IP Library Granted Patent US 11,021,640
Granted Patent B2
US 11,021,640 · App. 15/772,883 · Granted Jun 1, 2021

Hydrophobically-treated particulates for improved fluid rheology

Inventors: William Walter Shumway (Spring, TX); Jessica Paola Ramirez Angulo (Kingwood, TX); Kay Ann Galindo (Mongomery, TX)
Assignee: Halliburton Energy Services, Inc.
C09K8/06C09K8/665C09K8/80C09K8/805E21B21/003E21B21/062E21B43/267
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,021,640
App. No.
15/772,883
Granted
Jun 1, 2021
Kind
B2
Abstract

Systems and methods for treating subterranean formations using particulates treated with hydrophobizing agents in aqueous base fluid are provided. In one embodiment, the methods comprise: providing a treatment fluid comprising an aqueous base fluid and at least one particulate treated with one or more hydrophobizing agents; introducing the into a wellbore penetrating at least a portion of a subterranean formation; and using the treatment fluid to drill a portion of the wellbore.

Claims (31)

1. A method comprising:

providing a treatment fluid comprising an aqueous base fluid;

adding to the treatment fluid at least one particulate (i) comprising calcium carbonate and (ii) treated with a hydrophobizing agent comprising one selected from the group consisting of stearic acid and lauric acid;

by adding the at least one particulate treated with the hydrophobizing agent to the treatment fluid,

increasing the viscosity of the treatment fluid at a shear rate of 100 rpm or less, and

decreasing the viscosity of the treatment fluid at a shear rate of 300 rpm or more;

introducing the treatment fluid into at least a portion of a wellbore penetrating at least a portion of a subterranean formation; and

using the treatment fluid to drill a portion of the wellbore.

2. The method of claim 1 , wherein the aqueous base fluid comprises a brine.

3. The method of claim 2 , wherein the brine comprises a divalent brine.

4. The method of claim 1 , wherein the treatment fluid is used to drill a portion of the wellbore that comprises a reservoir or pay zone.

5. The method of claim 1 , further comprising:

forming a filter cake that comprises the at least one particulate in at least the portion of the subterranean formation; and

at least partially degrading at least a portion of the filter cake using an acid or an acid generating component.

6. A method comprising:

providing a drilling fluid comprising an aqueous base fluid;

adding to the drilling fluid at least one particulate (i) comprising calcium carbonate and (ii) treated with a hydrophobizing agent comprising one selected from the group consisting of stearic acid and lauric acid;

by adding the at least one particulate treated with the hydrophobizing agent to the drilling fluid,

increasing the viscosity of the drilling fluid at a shear rate of 100 rpm or less, and

decreasing the viscosity of the drilling fluid at a shear rate of 300 rpm or more; and

introducing the drilling fluid into a wellbore penetrating at least a portion of a subterranean formation.

7. The method of claim 6 , wherein the aqueous base fluid comprises a brine.

8. A method comprising:

providing a treatment fluid comprising a divalent brine that comprises one or more divalent salts dissolved therein;

adding to the treatment fluid a plurality of calcium carbonate particulates that are at least partially coated with stearic acid;

introducing the treatment fluid into a well bore penetrating at least a portion of a subterranean formation;

by adding the plurality of calcium carbonate particulates that are at least partially coated with stearic acid to the treatment fluid,

increasing the viscosity of the treatment fluid at a shear rate of 100 rpm or less, and

decreasing the viscosity of the treatment fluid at a shear rate of 300 rpm or more; and

using the fluid to drill a portion of the wellbore.

9. The method of claim 8 , wherein the treatment fluid is used to drill a portion of the wellbore that comprises a reservoir or pay zone.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 2, 2018
From: SHUMWAY, WILLIAM WALTER; RAMIREZ ANGULO, JESSICA PAOLA; GALINDO, KAY ANN
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 045692/0155 →
Continuity (1)
Related Publication 20180320049A1 · Nov 8, 2018