IP Library Granted Patent US 11,085,451
Granted Patent B2
US 11,085,451 · App. 16/380,364 · Granted Aug 10, 2021

High viscosity pumping system and method of using same

Inventors: Woon Yung Lee (Sugar Land, TX); Ying Xue (Shanghai, CN); Yun Cai (Shanghai, CN)
Assignee: ALKHORAYEF PETROLEUM COMPANY LIMITED
F04D13/086F04D1/08F04D7/04F04D13/10F04D29/0413F04D29/426F04D29/445
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,085,451
App. No.
16/380,364
Granted
Aug 10, 2021
Kind
B2
Abstract

An electrical submersible pump (ESP) for use in a high viscosity pumping system includes a pump shaft, at least one rotating impeller including an impeller hub and one or more impeller vanes projecting from the impeller hub. Each of the one or more impeller vanes includes an impeller vane edge, and at least one stationary diffuser positioned below the at least one rotating impeller. A diffuser includes a diffuser hub and a diffuser shroud including a diffuser shroud surface. The impeller vane edge and the diffuser shroud surface are separated only by a clearance gap.

Claims (29)

1. An electrical submersible pump (ESP) for use in a pumping system, the ESP comprising:

a pump shaft;

at least one rotating impeller comprising an impeller hub and one or more impeller vanes projecting from the impeller hub, each of the one or more impeller vanes comprising an impeller vane edge; and

at least one stationary diffuser positioned upstream the at least one rotating impeller, the diffuser comprising a diffuser hub and a diffuser shroud comprising a diffuser shroud surface,

wherein the impeller vane edge and the diffuser shroud surface are separated only by a clearance gap, and

wherein the clearance gap is calculated as a function of the impeller hub, a position of the diffuser shroud surface, an angle of the diffuser shroud, and a position of the impeller vane edge.

2. The ESP of claim 1 , wherein the clearance gap ranges from 0.005 inches to 0.03 inches.

3. The ESP of claim 1 , wherein the clearance gap is calculated as d=(h1−(d1+v1))×cos(a), wherein h1 is the impeller hub length, d1 is the position of the diffuser shroud surface, a is the angle of the diffuser shroud, and v1 is the position of the impeller vane edge.

4. The ESP of claim 1 , wherein the clearance gap is smaller than a boundary layer formed at the diffuser shroud surface.

5. The ESP of claim 1 , wherein the at least one stationary diffuser is shaped to provide a mixed axial and radial flow pumping system for reducing flow resistance of fluid.

6. The ESP of claim 1 , wherein the at least one rotating impeller and the at least one stationary diffuser together include at most three boundary layers.

7. The ESP of claim 6 , wherein the at most three boundary layers comprise at most opposing layers of the impeller hub and a layer of the at least one stationary diffuser.

8. The ESP of claim 1 , further comprising an up-thrust washer positioned above the impeller and a down-thrust washer positioned between the at least one rotating impeller and the at least one stationary diffuser.

9. The ESP of claim 1 , further comprising an up-thrust washer positioned above the at least one rotating impeller and a pair of hard alloy bearings positioned between the at least one rotating impeller and the at least one stationary diffuser.

10. The ESP of claim 1 , wherein the at least one rotating impeller comprises a plurality of impellers, and the at least one stationary diffuser comprises a plurality of diffusers, each impeller-diffuser pair providing a pumping stage to provide a plurality of pumping stages.

11. The ESP of claim 1 , further comprising a pump intake configured to suction production fluid into the ESP and a pump discharge configured to expel production fluid from the electrical submersible pump.

12. The ESP of claim 1 , wherein the at least one rotating impeller comprises two rotating impellers and the at least one stationary diffuser comprises two stationary diffusers, and

one of the two rotating impellers is between the two stationary diffusers and attached to the pump shaft, and is spaced apart from the other of the two rotating impellers by one of the two stationary diffusers so that axial movement of the one rotating impeller does not affect the other rotating impeller.

13. An electrical submersible pump (ESP) for use in a pumping system, the ESP comprising:

a plurality of impellers, each comprising an impeller hub and one or more impeller vanes projecting from the impeller hub, each of the one or more impeller vanes comprising an impeller vane edge; and

a plurality of diffusers positioned upstream and downstream one of the plurality of impellers, each of the plurality of diffusers comprising a diffuser hub and a diffuser shroud comprising a diffuser shroud surface,

wherein the plurality of impellers are open impellers, and each of the impeller vane edges of the plurality of impellers are separated from each of the diffuser shroud surfaces of the plurality of diffusers only by a clearance gap, and

wherein each clearance gap is calculated as a function of a length of one of the impeller hubs, a position of one of the diffuser shroud surfaces, an angle of one of the diffuser shrouds, and a position of one of the impeller vane edges.

14. The ESP of claim 13 , wherein the clearance gap ranges from 0.005 inches to 4-0.03 inches.

15. The ESP of claim 13 , wherein a pair of impellers of the plurality of impellers are separated from each other by one or more of one of the diffusers of the plurality of diffusers, a bearing, and a spacer, without being directly in contact or separated by a spring or biasing means.

16. The ESP of claim 13 , wherein each clearance gap is calculated as d=(h1−(d1+v1))×cos(a), wherein h1 is the length of the one of the impeller hubs, d1 is the position of the one of the diffuser shroud surfaces, a is the angle of the one of the diffuser shrouds, and v1 is the position of the one of the impeller vane edges.

17. The ESP of claim 13 , wherein the clearance gap is smaller than a boundary layer formed at each of the diffuser shroud surfaces.

18. The ESP of claim 13 , wherein one of the plurality of impellers and one of the plurality of diffusers together include at most three boundary layers.

19. The ESP of claim 18 , wherein the at most at three boundary layers comprise at most opposing layers of the impeller hubs and a layer of one of the plurality of diffusers.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 10, 2019
From: LEE, WOON YUNG; XUE, YING; CAI, YUN
To: ALKHORAYEF PETROLEUM COMPANY LIMITED
Reel/Frame 048849/0898 →
Continuity (1)
Related Publication 20200325901A1 · Oct 15, 2020
Cited By (1)
US 12,529,382