IP Library › Granted Patent US 12,225,438
Granted Patent B2
US 12,225,438 · App. 17/532,868 · Granted Feb 11, 2025

Apparatus and method for supporting one-to-one communication service in wireless communication system

Inventors: Hoyeon Lee (Suwon-si, KR); Sunghoon Kim (Suwon-si, KR); Yoonseon Han (Suwon-si, KR)
Assignee: Samsung Electronics Co., Ltd.
H04W4/40H04W8/22H04W76/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,225,438
App. No.
17/532,868
Granted
Feb 11, 2025
Kind
B2
Abstract

A method, performed by a first user equipment (UE), of performing unicast communication includes transmitting a direct communication request message, generating a profile for a PC5 unicast link, receiving, from a second UE, a response message based on a result of establishment of the PC5 unicast link; and transmitting, to the second UE, a data message over the PC5 unicast link based on the response message, wherein the profile includes at least one of a Layer-2 identifier (ID) of the first UE, an application layer ID of the first UE, a Layer-2 ID of the second UE, an application layer ID of the second UE, PC5 5 th generation (5G) Quality of Service (QoS) Indicator (PQI), or PC5 QoS Flow identifier (PFI) associated with the PQI.

Claims (34)

1. A method for performing unicast communication by a first user equipment (UE), the method comprising:

transmitting a request message for establishing a PC5 unicast link, the request message including information about a PC5 Quality of Service (QoS) Flow;

receiving, from a second UE, a response message for establishing the PC5 unicast link, the response message including including a corresponding information about the PC5 QoS Flow requested by the first UE; and

transmitting, to the second UE, a data over the PC5 unicast link by using a profile for the PC5 unicast link,

wherein the information about PC5 QoS Flow includes a PC5 QoS Flow Identifier (PFI) and a PC5 5 th generation (5G) QoS Indicator (PQI), and

wherein the profile includes at least one of: a Layer-2 identifier (ID) of the first UE, an application layer ID of the first UE, a Layer-2 ID of the second UE, an application layer ID of the second UE, a PC5 5G QoS Indicator (PQI), or a PC5 QoS Flow Identifier (PFI) associated with the PQI.

2. The method of claim 1 ,

wherein the Layer-2 ID of the second UE is used for initial signaling to establish the PC5 unicast link, and

wherein a destination Layer-2 ID of the request message is the Layer-2 ID of the second UE.

3. The method of claim 2 , wherein the destination Layer-2 ID is same or different for Vehicle to Everything (V2X) service types.

4. The method of claim 1 ,

wherein the PFI is assigned in a Vehicle to Everything (V2X) layer of the first UE, and

wherein the V2X layer of the first UE provides at least one of the data, the PFI, or the PQI to an Access Stratum (AS) layer of the first UE.

5. The method of claim 1 , further comprising indicating, from a Vehicle to Everything (V2X) layer to an Access Stratum (AS) layer, whether the request message or the response message is for signaling.

6. The method of claim 1 , further comprising changing at least one of: the Layer-2 ID of the first UE, the Layer-2 ID of the second UE, the application layer ID of the first UE, or the application layer ID of the second UE.

7. The method of claim 6 , further comprising updating the profile based on an update of a link layer identifier or a result of the changing of at least one of: the Layer-2 ID of the first UE, the Layer-2 ID of the second UE, the application layer ID of the first UE, or the application layer ID of the second UE.

8. A first user equipment (UE) for performing unicast communication, the first UE comprising:

a transceiver; and

at least one processor coupled with the transceiver and configured to:

transmit a request message for establishing a PC5 unicast link, the request message including information about a PC5 Quality of Service (QoS) Flow;

receive, from a second UE, a response message for establishing a PC5 unicast link, the response message including a corresponding information about the PC5 QoS Flow requested by the first UE; and

transmit, to the second UE, a data over the PC5 unicast link by using a profile for the PC5 unicast link,

wherein the information about PC5 QoS Flow includes a PC5 QoS Flow Identifier (PFI) and a PC5 5th generation (5G) QoS Indicator (PQI), and

wherein the profile includes at least one of: a Layer-2 identifier (ID) of the first UE, an application layer ID of the first UE, a Layer-2 ID of the second UE, an application layer ID of the second UE, a PC5 5G QoS Indicator (PQI), or a PC5 QoS Flow Identifier (PFI) associated with the PQI.

9. The first UE of claim 8 ,

wherein the Layer-2 ID of the second UE is used for initial signaling to establish the PC5 unicast link, and

wherein a destination Layer-2 ID of the request message is the Layer-2 ID of the second UE.

10. The first UE of claim 9 , wherein the destination Layer-2 ID is same or different for Vehicle to Everything (V2X) service types.

11. The first UE of claim 8 ,

wherein the PFI is assigned in a Vehicle to Everything (V2X) layer of the first UE, and

wherein the V2X layer of the first UE provides at least one of the data, the PFI, or the PQI to an Access Stratum (AS) layer of the first UE.

12. The first UE of claim 8 , wherein the at least one processor is further configured to indicate, from a Vehicle to Everything (V2X) layer to an Access Stratum (AS) layer, whether the request message or the response message is for signaling.

13. The first UE of claim 8 , wherein the at least one processor is further configured to change at least one of: the Layer-2 ID of the first UE, the Layer-2 ID of the second UE, the application layer ID of the first UE, or the application layer ID of the second UE.

14. The first UE of claim 13 , wherein the at least one processor is further configured to update the profile based on an update of a link layer identifier or a result of the changing of at least one of: the Layer-2 ID of the first UE, the Layer-2 ID of the second UE, the application layer ID of the first UE, or the application layer ID of the second UE.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 22, 2021
From: LEE, HOYEON; KIM, SUNGHOON; HAN, YOONSEON
To: SAMSUNG ELECTRONICS CO., LTD
Reel/Frame 058223/0684 →
Priority Claims (1)
KR 10-2019-0037305 · Mar 29, 2019 · national
Continuity (2)
Continuation 16834798 · Mar 30, 2020
Related Publication 20220086610A1 · Mar 17, 2022
References Cited (28)
US 10194459B2 · Kim · 2019 [cited by examiner]
US 11184748B2 · Lee · 2021 [cited by examiner]
US 20180198767A1 · Choi et al. · 2018 [cited by applicant]
US 20180249524A1 · Yi et al. · 2018 [cited by applicant]
US 20200178048A1 · Kim · 2020 [cited by examiner]
US 20200260511A1 · Kim · 2020 [cited by applicant]
US 20200296619A1 · Pan · 2020 [cited by examiner]
CN 108028863A · 2018 [cited by applicant]
CN 108702803A · 2018 [cited by applicant]
WO 2017209005A1 · 2017 [cited by applicant]
WO 2018066876A1 · 2018 [cited by applicant]
WO 2020204530A1 · 2020 [cited by applicant]
International Search Report and Written Opinion of the International Searching Authority in connection with International Application No. PCT/KR2020/004328 dated Jul. 9, 2020, 9 pages. [cited by applicant]
Ericsson, “Update consistently use of V2X communication,” S2-1902604 (rev of 1621 ), 3GPP SA WG2 Meeting #131, Tenerife, Spain, Feb. 25-Mar. 1, 2019, 5 pages. [cited by applicant]
Intel, “Update to V2X Policy and parameters,” S2-1901885 (revision of S2-190xxxx), SA WG2 Temporary Document, SA WG2 Meeting #131, Santa Cruz, Tenerife, Spain, Feb. 25-Mar. 1, 2019, 2 pages. [cited by applicant]
LG Electronics, et al., “TS 23.287 Procedure for PC5 unicast,” S2-1901810 (revision of S2-19xxxxx), SA WG2 Temporary Document, SA WG2 Meeting #131, Santa Cruz, Tenerife, Spain, Feb. 25-Mar. 1, 2019, 5 pages. [cited by applicant]
3GPP TS 23.287 V0.2.0 (Mar. 2019), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Architecture enhancements for 5G System (5GS) to support Vehicle… [cited by applicant]
Supplementary European Search Report dated Feb. 7, 2022, in connection with European Application No. 20782361.8, 7 pages. [cited by applicant]
Qualcomm Incorporated, et al., “TS 23.287: Identifiers for V2X communication over PC5,” S2-1900709 (was S2-1900355), SA WG2 Meeting #130, Kochi, India, Jan. 21-25, 2019, 3 pages. [cited by applicant]
Communication pursuant to Article 94(3) EPC dated Nov. 4, 2022, in connection with European Application No. 20782361.8, 6 pages. [cited by applicant]
Office Action dated Oct. 20, 2023, in connection with Korean Patent Application No. 10-2019-0037305, 125 pages. [cited by applicant]
3GPP TR 23.786 V16.0.0 (Mar. 2019) (Mar. 2019); Technical Report; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on architecture enhancements for the Evolved Packet … [cited by applicant]
Office Action issued Mar. 1, 2024, in connection with Chinese Patent Application No. 202080030576.6, 18 pages. [cited by applicant]
Office Action issued Jan. 15, 2024, in connection with Japanese Patent Application No. 2021-557876, 7 pages. [cited by applicant]
Office Action issued Jun. 3, 2024, in connection with Korean Patent Application No. 10-2019-0037305, 8 pages. [cited by applicant]
Communication under Rule 71(3) EPC dated Jun. 6, 2024, in connection with European Patent Application No. 20782361.8, 60 pages. [cited by applicant]
Lenovo et al., “QoS management for NR V2X”, R2-1901053, Revision of R2-1817118, 3GPP TSG-RAN WG2 Meeting #105, Athens, Greece, Feb. 25-Mar. 1, 2019, 6 pages. [cited by applicant]
Huawei (Rapporteur), “Summary of Email Discussion [104#58][NR V2X]—QoS support for NR V2X”, R2-1900370, 3GPP TSG-RAN WG2 Meeting #105, Athens, Greece, Feb. 25-Mar. 1, 2019, 57 pages. [cited by applicant]