IP Library Granted Patent US 11,633,875
Granted Patent B2
US 11,633,875 · App. 16/354,759 · Granted Apr 25, 2023

Bottom face processing method of pillar-shaped honeycomb structure, manufacturing method of fired honeycomb structure, and manufacturing method of joined body

Inventors: Nobuhiro Fujie (Nagoya, JP); Yuji Watanabe (Nagoya, JP); Ken Itadu (Nagoya, JP); Yoshihiro Sato (Nagoya, JP)
Assignee: NGK Insulators, Ltd.
B28B11/007B23C3/00B23P15/00B24B27/0076B24B55/06B28B11/006B28B11/08B28B11/0845B28B11/12B28B11/18B28B11/243C04B38/0019F01N3/0222B23P2700/03Y10T29/49345
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,633,875
App. No.
16/354,759
Granted
Apr 25, 2023
Kind
B2
Abstract

A bottom face processing method of a pillar-shaped honeycomb structure including steps of: preparing a pillar-shaped honeycomb structure including a plurality of first cells which extend in parallel with each other from a first bottom face to a second bottom face, and each of which is opened in the first bottom face and has a protruding plugged portion in the second bottom face, and a plurality of second cells each of which is adjacent to at least one of the first cells with a partition wall interposed therebetween, which extend in parallel with each other from the first bottom face to the second bottom face, and each of which has a protruding plugged portion in the first bottom face, and is opened in the second bottom face; and removing the protruding portion from the plugged portion of each of the first cells and the second cells of the pillar-shaped honeycomb structure.

Claims (25)

1. A bottom face processing method of a pillar-shaped honeycomb structure comprising steps of:

preparing a pillar-shaped honeycomb structure including

a plurality of first cells which extend in parallel with each other from a first bottom face to a second bottom face, and each of which is opened in the first bottom face and has a plugged portion having a protruding portion in the second bottom face, and

a plurality of second cells each of which is adjacent to at least one of the first cells with a partition wall interposed therebetween, which extend in parallel with each other from the first bottom face to the second bottom face, and each of which has a plugged portion having a protruding portion in the first bottom face, and is opened in the second bottom face; and

removing the protruding portion from the plugged portion of each of the first cells and the second cells of the pillar-shaped honeycomb structure without the first bottom face and the second bottom face being masked, and

wherein the step of removing the protruding comprises bringing a plurality of brush bristles into contact with the protruding portion of each of the first bottom face and the second bottom face while rotating at least one rotary brush which includes a base which is rotatable around a rotational axis, and the brush bristles implanted to a surface of the base, and whose rotational axis is parallel with the extending direction of the first cells and the second cells.

2. The bottom face processing method of the pillar-shaped honeycomb structure according to claim 1 , wherein

in the at least one rotary brush, a center of gravity of a surface region of the base in which the brush bristles are implanted is located at a position decentered from the rotational axis.

3. The bottom face processing method of the pillar-shaped honeycomb structure according to claim 2 , wherein

the rotational axis is positioned inside an outer peripheral contour of the surface region of the base in which the brush bristles are implanted.

4. The bottom face processing method of the pillar-shaped honeycomb structure according to claim 2 , wherein

the center of gravity of the surface region of a base in which the brush bristles are implanted is located at a position decentered by not less than 3 mm from the rotational axis.

5. The bottom face processing method of the pillar-shaped honeycomb structure according to claim 1 , wherein

the step of removing the protruding portion includes relatively moving the at least one rotary brush in a direction parallel with the first bottom face and the second bottom face of the pillar-shaped honeycomb structure.

6. The bottom face processing method of the pillar-shaped honeycomb structure according to claim 1 , wherein

the step of removing the protruding portion is performed while the first bottom face and the second bottom face of the pillar-shaped honeycomb structure are interposed between one or more pairs of the at least one rotary brush.

7. The bottom face processing method of the pillar-shaped honeycomb structure according to claim 1 , wherein

the base has an annular surface region in which the brush bristles are implanted, and includes a suction port in communication with a suction apparatus in a portion on inner side of an inner peripheral contour of the annular surface region, and wherein

the suction apparatus is operated while the step of removing the protruding portion is performed, and the removed protruding portion is suctioned from the suction port.

8. A manufacturing method of a fired honeycomb structure, comprising steps of:

obtaining a pillar-shaped honeycomb structure having been subjected to bottom face processing by performing the bottom face processing method of the pillar-shaped honeycomb structure according to claim 1 ; and

firing the pillar-shaped honeycomb structure having been subjected to the bottom face processing.

9. A manufacturing method of a joined body, including steps of:

obtaining a plurality of fired honeycomb structures by performing the manufacturing method of the fired honeycomb structure according to claim 8 ; and

joining side faces of the plurality of fired honeycomb structures via a joining material with a mask being bonded to both bottom faces of each of the fired honeycomb structures.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 15, 2019
From: FUJIE, NOBUHIRO; WATANABE, YUJI; ITADU, KEN; SATO, YOSHIHIRO
To: NGK INSULATORS, LTD.
Reel/Frame 048610/0793 →
Priority Claims (1)
JP JP2018-060669 · Mar 27, 2018 · national
Continuity (1)
Related Publication 20190299487A1 · Oct 3, 2019