IP Library Granted Patent US 11,073,155
Granted Patent B2
US 11,073,155 · App. 15/939,715 · Granted Jul 27, 2021

Pumping system with power optimization

Inventors: Robert W. Stiles, Jr. (Cary, NC); Lars Hoffmann Berthelsen (Kolding, DK); Ronald B. Robol (Savannah, GA); Christopher R. Yahnker (Raleigh, NC); Einar Kjartan Runarsson (Soenderborg, DK)
Assignees: Pentair Water Pool and Spa, Inc.; Danfoss Power Electronics A/S
F04D15/0066F04B49/06F04B49/065F04B49/20F04D1/00F04D13/06F04D27/004E04H4/1245
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,073,155
App. No.
15/939,715
Granted
Jul 27, 2021
Kind
B2
Abstract

A method of operating a pumping system for an aquatic application based upon performance of multiple water operations is disclosed. The method includes providing a pump and a motor coupled to the pump, and a controller including a variable speed drive that is in communication with the motor. The method also includes: operating the motor in accordance with a first water operation, wherein the first water operation includes a first start time, end time, and water flow rate; operating the motor in accordance with a second water operation, wherein the second water operation includes a second start time, end time, and water flow rate; and altering the first water operation in response to performance of the second water operation.

Claims (31)

1. A method of operating a pumping system for at least one aquatic application based upon performance of a plurality of water operations, the method comprising:

providing a pump and a motor coupled to the pump;

providing a controller including a variable speed drive that is in communication with the motor;

determining an operational time period, the operational time period including a first water operation and a second water operation;

dynamically monitoring a volume of water moved by the pump during the operational time period;

operating the motor in accordance with the first water operation, wherein the first water operation includes a first start time, a first end time, and a first water flow rate;

operating the motor in accordance with the second water operation, wherein the second water operation includes a second start time, a second end time, and a second water flow rate; and

altering the first water operation in response to performance of the second water operation in order to achieve a target volume of water to be moved by the pump during the operational time period.

2. The method of claim 1 , wherein one of the first end time or the first water flow rate of the first water operation is altered in response to performance of the second water operation.

3. The method of claim 2 , wherein the first end time is reduced.

4. The method of claim 1 further including the step of altering the operational time period based on the volume of water moved by the pump.

5. The method of claim 1 further including the step of adjusting the first end time based on the second flow rate.

6. A method of operating a pumping system having a water pump coupled to and driven by an electric variable-speed motor configured to receive operational commands from a controller having a variable-speed drive, comprising:

operating the water pump at a target flow rate to accomplish a target volume of water flow through the water pump in a target time period;

measuring a target power consumption of the electric variable-speed motor while operating the water pump at the target flow rate to accomplish the target volume of water flow through the water pump in the target time period;

operating the water pump at a water operation flow rate to accomplish a water operation;

measuring a water operation power consumption of the electric variable-speed motor while operating the water pump at the water operation flow rate to accomplish the water operation;

determining a cumulative volume of water movement through the water pump based on the target power consumption and the water operation power consumption;

adjusting at least one of the target flow rate to an adjusted flow rate and the target time period to an adjusted time period to account for the cumulative volume of water movement; and

operating the water pump to account for at least one of the adjusted flow rate and the adjusted time period.

7. The method of claim 6 wherein measuring the target power consumption of the electric variable-speed motor while operating the water pump at the target flow rate to accomplish the target volume of water flow through the water pump in the target time period comprises repeatedly monitoring the measured target power consumption.

8. The method of claim 6 wherein measuring the target power consumption of the electric variable-speed motor while operating the water pump at the target flow rate to accomplish the target volume of water flow through the water pump in the target time period comprises measuring an electrical current provided to the electric variable-speed motor.

9. The method of claim 6 wherein measuring the target power consumption of the electric variable-speed motor while operating the water pump at the target flow rate to accomplish the target volume of water flow through the water pump in the target time period comprises measuring an electrical voltage provided to the electric variable-speed motor.

10. The method of claim 6 wherein operating the water pump at the water operation flow rate to accomplish the water operation comprises operating to accomplish running a vacuum, a heater, or a filter for a water operation time period.

11. The method of claim 6 wherein operating the water pump at the target flow rate to accomplish the target volume of water flow through the water pump in the target time period comprises operating the water pump at a minimum speed that achieves the target volume of water flow through the water pump at the expiration of the target time period.

12. The method of claim 6 wherein adjusting the target time period to the adjusted time period comprises curtailing a duration of the target time period such that the adjusted time period is less than the target time period.

13. The method of claim 6 wherein adjusting the target time period to the adjusted time period comprises prolonging a duration of the target time period such that the adjusted time period is greater than the target time period.

14. The method of claim 6 wherein adjusting the target flow rate to the adjusted flow rate comprises increasing a volumetric rate of the target flow rate such that the adjusted flow rate is greater than the target flow rate.

15. The method of claim 6 wherein adjusting the target flow rate to the adjusted flow rate comprises decreasing a volumetric rate of the target flow rate such that the adjusted flow rate is less than the target flow rate.

16. The method of claim 6 wherein determining the cumulative volume of water movement through the water pump based on the target power consumption and the water operation power consumption comprises determining the cumulative volume of water movement in real time.

17. The method of claim 6 further comprising shutting off the motor when the cumulative volume of water movement equals the target volume of water flow through the water pump.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 10, 2019
From: STILES, ROBERT W.; BERTHELSEN, LARS HOFFMANN; ROBOL, RONALD B.; YAHNKER, CHRISTOPHER; COX, EVERETT; STEEN, DONALD; MURPHY, KEVIN; WOODCOCK, WALTER J., JR.; HRUBY, DANIEL J.; WESTERMANN-RASMUSSEN, PETER; KJAER, GERT; RUNARSSON, EINAR KJARTAN; HANSEN, ARNE FINK; MORANDO, ALBERTO; LUNGEANU, FLORIN; HARVEST, NILS-OLE
To: PENTAIR WATER POOL AND SPA, INC.; DANFOSS DRIVES A/S
Reel/Frame 051240/0490 →
CHANGE OF NAME Recorded Dec 10, 2019
From: DANFOSS DRIVES A/S
To: DANFOSS POWER ELECTRONICS A/S
Reel/Frame 051240/0555 →
Continuity (6)
Division 14465659 · Aug 21, 2014
Continuation 12749262 · Mar 29, 2010
Division 11609029 · Dec 11, 2006
Continuation In Part 10926513 · Aug 26, 2004
Continuation In Part 11286888 · Nov 23, 2005
Related Publication 20180216621A1 · Aug 2, 2018