IP Library Granted Patent US 12,018,458
Granted Patent B2
US 12,018,458 · App. 17/802,745 · Granted Jun 25, 2024

Construction machine

Inventors: Seiji Hijikata (Tsukuba, JP); Yasutaka Tsuruga (Ryugasaki, JP); Kenji Hiraku (Kasumigaura, JP); Masatoshi Hoshino (Tsuchiura, JP)
Assignee: Hitachi Construction Machinery Co., Ltd.
E02F9/2217E02F9/2221E02F9/2285F15B11/028F15B11/08B60Y2200/412
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,018,458
App. No.
17/802,745
Granted
Jun 25, 2024
Kind
B2
Abstract

It is an object of the present invention to provide a construction machine capable of efficiently driving a hydraulic cylinder by an accumulator. Thus, the construction machine includes a first control valve disposed in a first hydraulic fluid line connecting a bottom-side fluid chamber of a hydraulic cylinder with an accumulator, and a second control valve disposed in a second hydraulic fluid line connecting a rod-side fluid chamber of the hydraulic cylinder with a tank. The construction machine further includes a third control valve disposed in a third hydraulic fluid line connecting the rod-side fluid chamber with the accumulator, and a fourth control valve disposed in a fourth hydraulic fluid line connecting a line part of the first hydraulic fluid line, which connects the bottom-side fluid chamber with the third control valve, and a line part of the third hydraulic fluid line, which connects the rod-side fluid chamber with the third control valve, with each other.

Claims (54)

1. A construction machine comprising:

a tank that reserves a hydraulic fluid;

a hydraulic cylinder;

an accumulator that accumulates a return fluid from the hydraulic cylinder;

a first control valve disposed in a first hydraulic fluid line connecting a bottom-side fluid chamber of the hydraulic cylinder with the accumulator; and

a second control valve disposed in a second hydraulic fluid line connecting a rod-side fluid chamber of the hydraulic cylinder with the tank, wherein

the construction machine includes:

a third control valve disposed in a third hydraulic fluid line connecting the rod-side fluid chamber with the accumulator;

a fourth control valve disposed in a fourth hydraulic fluid line connecting a line part of the first hydraulic fluid line, the line part connecting the bottom-side fluid chamber with the first control valve, and a line part of the third hydraulic fluid line, the line part connecting the rod-side fluid chamber with the third control valve, with each other;

an operation lever for issuing an instruction on an operation of the hydraulic cylinder;

a controller that controls the first control valve, the second control valve, and the third control valve according to an instruction inputted through the operation lever; and

a first pressure sensor that senses a pressure inside the bottom-side fluid chamber,

the fourth control valve is configured

to close in a case where an extending operation of the hydraulic cylinder is instructed through the operation lever, and

to open in a case where a shrinking operation of the hydraulic cylinder is instructed through the operation lever, and

the controller is configured

to open the first control valve and the second control valve and close the third control valve in a case where an extending operation of the hydraulic cylinder is instructed through the operation lever and the pressure inside the bottom-side fluid chamber sensed by the first pressure sensor is higher than a first predetermined pressure, and

to open the first control valve and the third control valve and close the second control valve in a case where an extending operation of the hydraulic cylinder is instructed through the operation lever and the pressure inside the bottom-side fluid chamber sensed by the first pressure sensor is equal to or lower than the first predetermined pressure.

2. A construction machine comprising:

a tank that reserves a hydraulic fluid;

a hydraulic cylinder;

an accumulator that accumulates a return fluid from the hydraulic cylinder;

a first control valve disposed in a first hydraulic fluid line connecting a bottom-side fluid chamber of the hydraulic cylinder with the accumulator;

a second control valve disposed in a second hydraulic fluid line connecting a rod-side fluid chamber of the hydraulic cylinder with the tank,

a third control valve disposed in a third hydraulic fluid line connecting the rod-side fluid chamber with the accumulator; and

a fourth control valve disposed in a fourth hydraulic fluid line connecting a line part of the first hydraulic fluid line, the line part connecting the bottom-side fluid chamber with the first control valve, and a line part of the third hydraulic fluid line, the line part connecting the rod-side fluid chamber with the third control valve, with each other, wherein

the construction machine includes a hydraulic pump, and

the fourth control valve is a directional control valve capable of supplying a hydraulic fluid delivered from the hydraulic pump to the hydraulic cylinder and discharging a return fluid from the hydraulic cylinder to the tank.

3. A construction machine comprising:

a tank that reserves a hydraulic fluid;

a hydraulic cylinder;

an accumulator that accumulates a return fluid from the hydraulic cylinder;

a first control valve disposed in a first hydraulic fluid line connecting a bottom-side fluid chamber of the hydraulic cylinder with the accumulator;

a second control valve disposed in a second hydraulic fluid line connecting a rod-side fluid chamber of the hydraulic cylinder with the tank,

a third control valve disposed in a third hydraulic fluid line connecting the rod-side fluid chamber with the accumulator; and

a fourth control valve disposed in a fourth hydraulic fluid line connecting a line part of the first hydraulic fluid line, the line part connecting the bottom-side fluid chamber with the first control valve, and a line part of the third hydraulic fluid line, the line part connecting the rod-side fluid chamber with the third control valve, with each other, wherein

the construction machine includes:

a first pilot check valve disposed in a line part of the first hydraulic fluid line, the line part connecting the bottom-side fluid chamber with the first control valve;

a second pilot check valve disposed in a line part of the fourth hydraulic fluid line, the line part connecting the bottom-side fluid chamber with the directional control valve;

a first valve block that unites together the first control valve, the second control valve, the third control valve, and the first pilot check valve; and

a second valve block that unites together the directional control valve and the second pilot check valve.

4. A construction machine comprising:

a tank that reserves a hydraulic fluid;

a hydraulic cylinder;

an accumulator that accumulates a return fluid from the hydraulic cylinder;

a first control valve disposed in a first hydraulic fluid line connecting a bottom-side fluid chamber of the hydraulic cylinder with the accumulator;

a second control valve disposed in a second hydraulic fluid line connecting a rod-side fluid chamber of the hydraulic cylinder with the tank,

a third control valve disposed in a third hydraulic fluid line connecting the rod-side fluid chamber with the accumulator; and

a fourth control valve disposed in a fourth hydraulic fluid line connecting a line part of the first hydraulic fluid line, the line part connecting the bottom-side fluid chamber with the first control valve, and a line part of the third hydraulic fluid line, the line part connecting the rod-side fluid chamber with the third control valve, with each other, wherein

the construction machine includes:

a hydraulic pump;

a fifth control valve that selectively connects a delivery port of the hydraulic pump to the accumulator or the tank; and

a second pressure sensor that senses a pressure inside the accumulator, wherein

the controller is configured control the fifth control valve such that the delivery port of the hydraulic pump is connected to the tank in a case where the pressure inside the accumulator sensed by the second pressure sensor is equal to or higher than a second predetermined pressure, and that the delivery port of the hydraulic pump is connected to the accumulator second pressure the pressure inside the accumulator sensed by the second pressure sensor is lower than the second predetermined pressure.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 29, 2022
From: HIJIKATA, SEIJI; TSURUGA, YASUTAKA; HIRAKU, KENJI; HOSHINO, MASATOSHI
To: HITACHI CONSTRUCTION MACHINERY CO., LTD.
Reel/Frame 060930/0369 →
Priority Claims (1)
JP 2020-104904 · Jun 17, 2020 · national
Continuity (1)
Related Publication 20230084767A1 · Mar 16, 2023