IP Library Granted Patent US 11,920,421
Granted Patent B2
US 11,920,421 · App. 17/636,338 · Granted Mar 5, 2024

Subsea wellhead support system and associated method of installing a subsea wellhead support system

Inventors: Kristian Arnø-Kristoffersen (Drammen, NO); Gøran Olof Sundqvist (Sandefjord, NO)
E21B33/035E21B41/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,920,421
App. No.
17/636,338
Granted
Mar 5, 2024
Kind
B2
Abstract

The invention relates to a subsea wellhead support system ( 1 ) comprising: —a foundation assembly ( 2 ); —a conductor housing ( 31 ) for supporting a wellhead ( 4 ); —a connection arrangement ( 5 ) between the foundation assembly ( 2 ) and the conductor housing ( 3 ′); wherein the connection arrangement ( 5 ) is configured to releasably connect the conductor housing ( 3 ′) to the foundation assembly ( 2 ), such that: —during installation of the subsea wellhead support system ( 1 ), the conductor housing ( 1 ) can be fixed relative the foundation assembly ( 2 ), and—after installation of the subsea wellhead support system ( 1 ), the connection arrangement ( 5 ) can be released from the foundation assembly ( 2 ) allowing the conductor housing ( 3 ′) to move parallel along a longitudinal direction of a throughgoing opening of the conductor housing ( 31 ).

Claims (28)

1. A subsea wellhead support system comprising:

a foundation assembly;

a conductor housing for supporting a wellhead; and

a connection arrangement which is fixedly connected to the conductor housing;

wherein the connection arrangement is configured to releasably connect the conductor housing to the foundation assembly such that, during installation of the subsea wellhead support system, the conductor housing can be fixed relative the foundation assembly, and after installation of the subsea wellhead support system, the connection arrangement can be disconnected from the foundation assembly to allow the conductor housing to move parallel along a longitudinal direction of a through-going opening of the conductor housing.

2. The subsea system according to claim 1 , wherein the foundation assembly comprises a suction anchor.

3. The subsea system according to claim 1 , wherein the foundation assembly comprises a well template structure having at least one well slot and a number of suction anchors.

4. The subsea system according to claim 1 , further comprising a conductor extension which is fixedly connected to the conductor housing.

5. The subsea system according to claim 1 , further comprising a fluid-tight cap covering a cross section of the conductor housing.

6. The subsea system according to claim 1 , further comprising a guide pipe fixedly connected to the foundation assembly, wherein the conductor housing is arranged radially inside the guide pipe.

7. The subsea system according to claim 6 , further comprising a conductor extension which is fixedly connected to the conductor housing.

8. The subsea system according to claim 2 , wherein the conductor housing is arranged inside a periphery of the of the suction anchor.

9. The subsea system according to claim 2 , wherein the connection arrangement is configured to provide a fluid tight seal between the suction anchor and the conductor housing.

10. The subsea system according to claim 1 , wherein the connection arrangement comprises a safety device configured to fail when subjected to a force above a predetermined force to thereby release the conductor housing from the foundation assembly.

11. The subsea system according to claim 1 , wherein the connection arrangement comprises a lock operable by an ROV after installation of the subsea system.

12. The subsea system according to claim 2 , further comprising a pump arrangement comprising at least one pump configured to create an underpressure in an inner volume formed by a surface of a seabed, a side portion of the suction anchor and a top portion of the suction anchor relative to a surrounding pressure.

13. The subsea system according to claim 2 , wherein the conductor housing is arranged radially outside a periphery of the suction anchor.

14. A method of installing a subsea support system comprising:

a foundation assembly;

a conductor housing for supporting a wellhead; and

a connection arrangement which is fixedly connected to the conductor housing;

wherein the method comprises the steps of:

prior to installing the subsea support system subsea, releasably connecting the conductor housing to the foundation assembly using the connection arrangement, thereby fixing the conductor housing relative the foundation assembly;

installing the subsea support system subsea in a single run;

after installation of the subsea wellhead support system, disconnecting the connection arrangement so as to release the conductor housing from the foundation assembly, thereby allowing parallel movement of the conductor housing along a longitudinal direction of a through-going opening of the conductor housing.

15. The method according to claim 14 , wherein the step of disconnecting the connection arrangement comprises operating a Remotely Operated Vehicle to release the conductor housing from the foundation assembly.

16. The method according to claim 15 , wherein the step of releasably connecting the conductor housing to the foundation assembly comprises selecting a connection force of the connection arrangement which is above a maximum expected force occurring during the installation and below a median of expected force of a well-growth during production of a well extending through the conductor housing.

17. The method according to claim 16 , wherein the connection arrangement comprises shear element(s) which break at predetermined shear forces, and wherein the method comprises selecting a type and/or number of shear element(s) based on said maximum expected installation forces and the median expected well-growth forces.

Assignments (2)
CHANGE OF NAME Recorded Jun 17, 2025
From: FMC KONGSBERG SUBSEA AS
To: TECHNIPFMC NORGE AS
Reel/Frame 071648/0304 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 17, 2022
From: ARNØ-KRISTOFFERSEN, KRISTIAN; SUNDQVIST, GØRAN OLOF
To: FMC KONGSBERG SUBSEA AS
Reel/Frame 059041/0843 →
Priority Claims (1)
NO 20191016 · Aug 22, 2019 · national
Continuity (1)
Related Publication 20220341274A1 · Oct 27, 2022