IP Library Granted Patent US 10,968,643
Granted Patent B2
US 10,968,643 · App. 16/628,669 · Granted Apr 6, 2021

Transportation systems, elevator systems, kits, tower sections and methods for performing assembly or maintenance operations in towers

Inventor: Carlos Legua Gracia (La Muela, ES)
Assignee: ALIMAK GROUP MANAGEMENT AB
E04G3/246B66B9/00E04G3/28E04G5/14F03D13/10F03D80/50E04G2003/283
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,968,643
App. No.
16/628,669
Granted
Apr 6, 2021
Kind
B2
Abstract

Provided are examples of transportation systems, elevator systems, and kits for use in towers, as well as tower sections and methods for performing assembly or maintenance operations in towers, particularly wind turbine towers, guides mounted in tower sections for transporting an operator or robot along an inside of a tower and an elevator carrying parts of such guides.

Claims (29)

1. A transportation system for performing assembly or maintenance operations in a tower structure, the transportation system comprising:

(a) a fixed guide which: (1) is attached to a tower structure for guiding a transportation unit, (2) wherein the fixed guide is configured to be connected to a movable guide, which movable guide is configured to be mounted in an elevator car of an elevator system and (3) extends from a first end to a second end less than 360° along an internal circular perimeter of a tower structure; and

(b) a transportation unit comprising a undercarriage for displacing the transportation unit along the fixed guide.

2. The transportation system according to claim 1 , wherein the transportation unit comprises a robot.

3. The transportation system according to claim 1 , wherein the transportation unit is a trolley configured to host an operator in the tower structure.

4. The transportation system according to claim 1 , wherein the transportation unit comprises a structure having a platform for supporting an operator and a guard rail system.

5. The transportation system according to claim 1 , wherein the undercarriage of the transportation unit is rotatably connected to a structure for horizontally rotating the structure with respect to the undercarriage.

6. The transportation system according to claim 1 , wherein the transportation unit further comprises a driving system for driving the undercarriage.

7. The transportation system according to claim 1 , wherein the fixed guide comprises an outer rail and an inner rail.

8. The transportation system according to claim 1 , wherein the undercarriage comprises a wheel assembly having at least one main wheel for rolling along the fixed guide.

9. The transportation system according to claim 7 , wherein the outer rail and inner rail are substantially parallel.

10. A kit for performing assembly or maintenance operations in a tower structure, comprising:

(a) the transportation system according to claim 1 ;

(b) an elevator system comprising an elevator car, the elevator car comprising:

(1) a movable guide support structure;

(2) a movable guide (i) which extends from a first end to a second end; (ii) wherein said movable guide is connected to the support structure; and (iii) is configured to (iii)(a) be connected to a fixed guide attached to a tower structure and (iii)(b) guide the transportation unit of the transportation system.

11. The kit according to claim 10 , wherein the kit comprises a first connecting guide for detachably connecting the movable guide of the elevator car and the fixed guide of the transportation system.

12. The kit according to claim 11 , wherein the first connecting guide is configured to connect the first end of the fixed guide to the first end of the movable guide.

13. The kit according to claim 12 , wherein the kit further comprises a second connecting guide configured to detachably connect the second end of the fixed guide to the second end of the movable guide.

14. A method for performing assembly or maintenance operations in a tower structure, comprising:

(a) providing a kit according to claim 10 ;

(b) placing the transportation unit on the movable guide of the elevator car;

(c) aligning the movable guide of the elevator car and the fixed guide;

(d) connecting the movable guide of the elevator car and the fixed guide; and

(e) horizontally displacing the transportation unit along the movable guide and/or fixed guide to a desired position.

15. The method according to claim 14 , wherein the tower structure is a wind turbine tower.

16. The kit according to claim 10 , wherein the movable guide support structure of the elevator car and the movable guide are configured to support a transportation unit.

17. The kit according to claim 10 , wherein the tower structure is a wind turbine tower.

18. The transportation system according to claim 1 , wherein the tower structure is a wind turbine tower.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2020
From: LEGUA GRACIA, CARLOS
To: LIMAK GROUP MANAGEMENT AB
Reel/Frame 053439/0031 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2020
From: LEGUA GRACIA, CARLOS
To: ALIMAK GROUP MANAGEMENT AB
Reel/Frame 053439/0037 →
Priority Claims (1)
EP 17382435 · Jul 5, 2017 · regional
Continuity (1)
Related Publication 20200131786A1 · Apr 30, 2020