flow block into the inlet of the first choke;

a first outlet flow block connected to an outlet of the first choke wherein the fluid exits the first choke through the first outlet flow block, wherein the first outlet flow block provides at least three openings from which the fluid may flow through the first outlet flow block;

a second skid attachable to the first skid;

a second choke secured to the second skid wherein the fluid flows from the first choke through the first outlet flow block to the second choke.

14. The system of claim 13 , wherein

the first outlet flow block connects to the outlet of the first choke wherein the first outlet flow block directs the fluid from the first choke to the second choke;

a flange of the first outlet flow block wherein the flange accepts a blank flange to close at least one of the openings of the first outlet flow block.

15. The system of claim 13 further comprising:

a bypass connected to the first inlet flow block, the bypass directing the fluid to bypass the first choke and the second choke;

the first inlet flow block directing the fluid to flow in a first direction and a second direction, wherein the first direction directs the fluid through the bypass to bypass the first choke and the second direction directs the fluid through the first choke.

16. The system of claim 13 further comprising:

a third skid attachable to the first and second skid;

a pressure relief valve attached to the third skid.

17. The system of claim 13 wherein the first choke and the second choke are three inch electrically actuated linear drilling chokes.

18. A modular managed pressure drilling system for a well, the system comprising:

a first skid;

a first choke secured to the first skid;

a first inlet flow block connected to an inlet of the first choke wherein the first inlet flow block directs fluid into the inlet of the first choke from the well, wherein the first inlet flow block provides at least three openings from which the fluid may flow through the first inlet flow block into the inlet of the first choke;

a first outlet flow block connected to the an outlet of the first choke wherein the fluid exits the first choke through the first outlet flow block, wherein the first outlet flow block provides at least three openings from which the fluid may flow through the first outlet flow block;

a second skid attachable to the first skid;

a first component secured to the second skid wherein the fluid flows from the first choke to the first component;

the first outlet flow block connected to the outlet of the first choke wherein the outlet flow block directs the fluid from the first choke through the first outlet flow block to the first component;

a flange of the outlet flow block wherein the flange accepts a blank flange to close at least one of the openings of the outlet flow block;

a bypass connected to the first inlet flow block directing the fluid to bypass the first choke and the first component;

wherein the first inlet flow block directs the fluid in a first direction to flow through the bypass to bypass the first choke and a second direction through the first choke.

19. The system of claim 18 further comprising:

a third skid attachable to the first and second skid;

a second component attached to the third skid; and

the bypass directing the fluid to bypass the first choke, the first component, and the second component.

20. The system of claim 19 wherein first component is a second choke and the second component is a pressure relief valve.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 23, 2020
From: PARKER, MARTYN; SPAHN, BENJAMIN MICAH
To: PRUITT TOOL & SUPPLY CO.
Reel/Frame 053010/0225 →
Continuity (2)
Provisional Application 62469258 · Mar 9, 2017
Provisional Application 62458451 · Feb 13, 2017
Cited By (5)
US 12,188,801 US 12,222,268 US 12,352,119 US 12,546,184 US 12,669,023