IP Library Granted Patent US 12,207,201
Granted Patent B2
US 12,207,201 · App. 17/746,774 · Granted Jan 21, 2025

Uplink power control in a wireless device

Inventor: Esmael Hejazi Dinan (McLean, VA)
Assignee: Ofinno, LLC
H04W52/146H04W52/242
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,207,201
App. No.
17/746,774
Granted
Jan 21, 2025
Kind
B2
Abstract

A wireless device receives configuration parameters of a plurality of cells grouped into: a primary physical uplink control channel (PUCCH) group comprising a primary cell with a primary PUCCH, and a secondary PUCCH group comprising a PUCCH secondary cell with a secondary PUCCH. The wireless device receives, for a cell in the plurality of cells, downlink control information comprising a PUCCH transmit power control (TPC) command and scheduling information for the cell. The downlink control information does not have either a downlink control information format 3 or a downlink control information format 3A. The wireless device determines whether the cell is the primary cell or the PUCCH secondary cell. Based on the determining, the wireless device calculates a transmit power for one of the primary PUCCH and the secondary PUCCH and transmits uplink signals with the transmit power.

Claims (42)

1. A method comprising:

transmitting, by a base station, configuration parameters of a plurality of cells grouped into:

a primary physical uplink control channel (PUCCH) group comprising a primary cell with a primary PUCCH; and

a secondary PUCCH group comprising a PUCCH secondary cell with a secondary PUCCH;

transmitting, for a cell in the plurality of cells, downlink control information comprising a PUCCH transmit power control (TPC) command and scheduling information for the cell, wherein:

a downlink control information format of the downlink control information does not have a downlink control information format 3; and

the downlink control information format of the downlink control information does not have a downlink control information format 3A; and

receiving uplink signals with a transmit power calculated, for one of the primary PUCCH or the secondary PUCCH, employing the PUCCH TPC command, wherein the one of the primary PUCCH or the secondary PUCCH is determined based on whether the cell is the primary cell or the PUCCH secondary cell.

2. The method of claim 1 , further comprising transmitting, by the base station, the configuration parameters to a wireless device.

3. The method of claim 1 , further comprising transmitting, by the base station, a media access control (MAC) activation command indicating activation of the PUCCH secondary cell.

4. The method of claim 1 , wherein the downlink control information is transmitted in a wireless device specific search space of a physical downlink control channel of the PUCCH secondary cell.

5. The method of claim 1 , further comprising transmitting by the base station:

one or more first PUCCH information elements (IEs) indicating one or more PUCCH formats of the secondary PUCCH; and

one or more second PUCCH power control IEs indicating a power parameter value for at least one of the one or more PUCCH formats;

wherein the transmit power is further calculated employing the one or more second PUCCH power control IEs.

6. The method of claim 1 , further comprising transmitting, by the base station, a pathloss reference parameter indicating a pathloss reference cell of the PUCCH secondary cell.

7. The method of claim 1 , wherein the uplink signals comprise channel state information.

8. The method of claim 1 , further comprising transmitting, on a common search space of the primary cell, a second PUCCH TPC command for the secondary PUCCH.

9. The method of claim 1 , wherein the transmit power is calculated, for the primary PUCCH, employing the PUCCH TPC command.

10. The method of claim 9 , wherein the uplink signals are received on the primary PUCCH with the transmit power.

11. A base station comprising:

one or more processors; and

memory storing instructions that, when executed by the one or more processors, cause the base station to perform operations comprising:

transmitting configuration parameters of a plurality of cells grouped into:

a primary physical uplink control channel (PUCCH) group comprising a primary cell with a primary PUCCH; and

a secondary PUCCH group comprising a PUCCH secondary cell with a secondary PUCCH;

transmit, for a cell in the plurality of cells, downlink control information comprising a PUCCH transmit power control (TPC) command and scheduling information for the cell, wherein:

a downlink control information format of the downlink control information does not have a downlink control information format 3; and

the downlink control information format of the downlink control information does not have a downlink control information format 3A; and

receive uplink signals with a transmit power calculated, for one of the primary PUCCH or the secondary PUCCH, employing the PUCCH TPC command, wherein the one of the primary PUCCH or the secondary PUCCH is determined based on whether the cell is the primary cell or the PUCCH secondary cell.

12. The base station of claim 11 , wherein the operations further comprise transmitting, by the base station, the configuration parameters to a wireless device.

13. The base station of claim 11 , wherein the operations further comprise transmitting, by the base station, a media access control (MAC) activation command indicating activation of the PUCCH secondary cell.

14. The base station of claim 11 , wherein the downlink control information is transmitted in a wireless device specific search space of a physical downlink control channel of the PUCCH secondary cell.

15. The base station of claim 11 , wherein the operations further comprise transmitting by the base station:

one or more first PUCCH information elements (IEs) indicating one or more PUCCH formats of the secondary PUCCH; and

one or more second PUCCH power control IEs indicating a power parameter value for at least one of the one or more PUCCH formats;

wherein the transmit power is further calculated employing the one or more second PUCCH power control IEs.

16. The base station of claim 11 , wherein the operations further comprise transmitting, by the base station, a pathloss reference parameter indicating a pathloss reference cell of the PUCCH secondary cell.

17. The base station of claim 11 , wherein the uplink signals comprise channel state information.

18. The base station of claim 11 , wherein the operations further comprise transmitting, on a common search space of the primary cell, a second PUCCH TPC command for the secondary PUCCH.

19. The base station of claim 11 , wherein the transmit power is calculated, for the primary PUCCH, employing the PUCCH TPC command.

20. The base station of claim 19 , wherein the uplink signals are received on the primary PUCCH with the transmit power.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 8, 2025
From: OFINNO, LLC
To: PENINSULA TECHNOLOGIES, LLC
Reel/Frame 069849/0289 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 7, 2022
From: DINAN, ESMAEL HEJAZI
To: OFINNO, LLC
Reel/Frame 060429/0230 →
Continuity (4)
Continuation 15186502 · Jun 19, 2016
Provisional Application 62186130 · Jun 29, 2015
Provisional Application 62182466 · Jun 20, 2015
Related Publication 20220279457A1 · Sep 1, 2022
References Cited (54)
US 8311053B2 · Choi · 2012 [cited by applicant]
US 9414335B2 · Moon et al. · 2016 [cited by applicant]
US 9451639B2 · Li et al. · 2016 [cited by applicant]
US 9806932B2 · Zhang et al. · 2017 [cited by applicant]
US 9923684B2 · Ng et al. · 2018 [cited by applicant]
US 10129901B2 · Suzuki et al. · 2018 [cited by applicant]
US 10172157B2 · Chen et al. · 2019 [cited by applicant]
US 10743335B2 · Aiba et al. · 2020 [cited by applicant]
US 11356956B2 · Dinan · 2022 [cited by examiner]
US 20140177500A1 · Han et al. · 2014 [cited by applicant]
US 20150189574A1 · Ng et al. · 2015 [cited by applicant]
US 20150245307A1 · Chen et al. · 2015 [cited by applicant]
US 20160374026A1 · Dinan · 2016 [cited by applicant]
US 20160374027A1 · Dinan · 2016 [cited by applicant]
US 20180013533A1 · Yang et al. · 2018 [cited by applicant]
CN 107211415B · 2021 [cited by applicant]
EP 3070870B1 · 2018 [cited by applicant]
WO 2010074504A2 · 2010 [cited by applicant]
3GPP TS 36.211 V12.4.0 (Dec. 2014); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels… [cited by applicant]
3GPP TS 36.212 V12.3.0 (Dec. 2014); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Multiplexing and … [cited by applicant]
3GPP TS 36.213 V12.4.0 (Dec. 2014); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer pr… [cited by applicant]
3GPP TS 36.300 V12.4.0 (Dec. 2014); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Univer… [cited by applicant]
3GPP TS 36.321 V12.4.0 (Dec. 2014); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Medium Access Con… [cited by applicant]
3GPP TS 36.331 V12.4.1 (Dec. 2014); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Co… [cited by applicant]
R1-150357; 3GPP TSG RAN WG1 #80; Athens, Greece, Feb. 9-13, 2015; Agenda item: 7.2.2.1; Source: Samsung; Title: PUCCH Transmission on SCell for CA; Document for: Discussion and Decision. [cited by applicant]
R1-150468; 3GPP TSG RAN WG1 #80; Feb. 9-Feb. 13, 2015; Athens, Greece; Agenda item: 7.2.2.1; Source: Qualcomm Incorporated; Title: PUCCH on SCell; Document for: Discussion and Decision. [cited by applicant]
R1-150823; 3GPP TSG RAN WG1 #80; Athens, Greece, Feb. 9-13, 2015; Agenda item 7.2.1.1; Title: WF on PUCCH on SCell for CA, Source: NTT Docomo, NEC, Sharp, Softbank Mobile, Intel, Ericsson, KDDI. [cited by applicant]
R1-152772; 3GPP TSG RAN WG1 #81; May 25-29, 2015; Fukuoka, Japan; Source: Qualcomm Incorporated, Title: Remaining aspects of PUCCH on SCell; Document for: Discussion and Decision. [cited by applicant]
R1-152847; 3GPP TSG RAN WG1 #81; Fukuoka, Japan, May 25-29, 2015; Source: Samsung; Title: Remaining Aspects for PUCCH Transmission on a SCell; Document for: Discussion and Decision. [cited by applicant]
R1-153397; 3GPP TSG RAN WG1 #81; Fukuoka, Japan, May 25-29, 2015; Agenda item: 6.2.2.1; Source: Samsung; Title: Remaining Aspects for PUCCH Transmission on a SCell; Document for: Discussion and Decision. [cited by applicant]
R1-153459; 3GPP TSG RAN WG1 #81; Fukuoka, Japan, May 25-29, 2015; Agenda item 6.2.2.1; Title: Way Forward on power control for CA with PUCCH on Scell; Source: LG Electronics, Intel Corporation, ZTE, ITL, Qualcomm. [cited by applicant]
R1-153497; 3GPP TSG RAN WG1 #81; Fukuoka, Japan, May 25-29, 2015; Agenda item 6.2.2.1; Title: Way Forward on power control for CA with PUCCH on Scell; Source: LG Electronics, NTT Docomo, CATT, Samsung, Nokia Network, Qu… [cited by applicant]
R1-150102; 3GPP TSG RAN WG1 Meeting #80; Athens, Greece, Feb. 9-13, 2015; Source: CATT; Title: Uplink power control to support PUCCH on SCell for Rel-13 CA; Agenda Item: 7.2.2.1; Document for: Discussion/Decision. [cited by applicant]
R1-150067; 3GPP TSG RAN WG1 Meeting #80; Athens, Greece, Feb. 9-13, 2015; Agenda Item: 7.2.2.1; Source: Huawei, HiSilicon; Title: Support of PUCCH on SCell based on dual connectivity mechanism; Document for: Discussion/… [cited by applicant]
R1-150135; 3GPP TSG RAN WG1 Meeting #80; Athens, Greece, Feb. 9-13, 2015; Source: ZTE, Title: Further CA enhancement to support PUCCH on SCell; Agenda Item: 7.2.2.1; Document for: Discussion and Decision. [cited by applicant]
R1-150206; 3GPP TSG RAN WG1 Meeting #80; Athens, Greece, Feb. 9-13, 2015; Agenda Item: 7.2.2.1; Source: LG Electronics; Title: Consideration on the support PUCCH on Scell for CA enhancement; Document for: Discussion and… [cited by applicant]
R1-150291; 3GPP TSG RAN WG1 Meeting #80; Athens, Greece, Feb. 9-13, 2015; Agenda item: 7.2.2.1; Source: NEC; Title: Initial considerations on SCell PUCCH for CA; Document for: Discussion / Decision. [cited by applicant]
R1-150509; 3GPP TSG RAN WG1 Meeting #80; Athens, Greece, Feb. 9-13, 2015; Source: NTT Docomo, Inc.; Title: PUCCH on SCell for UEs supporting UL-CA; Agenda Item: 7.2.2.1; Document for: Discussion and Decision. [cited by applicant]
R1-152564; 3GPP TSG RAN WG1 Meeting #81; Fukuoka, Japan, May 25-29, 2015; Source: CATT; Title: Remaining issues on PUCCH on SCell for Rel-13 CA; Agenda Item: 6.2.2.1; Document for: Discussion/Decision. [cited by applicant]
R1-152461; 3GPP TSG RAN WG1 Meeting #81; Fukuoka, Japan, May 25-29, 2015; Agenda Item: 6.2.2.1; Source: Huawei, HiSilicon; Title: Remaining issues for PUCCH on Scell; Document for: Discussion/Decision. [cited by applicant]
R1-152712; 3GPP TSG RAN WG1 Meeting #81; Fukuoka, Japan, May 25-29, 2015; Agenda Item: 6.2.2.1; Source: LG Electronics; Title: Remaining issues for supporting PUCCH on Scell in Rel-13 CA; Document for: Discussion and de… [cited by applicant]
R1-152950; 3GPP TSG RAN WG1 Meeting #81; Fukuoka, Japan, May 25-29, 2015; Source: ZTE; Title: Remaining aspects of PUCCH on Scell; Agenda Item: 6.2.2.1; Document for: Discussion & Decision. [cited by applicant]
R1-153047; 3GPP TSG RAN WG1 Meeting #81; Fukuoka, Japan, May 25-29, 2015; Source: Sharp; Title: On need of DCI format 3/3A for SCell PUCCH; Agenda Item: 6.2.2.1; Document for: Discussion and Decision. [cited by applicant]
R1-153271; 3GPP TSG RAN WG1 Meeting #81; Fukuoka, Japan, May 25-29, 2015; Source: ITL; Title: Remaining details for supporting PUCCH on Scell; Agenda Item: 6.2.2.1; Document for: Discussion and Decision. [cited by applicant]
R1-153672; 3GPP TSG RAN WG1 Meeting #81; Fukuoka, Japan, May 25-29, 2015; Title: LS on RAN1 agreements on CA Enhancement Beyond 5 Carriers; Release: Rel-13; Work Item: LTE_CA_enh_b5C, Source: TSG RAN WG1. [cited by applicant]
R2-150038; 3GPP TSG RAN WG2 Meeting #89; Athens, Greece, Feb. 9-13, 2015; 3GPP TSG RAN WG1 Meeting #80; R1-150858; Athens, Greece, Feb. 9-13, 2015; Title: LS on RAN1 agreements on PUCCH on SCell for CA; Release: Rel-13;… [cited by applicant]
R1-150085; 3GPP Tsg-Ran WG1 #80; Athens, Greece, Feb. 9-13, 2015; Source: Intel Corporation; Title: Support of PUCCH on Scell for CA; Agenda item: 7.2.2.1; Document for: Discussion and Decision. [cited by applicant]
R1-152622; 3GPP TSG-RAN WG1 #81; Fukuoka, Japan, May 25-29, 2015; Source: Intel Corporation; Title: Remaining issues for PUCCH on SCell; Agenda item: 6.2.2.1; Document for: Discussion and Decision. [cited by applicant]
R1-152664; 3GPP TSG-RAN WG1 Meeting #81; Fukuoka, Japan, May 25-29, 2015; Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell; Title: Remaining aspect PUCCH on SCell; Document for: Discussion & Decision. [cited by applicant]
R1-153296; 3GPP TSG-RAN WG1 Meeting #81; Fukuoka, Japan, May 25-29, 2015; Agenda item: 6.2.2.1; Source: Nokia Networks; Title: Remaining aspects of PUCCH on SCell; Document for: Discussion and Decision. [cited by applicant]
R1-150321; 3GPP TSG-RAN WG1#80; Athens, Greece, Feb. 9-13, 2015; Source: Ericsson; Title: PUCCH on SCell for carrier aggregation; Agenda Item: 7.2.2.1; Document for: Discussion and Decision. [cited by applicant]
R1-153065; 3GPP TSG-RAN WG1#81; Fukuoka, Japan, May 25-29, 2015; Source: Ericsson; Title: Remaining issues of PUCCH on SCell; Agenda Item: 6.2.2.1; Document for: Discussion and Decision. [cited by applicant]
R1-150167; 3GPP TSG-RAN WG2 Meeting #80; Athens, Greece, Feb. 9-13, 2015; Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell; Title: PUCCH on SCell for CA enhancement; Document for: Discussion & Decision. [cited by applicant]
R1-150498; 3GPP TSG-RAN WG1 Meeting #80; Athens, Greece, Feb. 9-13, 2015; Agenda item: 7.2.2.1; Source: Nokia Networks, Nokia Corporation; Title: On necessary mechanisms to support PUCCH on SCell Document for: Discussio… [cited by applicant]