IP Library Granted Patent US 11,291,048
Granted Patent B2
US 11,291,048 · App. 16/783,670 · Granted Mar 29, 2022

Listen before talk

Inventors: Alireza Babaei (Fairfax, VA); Esmael Dinan (McLean, VA); Hua Zhou (Herndon, VA); Hyoungsuk Jeon (Centreville, VA); Ali Cagatay Cirik (Herndon, VA); Kyungmin Park (Vienna, VA); Kai Xu (Herndon, VA); Nazanin Rastegardoost (McLean, VA)
Assignee: Ofinno, LLC
H04W74/0808H04L1/1819H04L1/1835H04W16/14H04W28/0278H04W52/365H04W72/042H04W72/14H04W80/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,291,048
App. No.
16/783,670
Granted
Mar 29, 2022
Kind
B2
Abstract

A wireless device receives configuration parameters of one or more configured grants of an unlicensed cell. The wireless device receives a downlink control information indicating an uplink grant for a first TB corresponding to a first HARQ process. The wireless device stores, based on a first LBT procedure indicating a busy channel, the first TB in a first HARQ buffer associated with the first HARQ process. The first LBT is for a scheduled transmission of the first TB. The wireless device flushes, based on a second LBT procedure indicating a busy channel, a second HARQ buffer associated with a second HARQ process. The second LBT procedure is for a scheduled transmission of a second TB via a first configured grant of the one or more configured grants.

Claims (54)

1. A method comprising:

receiving, by a wireless device, configuration parameters of one or more configured grants on an unlicensed cell;

receiving a downlink control information indicating an uplink grant for a first transport block (TB) corresponding to a first hybrid automatic repeat request (HARQ) process;

storing, based on a first listen before talk (LBT) process indicating a busy channel, the first TB in a first HARQ buffer associated with the first HARQ process, wherein the first LBT process is for a scheduled transmission of the first TB; and

flushing, based on a second LBT process indicating a busy channel, a second HARQ buffer associated with a second HARQ process, wherein the second LBT process is for a scheduled transmission of a second TB via a first configured grant of the one or more configured grants.

2. The method of claim 1 , wherein:

the first HARQ process is identified with a first HARQ process identifier; and

the first TB is associated with the first HARQ process.

3. The method of claim 1 , wherein the second HARQ process and the first HARQ process are each identified with a same HARQ process identifier.

4. The method of claim 1 , further comprising selecting the second HARQ process for the second TB based on the first configured grant.

5. The method of claim 1 , further comprising receiving a second downlink control information indicating activation of at least one of the one or more configured grants on the unlicensed cell, wherein the at least one of the one or more configured grants comprises the first configured grant.

6. The method of claim 1 , further comprising:

creating the first TB based on the uplink grant; and

creating the second TB for the scheduled transmission via the first configured grant.

7. The method of claim 1 , further comprising determining, in response to flushing the second HARQ buffer, that the second HARQ process is an available HARQ process with an empty corresponding HARQ buffer.

8. The method of claim 1 , further comprising triggering a transmission of one or more medium access control control elements (MAC CEs) in response to flushing the second HARQ buffer, wherein the one or more MAC CEs comprise at least one of:

a buffer status report MAC CE; or

a power headroom report MAC CE.

9. The method of claim 1 , further comprising transmitting the second TB via a second configured grant of the one or more configured grants, in response to a third LBT procedure indicating a clear channel.

10. The method of claim 9 , further comprising selecting a third HARQ process for the second TB based on the second configured grant.

11. A wireless device comprising:

one or more processors; and

memory storing instructions that, when executed by the one or more processors, cause the wireless device to:

receive configuration parameters of one or more configured grants on an unlicensed cell;

receive a downlink control information indicating an uplink grant for a first transport block (TB) corresponding to a first hybrid automatic repeat request (HARQ) process;

store, based on a first LBT process indicating a busy channel, the first TB in a first HARQ buffer associated with the first HARQ process, wherein the first process is for a scheduled transmission of the first TB; and

flush, based on a second LBT process indicating a busy channel, a second HARQ buffer associated with a second HARQ process, wherein the second LBT process is for a scheduled transmission of a second TB via a first configured grant of the one or more configured grants.

12. The wireless device of claim 11 , wherein:

the first HARQ process is identified with a first HARQ process identifier; and

the first TB is associated with the first HARQ process.

13. The wireless device of claim 11 , wherein the second HARQ process and the first HARQ process are each identified with a same HARQ process identifier.

14. The wireless device of claim 11 , wherein the instructions, when executed by the one or more processors, further cause the wireless device to select the second HARQ process for the second TB based on the first configured grant.

15. The wireless device of claim 11 , wherein the instructions, when executed by the one or more processors, further cause the wireless device to receive a second downlink control information indicating activation of at least one of the one or more configured grants on the unlicensed cell, wherein the at least one of the one or more configured grants comprises the first configured grant.

16. The wireless device of claim 11 , wherein the instructions, when executed by the one or more processors, further cause the wireless device to:

create the first TB based on the uplink grant; and

create the second TB for the scheduled transmission via the first configured grant.

17. The wireless device of claim 11 , wherein the instructions, when executed by the one or more processors, further cause the wireless device to determine, in response to flushing the second HARQ buffer, that the second HARQ process is an available HARQ process with an empty corresponding HARQ buffer.

18. The wireless device of claim 11 , wherein the instructions, when executed by the one or more processors, further cause the wireless device to trigger a transmission of one or more MAC CEs in response to flushing the second HARQ buffer, wherein the one or more MAC CEs comprise at least one of:

a buffer status report MAC CE; or

a power headroom report MAC CE.

19. The wireless device of claim 11 , wherein the instructions, when executed by the one or more processors, further cause the wireless device to transmit the second TB via a second configured grant of the one or more configured grants in response to a third LBT procedure indicating a clear channel.

20. A system comprising:

a wireless device comprising:

one or more first processors; and

first memory storing first instructions that, when executed by the one or more first processors, cause the wireless device to:

receive configuration parameters of one or more configured grants on an unlicensed cell;

receive a downlink control information indicating an uplink grant for a first TB corresponding to a first HARQ process;

store, based on a first LBT process indicating a busy channel, the first TB in a first HARQ buffer associated with the first HARQ process, wherein the first LBT process is for a scheduled transmission of the first TB; and

flush, based on a second LBT process indicating a busy channel, a second HARQ buffer associated with a second HARQ process, wherein the second LBT process is for a scheduled transmission of a second TB via a first configured grant of the one or more configured grants; and

a base station comprising:

one or more second processors; and

second memory storing second instructions that, when executed by the one or more second processors, cause the base station to:

transmit the configuration parameters to the wireless device; and

transmit the downlink control information to the wireless device.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 3, 2020
From: BABAEI, ALIREZA; DINAN, ESMAEL H; ZHOU, HUA; XU, KAI; JEON, HYOUNGSUK; CIRIK, ALI C; PARK, KYUNGMIN; RASTEGARDOOST, NAZANIN
To: OFINNO, LLC
Reel/Frame 054537/0816 →
Continuity (3)
Provisional Application 62805569 · Feb 14, 2019
Provisional Application 62802291 · Feb 7, 2019
Related Publication 20200260486A1 · Aug 13, 2020
Cited By (1)
US 12,375,217