IP Library › Granted Patent US 11,569,662
Granted Patent B1
US 11,569,662 · App. 17/899,920 · Granted Jan 31, 2023

Consistent power delivery via stretch power delivery mode

Inventor: Thomas Buttgenbach (Santa Monica, CA)
Assignee: 8ME NOVA, LLC
H02J3/38G05B19/042H02J3/003H02J3/004G05B2219/2639H02J2300/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,569,662
App. No.
17/899,920
Granted
Jan 31, 2023
Kind
B1
Abstract

A method for delivering power to a grid. The method may include receiving a prediction of power generation for a renewable energy source (RES), receiving length of power delivery requirements of the grid, determining a stretch mode limit based on the prediction of power generation and the length of power delivery requirements such that a period of time during which the RES and an ESS can deliver power to the grid is extended to satisfy the length of power delivery requirements, wherein the stretch mode limit comprises a limit on power delivered to the grid, and delivering power to the grid according to the stretch mode limit from the RES and an energy storage system (ESS) electrically coupled to the RES, wherein the combined output of the RES and the ESS is limited by the stretch mode limit.

Claims (34)

1. A method comprising:

receiving a prediction of power generation for a renewable energy source (RES);

receiving length of power delivery requirements of a grid, wherein the length of power delivery requirements of the grid specifies an amount of time greater than a length of time of power generation of the RES;

determining a stretch mode limit based on the prediction of power generation and the length of power delivery requirements such that a period of time during which the RES and an energy storage system (ESS) can deliver power to the grid is extended to satisfy the length of power delivery requirements, wherein the stretch mode limit comprises a limit on power delivered to the grid, and wherein the stretch mode limit is below a point of grid interconnect (POGI) limit; and

delivering power to the grid according to the stretch mode limit from the RES and an energy storage system (ESS) electrically coupled to the RES, wherein the combined output of the RES and the ESS is limited by the stretch mode limit.

2. The method of claim 1 , wherein the stretch mode limit is determined low enough such that the RES and ESS can satisfy the length of power delivery requirements despite fluctuations in an RES power output.

3. The method of claim 1 , further comprising implementing the stretch mode limit at a first time and not implementing the stretch mode limit at a second time, wherein implementing the stretch mode limit comprises delivering power to the grid according to the stretch mode limit.

4. The method of claim 3 , wherein the stretch mode limit is implemented on a regular cycle.

5. The method of claim 4 , wherein the stretch mode limit is implemented in winter and not implemented in summer.

6. The method of claim 3 , further comprising implementing a second stretch mode limit at the second time.

7. The method of claim 6 , wherein the second stretch mode limit is higher than the stretch mode limit.

8. A system comprising:

a controller configured to:

receive a prediction of power generation for a renewable energy source (RES);

receive length of power delivery requirements of a grid, wherein the length of power delivery requirements of the grid specifies an amount of time greater than a length of time of power generation of the RES;

determine a stretch mode limit based on the prediction of power generation and the length of power delivery requirements such that a period of time during which the RES and an emery storage system (ESS) can deliver power to the grid is extended to satisfy the length of power delivery requirements, wherein the stretch mode limit comprises a limit on power delivered to the grid, and wherein the stretch mode limit is below a point of grid interconnect (POGI) limit; and

deliver power to the grid according to the stretch mode limit from the RES and an energy storage system (ESS) electrically coupled to the RES, wherein the combined output of the RES and the ESS is limited by the stretch mode limit.

9. The system of claim 8 , wherein the controller is further configured to determine the stretch mode limit low enough such that the RES and ESS can satisfy the length of power delivery requirements despite fluctuations in an RES power output.

10. The system of claim 8 , wherein the controller is further configured to implement the stretch mode limit at a first time and not implement the stretch mode limit at a second time, wherein implementing the stretch mode limit comprises delivering power to the grid according to the stretch mode limit.

11. The system of claim 10 , wherein the controller is further configured to implement the stretch mode limit on a regular cycle.

12. The system of claim 11 , wherein the controller is configured to implement the stretch mode limit in winter and not in summer.

13. The system of claim 10 , wherein the controller is further configured to implement a second stretch mode limit at the second time.

14. The system of claim 13 , wherein the second stretch mode limit is higher than the stretch mode limit.

15. A non-transitory, computer-readable medium comprising instructions, which, when executed by a processor, cause the processor to:

receive a prediction of power generation for a renewable energy source (RES);

receive length of power delivery requirements of a grid, wherein the length of power delivery requirements of the grid specifies an amount of time greater than a length of time of power generation of the RES;

determine a stretch mode limit based on the prediction of power generation and the length of power delivery requirements such that a period of time during which the RES and an energy storage system (ESS) can deliver power to the grid is extended to satisfy the length of power delivery requirements, wherein the stretch mode limit comprises a limit on power delivered to the grid, and wherein the stretch mode limit is below a point of grid interconnect (POGI) limit; and

deliver power to the grid according to the stretch mode limit from the RES and an energy storage system (ESS) electrically coupled to the RES, wherein the combined output of the RES and the ESS is limited by the stretch mode limit.

16. The medium of claim 15 , wherein the instructions further cause the processor to determine the stretch mode limit low enough such that the RES and ESS can satisfy the length of power delivery requirements despite fluctuations in an RES power output.

17. The medium of claim 15 , wherein the instructions further cause the processor to implement the stretch mode limit at a first time and not implement the stretch mode limit at a second time, wherein implementing the stretch mode limit comprises delivering power to the grid according to the stretch mode limit.

18. The medium of claim 17 , wherein the instructions further cause the processor to implement the stretch mode limit on a regular cycle.

19. The medium of claim 18 , wherein the instructions further cause the processor to implement the stretch mode limit in winter and not in summer.

20. The medium of claim 17 , wherein the instructions further cause the processor to implement a second stretch mode limit at the second time.

21. The medium of claim 20 , wherein the second stretch mode limit is higher than the stretch mode limit.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 31, 2022
From: BUTTGENBACH, THOMAS
To: 8ME NOVA, LLC
Reel/Frame 060951/0309 →
Continuity (1)
Continuation 17589596 · Jan 31, 2022
Cited By (2)
US 12,244,147 US 12,603,498