IP Library Granted Patent US 11,009,539
Granted Patent B2
US 11,009,539 · App. 16/270,281 · Granted May 18, 2021

Device and method for insulation monitoring including identification of a faulty outer conductor in a three-phase ungrounded power supply system

Inventors: Manfred Geiss (Ulrichstein, DE); Carsten Weiss (Laubach, DE)
Assignee: BENDER GMBH & CO. KG
G01R31/1272G01R27/025G01R31/52G01R31/40G01R31/58
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,009,539
App. No.
16/270,281
Granted
May 18, 2021
Kind
B2
Abstract

The invention relates to a device and a method for insulation monitoring including identification of a faulty outer conductor in a three-phase ungrounded power supply system. The fundamental idea of the present invention rests upon determining the phase angle between the measured mains voltage and the measured neutral-point voltage when presuming only one measurement of the mains voltage to ground at one of the outer conductors and one measurement of the neutral-point voltage to ground. The value of the thus determined phase angle is in one of three angle ranges which each extend over 120 degrees and are to be assigned to one of the three outer conductors so that the faulty outer conductor is determined. The faulty outer conductor is thus detected by measuring only one mains voltage in conjunction with the measurement of the neutral-point voltage by evaluating the phase between the two measured voltage.

Claims (15)

1. A device for insulation monitoring ( 2 ) including identification of a faulty outer conductor (L 1 , L 2 , L 3 ) in a three-phase ungrounded power supply system ( 4 ), comprising a first coupling circuit ( 10 ) for connecting one of the outer conductors (L 1 , L 2 , L 3 ), comprising a pulse generator ( 12 ) for generating a measuring current, comprising a first measuring device ( 14 ) for measuring a measuring-voltage drop (Um) effected by the measuring current, and comprising an evaluation device ( 15 ) for determining an insulation resistance (Rf) of the three-phase ungrounded power supply system ( 4 ), characterized in that the first measuring device ( 14 ) is configured for measuring a mains voltage (U) between the connected outer conductor (L 1 , L 2 , L 3 ) and ground (PE) and characterized by a second coupling circuit ( 16 ) for connecting a neutral point (N) and by a second measuring device ( 18 ) for measuring a neutral-point voltage (Us) between the neutral point (N) and ground (PE) and characterized in that the evaluation device ( 15 ) is configured for evaluating a phase between the mains voltage (U) and the neutral-point voltage (Us) for detecting a faulty outer conductor (L 1 , L 2 , L 3 ).

2. The device according to claim 1 , characterized in that the evaluation device ( 15 ) comprises a decider ( 22 ) for assigning the determined phase to an outer conductor (L 1 , L 2 , L 3 ).

3. The device according to claim 1 , characterized by a control output ( 24 ) for controlling a disconnect device for at least one outer conductor (L 1 , L 2 , L 3 ).

4. A method for insulation monitoring including identification of a faulty outer conductor (L 1 , L 2 , L 3 ) in a three-phase ungrounded power supply system ( 4 ), having the method steps:

connecting an outer conductor (L 1 , L 2 , L 3 ) to a first coupling circuit ( 10 ),

generating a measuring current by means of a pulse generator ( 12 ),

measuring a measuring voltage, which is effected by the measuring current, by means of a first measuring device ( 14 ),

determining an insulation resistance of the three-phase ungrounded power supply system ( 4 ) by means of an evaluation device ( 15 ),

characterized by:

measuring a mains voltage (U) between the connected outer conductor (L 1 , L 2 , L 3 ) and ground (PE) by means of the first measuring device ( 14 ),

connecting a neutral point (N) to a second coupling circuit ( 16 ),

measuring a neutral-point voltage (Us) between the neutral point (N) and ground (PE) by means of a second measuring device ( 18 ), and

evaluating a phase between the mains voltage (U) and the neutral point voltage (Us) by means of the evaluation device ( 15 ).

5. The method according to claim 4 , characterized in that the phase between the mains voltage (U) and the neutral-point voltage (Us) is evaluated by measuring a period duration of the mains voltage (U), by determining a phase shift time between the mains voltage (U) and the neutral-point voltage (Us) and by converting the phase shift time to the phase including assigning the faulty outer conductor (L 1 , L 2 , L 3 ).

6. The method according to claim 4 , characterized in that a control signal for disconnecting the faulty outer conductor (L 1 , L 2 , L 3 ) is generated.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 26, 2019
From: GEISS, MANFRED; WEISS, CARSTEN
To: BENDER GMBH & CO. KG
Reel/Frame 048700/0388 →
Priority Claims (1)
DE 10 2018 102 959.4 · Feb 9, 2018 · national
Continuity (1)
Related Publication 20190250204A1 · Aug 15, 2019
Cited By (2)
US 12,372,570 US 12,399,208