IP Library Granted Patent US 12,173,597
Granted Patent B2
US 12,173,597 · App. 18/045,994 · Granted Dec 24, 2024

Methods for completing hydrocarbon wells using variable rate fracturing

Inventors: Lee J. Hall (The Woodlands, TX); Dragan Stojkovic (Spring, TX)
Assignee: ExxonMobil Technology and Engineering Company
E21B43/267C09K8/80E21B43/119
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,173,597
App. No.
18/045,994
Granted
Dec 24, 2024
Kind
B2
Abstract

Methods for completing hydrocarbon wells using variable rate fracturing are provided herein. One method includes positioning a perforation device within a tubular conduit of a downhole tubular, where the downhole tubular extends within a wellbore, and where the wellbore extends within a subsurface region, as well as perforating the downhole tubular using the perforation device to define perforations within the downhole tubular. The method also includes pumping a slurry including fracturing fluid and a lightweight proppant into the tubular conduit according to a variable pumping rate schedule to fracture zones of the subsurface region that are proximate to the perforations, forming corresponding fractures within the subsurface region. The method further includes flowing the slurry into the fractures, via the perforations, to prop the fractures with the lightweight proppant, where the lightweight proppant includes granules formed from a polyolefin, petroleum coke, and/or a polyaromatic hydrocarbon resin.

Claims (23)

1. A method of completing a hydrocarbon well using variable rate fracturing, the method comprising:

positioning a perforation device within a tubular conduit of a downhole tubular, wherein the downhole tubular extends within a wellbore, and wherein the wellbore extends within a subsurface region;

perforating the downhole tubular using the perforation device to define a plurality of perforations within the downhole tubular;

pumping a slurry comprising a fracturing fluid and a lightweight proppant into the tubular conduit according to a variable pumping rate schedule to fracture a plurality of zones of the subsurface region that are proximate to the plurality of perforations, forming a plurality of corresponding fractures within the subsurface region; and

flowing the slurry comprising the fracturing fluid and the lightweight proppant into at least a portion of the plurality of fractures, via the perforations, to prop the fractures with the lightweight proppant; wherein the lightweight proppant comprises a plurality of granules comprising petroleum coke, wherein the petroleum coke comprises at least one of flexicoke, fluid coke, or pulverized delayed coke; and wherein a characteristic dimension of the plurality of granules is at least 10 micrometers and at most 3 millimeters, the lightweight proppant staying suspended during the variable rate fracturing.

2. The method of claim 1 , further comprising formulating the lightweight proppant and controlling the variable pumping rate schedule such that settling of the lightweight proppant within a near-perforation region of each fracture is minimized.

3. The method of claim 1 , wherein the slurry further comprises a conventional proppant.

4. The method of claim 1 , comprising alternating between pumping only the fracturing fluid and pumping the slurry comprising the fracturing fluid and the lightweight proppant into the tubular conduit according to the variable pumping rate schedule to fracture the plurality of zones of the subsurface region that are proximate to the plurality of perforations.

5. The method of claim 1 , further comprising flowing a slurry comprising the fracturing fluid and a conventional proppant into at least a portion of the plurality of fractures, via the perforations, to prop the fractures with the conventional proppant.

6. The method of claim 1 , wherein the plurality of granules comprises a polyolefin that comprises at least one of polypropylene (PP), polyethylene (PE), a blend of PP and PE, or PE wax.

7. The method of claim 1 , comprising forming the granules of the lightweight proppant from a polyolefin-coke composite material.

8. The method of claim 7 , comprising forming the granules of the lightweight proppant from the polyolefin-coke composite material such that the plurality of granules comprise at least 40 weight percent (wt %) and at most 90 wt % polyolefin and at least 10 wt % and at most 60 wt % petroleum coke.

9. The method of claim 1 , comprising coating at least a portion of the granules of the lightweight proppant with a polymer.

10. The method of claim 9 , wherein the polymer comprises at least one of epoxy, methacrylate, polyester, vinyl ester, furan, furfural, alcohol-furfural, polyurethane, urea-aldehyde, or phenol-aldehyde.

11. The method of claim 1 , wherein pumping the slurry comprising the fracturing fluid and the lightweight proppant into the tubular conduit according to the variable pumping rate schedule comprises sequentially increasing and decreasing a pumping rate for pumping the slurry comprising the fracturing fluid and the lightweight proppant into the tubular conduit such that a plurality of pressure cycles are induced within the tubular conduit.

12. The method of claim 1 , comprising formulating the granules of the lightweight proppant based on conditions within the subsurface region and parameters corresponding to pumping the slurry comprising the fracturing fluid and the lightweight proppant into the tubular conduit.

13. The method of claim 1 , comprising performing the method for each of a plurality of stages of the wellbore.

14. The method of claim 1 , comprising providing the lightweight proppant with a density of between 0.8 grams per cubic centimeter (g/cc) and 1.6 g/cc.

15. A method of completing a hydrocarbon well using variable rate fracturing, the method comprising hydraulically fracturing a subsurface region through which a wellbore extends by sequentially increasing and decreasing a pumping rate for pumping a slurry comprising a fracturing fluid and a lightweight proppant into the subsurface region via a tubular conduit of the wellbore; wherein the sequential increase and decrease of the pumping rate and a formulation of the lightweight proppant are controlled such that the lightweight proppant stays suspended during the variable rate fracturing and settling of the lightweight proppant within a near-wellbore region of the subsurface region is minimized; and wherein the lightweight proppant comprises a plurality of granules comprising petroleum coke, wherein the petroleum coke comprises at least one of flexicoke, fluid coke, or pulverized delayed coke.

16. The method of claim 15 , wherein the slurry further comprises a conventional proppant.

17. The method of claim 15 , comprising forming the granules of the lightweight proppant from a polyolefin-coke composite material.

18. The method of claim 15 , comprising coating at least a portion of the granules of the lightweight proppant with a polymer.

19. The method of claim 15 , comprising providing the lightweight proppant with a density of between 0.8 grams per cubic centimeter (g/cc) to 1.6 g/cc.

Continuity (2)
Provisional Application 63262756 · Oct 20, 2021
Related Publication 20230119075A1 · Apr 20, 2023