IP Library Granted Patent US 10,815,752
Granted Patent B2
US 10,815,752 · App. 15/563,670 · Granted Oct 27, 2020

Automated pump control of a cementing unit of wellsite equipment

Inventor: Carlos Urdaneta (Houston, TX)
Assignee: Schlumberger Technology Corporation
E21B33/14B01F15/00136E21B33/13E21B47/005G05B19/02G05B19/409
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,815,752
App. No.
15/563,670
Granted
Oct 27, 2020
Kind
B2
Abstract

Systems and methods for controlling wellsite equipment, including a cementing unit comprising a plurality of sensors operable to generate information related to operational status of the cementing unit and a controller comprising a processor and a memory including computer program code. Communication is established between the cementing unit and the controller. The controller is operable to operate the controller to automatically perform initialization of operation of the cementing unit, operate the controller to automatically perform a flow rate calibration of the cementing unit, and/or operate the controller to automatically perform a cement pumping operation of the cementing unit.

Claims (25)

1. A method comprising:

establishing communication between a cementing unit and a controller operable to control operation of the cementing unit, wherein the controller comprises a processor and a memory including computer program code; and

operating the controller to automatically perform a flow rate calibration of the cementing unit, wherein the flow rate calibration comprises automatically:

varying pumping speed of the cementing unit while recording the pumping speed and a corresponding flow rate generated by the cementing unit, wherein varying the pumping speed of the cementing unit comprises increasing the pumping speed of the cementing unit based on a first incremental percentage set-point until a volume of cement pumped by the cementing unit is substantially equal to a fluid volume set-point, and decreasing the pumping speed of the cementing unit based on a second incremental percentage set-point until the cementing unit stops pumping the cement; and

determining a flow rate ramp relating the recorded flow rates to the corresponding recorded pumping speeds.

2. The method of claim 1 further comprising inputting the fluid volume set-point, and wherein varying the pumping speed comprises:

increasing the pumping speed of the cementing unit while recording the pumping speed and the corresponding flow rate generated by the cementing unit until the fluid volume set-point is met; and

decreasing the pumping speed of the cementing unit while recording the pumping speed and the corresponding flow rate generated by the cementing unit until the cementing unit stops pumping the cement.

3. The method of claim 2 further comprising inputting first and second incremental speed set-points, wherein the pumping speed is increased by the first incremental speed set-point until the fluid volume set-point is met, and wherein the pumping speed is decreased by the second incremental speed set-point until the cementing unit stops pumping the cement.

4. The method of claim 3 wherein:

the recorded flow rates and corresponding recorded pumping speeds are first recorded flow rates and first recorded pumping speeds;

the flow rate ramp is a first flow rate ramp;

the method further comprises inputting the first incremental percentage set-point, the second incremental percentage set-point, a fluid flow rate set-point, and the fluid volume set-point; and

varying the pumping speed further comprises, after estimating the first flow rate ramp:

increasing the pumping speed of the cementing unit by a speed corresponding to the first incremental percentage set-point of the fluid flow rate set-point based on the first flow rate ramp while recording second pumping speeds and corresponding second flow rates generated by the cementing unit until the fluid volume set-point is met;

decreasing the pumping speed of the cementing unit by a speed corresponding to the second incremental percentage set-point of the fluid flow rate set-point based on the first flow rate ramp while recording third pumping speeds and corresponding third flow rates generated by the cementing unit until the cementing unit stops pumping the cement; and

determining a second flow rate ramp relating the second and third recorded flow rates to the corresponding second and third recorded pumping speeds.

5. The method of claim 1 wherein the flow rate calibration further comprises, before varying the pumping speed:

confirming that the cementing unit is not pumping;

confirming that the cementing unit is depressurized;

confirming that a sufficient volume of fluid is available for performing the flow rate calibration; and

either:

opening fluid inlet and outlet valves of the cementing unit; or

confirming that the fluid inlet and outlet valves of the cementing unit are open.

6. The method of claim 1 further comprising operating the controller to automatically confirm that safety parameters are within corresponding predetermined ranges during the flow rate calibration.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 9, 2017
From: URDANETA, CARLOS
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 044078/0052 →
Continuity (2)
Provisional Application 62139963 · Mar 30, 2015
Related Publication 20180073346A1 · Mar 15, 2018