IP Library Granted Patent US 11,041,378
Granted Patent B2
US 11,041,378 · App. 16/505,289 · Granted Jun 22, 2021

Method and apparatus for detection of pitting corrosion under iron sulfide deposition

Inventors: Tao Chen (Dhahran, SA); Qiwei Wang (Dhahran, SA); Fakuen Frank Chang (Dhahran, SA)
Assignee: Saudi Arabian Oil Company
E21B47/00E21B47/006E21B49/086G01N17/046E21B47/11
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,041,378
App. No.
16/505,289
Granted
Jun 22, 2021
Kind
B2
Abstract

A method for monitoring pitting corrosion of a production tubing in a hydrocarbon well under downhole conditions during a production process using a coupon segment, the method comprising the steps of placing the coupon segment in the hydrocarbon well at a placement depth, the coupon segment is exposed to produced fluids and comprises an outer layer, an inner layer, and a hollow middle layer comprises a tracer fluid operable to leak into the produced fluids when pitting corrosion penetrates the outer layer, operating the production process in the hydrocarbon well such that produced fluids flow through the production tubing to a surface of the hydrocarbon well and wherein the produced fluids contact the coupon segment such that pitting corrosion occurs on the coupon segment; obtaining a sample of the produced fluids at the surface of the hydrocarbon well; and measuring an amount of the tracer fluid in the sample.

Claims (34)

1. A method for monitoring pitting corrosion of a production tubing in a hydrocarbon well under downhole conditions during a production process using a coupon segment, the method comprising the steps of:

placing the coupon segment in the hydrocarbon well at a placement depth, wherein the coupon segment is exposed to produced fluids, wherein the coupon segment comprises:

an outer layer, wherein the outer layer comprises the same metallurgy as the production tubing, wherein the outer layer comprises a known thickness,

an inner layer, and

a hollow middle layer, wherein the hollow middle layer comprises a tracer fluid, wherein the tracer fluid is operable to leak from the hollow middle layer into the produced fluids when pitting corrosion penetrates the outer layer;

operating the production process in the hydrocarbon well such that produced fluids flow through the production tubing to a surface of the hydrocarbon well, and wherein the produced fluids contact the coupon segment such that pitting corrosion occurs on the coupon segment;

obtaining a sample of the produced fluids at the surface of the hydrocarbon well;

measuring an amount of the tracer fluid in the sample; and

placing one or more additional coupon segments in the hydrocarbon well, wherein each additional coupon segment contains a different tracer fluid, wherein each coupon segment has a different thickness of the outer layer.

2. The method of claim 1 , further including:

determining a pitting corrosion rate of the coupon segment; and

estimating pitting corrosion of the production tubing based on the pitting corrosion rate of the coupon segment.

3. The method of claim 1 , wherein the step of placing the coupon segment in the hydrocarbon well comprises the steps of:

placing the coupon segment on a coupon holder; attaching the coupon holder to an anchoring segment; and

positioning the anchoring segment attached to the coupon holder in the hydrocarbon well with a placement tool.

4. The method of claim 1 , wherein the hydrocarbon well is selected from the group consisting of a sour gas well, an oil well, and a high hydrogen sulfide content well.

5. The method of claim 1 , wherein the tracer fluid is selected from the group consisting of inorganic tracer fluids, organic tracer fluids, radioactive tracer fluids, and combinations of the same.

6. The method of claim 1 , wherein the hydrocarbon well is selected from the group consisting of a sour gas well and an oil well.

7. An apparatus for monitoring pitting corrosion of a production tubing in a hydrocarbon well under downhole conditions, the apparatus comprising:

a placement tool, the placement tool configured to retrievably set a downhole pitting corrosion monitoring (DPCM) tool at a placement depth in a hydrocarbon well; and

the DPCM tool, the DPCM configured to monitor pitting corrosion, the DPCM comprising:

an anchoring segment, the anchoring segment configured to anchor a coupon holder in the hydrocarbon well;

the coupon holder physically anchored by the anchoring segment, the coupon holder configured to hold one or more coupon segments, wherein the coupon holder comprises a cylindrical housing configured to hold the one or more coupon segments such that each coupon segment is exposed to a produced fluid stream within the production tubing; and

the coupon segment anchored by the coupon holder, the coupon segment operable to corrode upon exposure to the produced fluid, wherein each coupon segment comprises:

an outer layer, the outer layer comprising a known thickness, wherein the outer layer is exposed to the produced fluid;

an inner layer; and

a hollow middle layer, wherein the hollow middle layer is defined by the annulus formed by the outer layer and the inner layer, wherein the hollow middle layer comprises a tracer fluid,

wherein each coupon segment has a different known thickness of the outer layer and wherein each coupon segment contains a different tracer fluid in the hollow middle layer.

8. The apparatus of claim 7 , wherein the placement tool is selected from the group consisting of slickline and coiled tubing.

9. The apparatus of claim 7 , wherein the anchoring segment comprises a gauge hanger.

10. The apparatus of claim 7 , wherein the means to retrievably anchor the anchoring segment is configured to expand radially outward from the anchoring segment onto the hydrocarbon well.

11. The apparatus of claim 7 , wherein the known thickness of the outer layer is between 0.5 mm and 10 mm.

12. The apparatus of claim 7 , wherein the tracer fluid is selected from the group consisting of inorganic tracer fluids, organic tracer fluids, radioactive tracer fluids, and combinations of the same.

13. The apparatus of claim 7 , wherein the hydrocarbon well is selected from the group consisting of a sour gas well and an oil well.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 8, 2019
From: CHEN, TAO; WANG, QIWEI; CHANG, FAKUEN FRANK
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 049691/0797 →
Continuity (1)
Related Publication 20210010366A1 · Jan 14, 2021
Cited By (1)
US 12,516,599