IP Library Granted Patent US 11,208,862
Granted Patent B2
US 11,208,862 · App. 15/993,162 · Granted Dec 28, 2021

Method of drilling and completing a well

Inventor: James V. Maher (Houston, TX)
Assignee: Trendsetter Vulcan Offshore, Inc.
E21B33/064
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,208,862
App. No.
15/993,162
Granted
Dec 28, 2021
Kind
B2
Abstract

For completing a well, and for performing workover or intervention operations with the well, a surface BOP stack is coupled to the subsea wellhead or a subsea tree via a high pressure riser. The well is completed or the workover or intervention operations are performed through the surface BOP stack.

Claims (22)

1. A method for constructing and completing a well comprising:

coupling a conventional BOP stack to a subsea wellhead via a conventional riser;

drilling and casing a wellbore through the conventional BOP stack and conventional riser;

removing the conventional BOP stack from the subsea wellhead;

coupling a mudline closure device to the subsea wellhead, wherein the mudline closure device is rated for containing a pressure equal to 20,000 psi;

coupling a high pressure riser to the mudline closure device, wherein the high pressure riser is rated for containing a differential pressure equal to 15,000 psi;

coupling a surface BOP stack to the high pressure riser, wherein the surface BOP is rated for containing a pressure equal to 15,000 psi; and

completing the well through the surface BOP stack,

wherein completing the well is performed using a primary pressure barrier including a landing string coupled to a tubing hanger and a tubing, a secondary pressure barrier including the high pressure riser and the surface BOP stack, and without a subsea test tree.

2. A method for completing a well comprising:

removing a conventional BOP stack from a subsea wellhead after construction of a wellbore below the subsea wellhead;

coupling a mudline closure device to the subsea wellhead, wherein the mudline closure device is rated for containing a pressure equal to 20,000 psi;

coupling a high pressure riser to the mudline closure device, wherein the high pressure riser is rated for containing a pressure equal to 15,000 psi;

coupling a surface BOP stack to the high pressure riser, wherein the surface BOP is rated for containing a pressure equal to 15,000 psi; and

completing the well through the surface BOP stack, wherein the surface BOP is rated for containing a pressure equal to 15,000 psi,

wherein completing the well is performed using a primary pressure barrier including a landing string coupled to a tubing hanger and a tubing, a secondary pressure barrier including the high pressure riser and the surface BOP stack, and without a subsea test tree.

3. A method for workover or intervention operations with a well comprising:

coupling a mudline closure device to a subsea tree;

coupling a high pressure riser to the mudline closure device, wherein the mudline closure device is rated for containing a pressure equal to 20,000 psi;

coupling a surface BOP stack to the high pressure riser, wherein the high pressure riser is rated for containing a pressure equal to 15,000 psi; and

performing the workover or intervention operations through the surface BOP stack, wherein the surface BOP is rated for containing a pressure equal to 15,000 psi,

wherein the workover or intervention operations are performed using a primary pressure barrier including a landing string coupled to a tubing hanger and a tubing, a secondary pressure barrier including the high pressure riser and the surface BOP stack, and without dual redundant valves in a subsea test tree.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 2, 2019
From: MAHER, JAMES V.
To: TRENDSETTER VULCAN OFFSHORE, INC.
Reel/Frame 048767/0881 →
Continuity (3)
Provisional Application 62512585 · May 30, 2017
Related Publication 20190368300A1 · Dec 5, 2019
Related Publication 20200325747A9 · Oct 15, 2020
Cited By (1)
US 12,410,672