IP Library Granted Patent US 11,075,520
Granted Patent B2
US 11,075,520 · App. 16/782,032 · Granted Jul 27, 2021

Microgrid electric power generation systems and associated methods

Inventors: John Røn Pedersen (Frederikssund, DK); Martin Speiermann (Brønshøj, DK)
Assignee: MAERSK DRILLING A/S
H02J3/30F02D19/06H02J3/381H02J3/46Y02E60/16
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,075,520
App. No.
16/782,032
Granted
Jul 27, 2021
Kind
B2
Abstract

A method for operating a microgrid electric power generation system includes delivering energy to an electric power bus at least partially from one or more kinetic generators electrically coupled to the electric power bus, controlling the one or more kinetic generators in response to a change in a load such that a magnitude of a voltage on the electric power bus remains within a predetermined voltage range, and controlling one or more combustion generators electrically coupled to the electric power bus based at least in part on an operating state of the one or more kinetic generators. The one or more kinetic generators are capable of (a) delivering energy stored therein to the electric power bus, and (b) storing energy in kinetic form.

Claims (21)

1. A method for operating a microgrid electric power generation system, comprising:

delivering energy to a first electric power bus at least partially from one or more kinetic generators electrically coupled to the first electric power bus, the one or more kinetic generators storing energy therein in kinetic form;

controlling the one or more kinetic generators in response to a change in a load powered by the first electric power bus such that a magnitude of a voltage on the first electric power bus remains within a predetermined voltage range, while maintaining an output power of one or more combustion generators electrically coupled to the first electric power bus at a constant value during the change in load; and

controlling the one or more combustion generators based at least in part on an operating state of the microgrid electric power generation system.

2. The method of claim 1 , further comprising controlling the one or more combustion generators independent of the voltage on the first electric power bus.

3. The method of claim 1 , wherein a magnitude of the change in load is at least ten percent of a magnitude of the load before the change in load.

4. The method of claim 3 , wherein a duration of the change in load is at least one second.

5. The method of claim 1 , wherein the one of more kinetic generators are electrically coupled to the first electric power bus via at least one of a power converter and a transformer.

6. The method of claim 5 , wherein the one of more kinetic generators are electrically coupled to the first electric power bus via a second electric power bus.

7. The method of claim 1 , further comprising maintaining the output power of the one or more combustion generators at eighty percent or more of a maximum rated output power of the one or more combustion generators during the change in load.

8. The method of claim 1 , further comprising controlling the one or more combustion generators in response to a signal indicating an upcoming change in the load.

9. The method of claim 1 , wherein controlling the one or more combustion generators based at least in part on the operating state of the microgrid electric power generation system comprises controlling the one or more combustion generators according to one or more of (a) kinetic energy storage level of the one or more kinetic generators and (b) kinetic energy loss rate of the one or more kinetic generators.

10. The method of claim 1 , further comprising:

controlling the one or more kinetic generators in response to the change in the load within 10 ms of the change in load; and

controlling the one or more combustion generators at least one second after the change in load.

11. The method of claim 10 , the step of controlling the one or more combustion generators comprising:

initiating change in operation of the one or more combustion generators; and

changing power output of the one or more combustion generators at least one second after the step of initiating.

12. The method of claim 1 , further comprising providing an output power of at least 1 MW from the one or more kinetic generators to the load for at least 5 minutes.

13. The method of claim 1 , further comprising spinning a rotor of each kinetic generator at a speed of at least 30,000 revolutions per minute.

14. The method of claim 1 , wherein the first electric power bus is an AC electric power bus and the method further comprises controlling the one or more kinetic generators such that frequency of the voltage on the first electric power bus remains within a predetermined frequency range.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 1, 2023
From: NOBLE DRILLING A/S
To: WATTSUP POWER A/S
Reel/Frame 065416/0867 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 30, 2023
From: PEDERSEN, JOHN RØN
To: MAERSK DRILLING A/S
Reel/Frame 062534/0210 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 30, 2023
From: SPEIERMANN, MARTIN
To: WATTSUP POWER A/S
Reel/Frame 062534/0411 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 30, 2023
From: WATTSUP POWER A/S
To: MAERSK DRILLING A/S
Reel/Frame 062534/0620 →
CHANGE OF NAME Recorded Nov 21, 2022
From: MAERSK DRILLING A/S
To: NOBLE DRILLING A/S
Reel/Frame 061976/0444 →
Priority Claims (1)
DK PA 2015 00789 · Dec 7, 2015 · national
Continuity (3)
Continuation 16060144
Continuation In Part PCTDK2016000006 · Feb 22, 2016
Related Publication 20200176987A1 · Jun 4, 2020
Cited By (1)
US 12,444,910