IP Library Granted Patent US 11,166,183
Granted Patent B2
US 11,166,183 · App. 16/376,692 · Granted Nov 2, 2021

Measurement gap and synchronization signal block—based measurement timing configuration scheduling

Inventors: Jie Cui (Santa Clara, CA); Yang Tang (San Jose, CA)
Assignee: Intel Corporation
H04W24/10H04W24/08H04W56/001H04W72/0453
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,166,183
App. No.
16/376,692
Granted
Nov 2, 2021
Kind
B2
Abstract

Embodiments of the present disclosure address collisions and overlap between measurement gaps and synchronization signal block-based measurement time configurations. Other embodiments may be described and claimed.

Claims (18)

1. One or more non-transitory, computer-readable media having instructions that, when executed by one or more processors, cause a next-generation NodeB (gNB) to:

identify an active bandwidth part (BWP) to be used by a user equipment (UE);

determine whether the active BWP is to cover a synchronization signal block (SSB) to be transmitted by a target cell and that is to serve as a basis for a measurement performed by the UE within a measurement period; and

generate and cause transmission of one or more configuration messages to configure the UE to perform intra-frequency measurements on the SSB with or without a measurement gap based on the determination of whether the active BWP is to cover the SSB transmitted by the target cell.

2. The one or more non-transitory, computer-readable media of claim 1 , wherein the instructions, when executed, further cause the gNB to: generate and cause transmission of the one or more configuration messages to configure the UE to perform the intra-frequency measurements on the SSB with a measurement gap based on a determination that the active BWP is to be switched to not cover the SSB during the measurement period.

3. The one or more non-transitory, computer-readable media of claim 2 , wherein the one or more configuration messages are to configure the UE to perform the intra-frequency measurements on the SSB as a type-C measurement.

4. The one or more non-transitory, computer-readable media of claim 2 , wherein the active BWP is on a first set of physical resource blocks (PRBs) for a first time period and a second set of PRBs for a second time period, and the SSB is on PRBs within the first set of PRBs within the second time period.

5. The one or more non-transitory, computer-readable media of claim 1 , wherein the instructions, when executed, further cause the gNB to: generate and cause transmission of the one or more configuration messages to configure the UE to perform the intra-frequency measurements on the SSB without a measurement gap based on a determination that the active BWP is to cover the SSB during the measurement period.

6. The one or more non-transitory, computer-readable media of claim 1 , wherein the one or more configuration messages are to configure the UE to avoid radio link monitoring in an inactive bandwidth part.

7. The one or more non-transitory, computer-readable media of claim 1 , wherein the one or more configuration messages are to configure the UE to perform measurements of type A or B on the SSB within the active BWP.

8. An apparatus to be implemented in a next-generation NodeB (gNB), the apparatus comprising:

baseband circuitry to:

identify an active bandwidth part (BWP) to be used by a user equipment (UE);

determine whether the active BWP is to cover a synchronization signal block (SSB) to be transmitted by a target cell and that is to serve as a basis for a measurement performed by the UE within a measurement period; and

generate one or more configuration messages to configure the UE to perform intra-frequency measurements on the SSB with or without a measurement gap based on the determination of whether the active BWP is to cover the SSB transmitted by the target cell; and

interface circuitry coupled with the baseband circuitry to cause transmission of the one or more configuration message to the UE.

9. The apparatus of claim 8 , wherein the one or more configuration messages are to configure the UE to perform the intra-frequency measurements as type-C measurements on the SSB with a measurement gap based on a determination that the active BWP is to be switched to not cover the SSB during the measurement period.

10. The apparatus of claim 9 , wherein the active BWP is on a first set of physical resource blocks (PRBs) for a first time period and a second set of PRBs for a second time period, and the SSB is on PRBs within the first set of PRBs within the second time period.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 5, 2019
From: CUI, JIE; TANG, YANG
To: INTEL CORPORATION
Reel/Frame 048807/0701 →
Continuity (2)
Provisional Application 62653865 · Apr 6, 2018
Related Publication 20190239106A1 · Aug 1, 2019