IP Library Granted Patent US 11,113,166
Granted Patent B2
US 11,113,166 · App. 16/206,295 · Granted Sep 7, 2021

Monitoring system and method with baseboard management controller

Inventors: Bing-Han Yang (New Taipei, TW); Po-Shen Kuo (New Taipei, TW)
Assignee: Wiwynn Corporation
G06F11/2294G06F11/0748G06F11/3013G06F11/3656G06F13/4282G06F2201/875
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,113,166
App. No.
16/206,295
Granted
Sep 7, 2021
Kind
B2
Abstract

A monitoring system includes a baseboard management controller (BMC) disposed on a same baseboard as a system under test; an administrator device electrically connected to the BMC; and a software test fixture stored in the BMC, the software test fixture generating an electrical signal, which is transferred to a corresponding target device of the system under test to access a register of the corresponding target device.

Claims (32)

1. A monitoring system, comprising:

a baseboard management controller (BMC) disposed on a same baseboard as a system under test including a plurality of target devices;

an administrator device electrically connected to the BMC;

a software test fixture stored in the BMC, the software test fixture including a plurality of in-target probe (ITP) firmware programs each generating an electrical signal, which is transferred to a corresponding target device of the system under test to access a register of the corresponding target device; and

a plurality of bridge integrated circuits each being connected between the BMC and the corresponding target device, each bridge integrated circuit having an associated Internet Protocol (IP) address used to select the corresponding target device;

wherein the administrator device updates firmware of the system under test according to a monitoring result of the system under test.

2. The monitoring system of claim 1 , wherein the BMC conforms to Intelligent Platform Management Interface (IPMI) protocol.

3. The monitoring system of claim 1 , further comprising an inter-board communication bus disposed between the BMC and the system under test.

4. The monitoring system of claim 1 , further comprising a communication interface that electrically connects the administrator device to the BMC.

5. The monitoring system of claim 4 , wherein the communication interface comprises a computer network.

6. The monitoring system of claim 1 , wherein the BMC comprises:

a processor;

a non-volatile memory that stores the software test fixture; and

a volatile memory that temporarily stores an executed result from the processor or received data.

7. The monitoring system of claim 1 , wherein the software test fixture is activated to monitor the corresponding target device.

8. The monitoring system of claim 7 , wherein the administrator device issues a command to the BMC to activate the software test fixture.

9. The monitoring system of claim 1 , wherein the administrator device comprises a user interface that displays content of the register of the corresponding target device under monitor.

10. The monitoring system of claim 1 , wherein the plurality of target devices each comprises an integrated circuit.

11. A monitoring method, comprising:

providing a software test fixture including a plurality of in-target probe (ITP) firmware programs each being associated with a corresponding target device of a plurality of target devices of a system under test, the software test fixture being stored in a baseboard management controller (BMC);

opening a user interface of an administrator device and selecting the corresponding target device;

electrically connecting the administrator device to the BMC;

activating the software test fixture;

accessing a register of the corresponding target device through the user interface; and

the administrator device updating firmware of the system under test according to a monitoring result of the system under test;

wherein the administrator device selects the corresponding target device according to an Internet Protocol (IP) address of an associated bridge integrated circuit of a plurality of bridge integrated circuits.

12. The method of claim 11 , wherein the software test fixture is stored in a non-volatile memory of the BMC.

13. The method of claim 11 , wherein the administrator device is electrically connected to the BMC via a computer network.

14. The method of claim 11 , wherein the administrator device activates the software test fixture by issuing a command to the BMC.

15. The method of claim 11 , wherein the BMC conforms to Intelligent Platform Management Interface (IPMI) protocol.

16. The method of claim 11 , wherein the BMC is disposed on a same baseboard as the system under test.

17. The method of claim 11 , wherein the software test fixture generates an electrical signal, which is transferred to the corresponding target device of the system under test to access the register of the corresponding target device.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 30, 2018
From: YANG, BING-HAN; KUO, PO-SHEN
To: WIWYNN CORPORATION
Reel/Frame 047707/0756 →
Priority Claims (1)
TW 107135209 · Oct 5, 2018 · national
Continuity (1)
Related Publication 20200110678A1 · Apr 9, 2020