IP Library Granted Patent US 12,232,118
Granted Patent B2
US 12,232,118 · App. 17/266,743 · Granted Feb 18, 2025

Resource determination for communicating uplink control signal in wide bandwidth deployments

Inventors: Kari Hooli (Oulu, FI); Esa Tiirola (Kempele, FI); Timo Lunttila (Espoo, FI); Karol Schober (Helsinki, FI)
Assignee: NOKIA TECHNOLOGIES OY
H04W72/21H04L5/0078H04W72/0453H04W74/0808
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,232,118
App. No.
17/266,743
Granted
Feb 18, 2025
Kind
B2
Abstract

Solutions for determining a resource for transmitting/detecting an uplink (UL) control signal are proposed. For example, a method includes receiving a physical resource configuration and/or an assigned resource indicator for transmitting the UL control signal, wherein the physical resource configuration indicates a plurality of resources in frequency domain. The method also includes determining a resource based on the received physical resource configuration and/or the assigned resource indicator; and adjusting the determined resource for transmitting the UL control signal based on at least one of an outcome of downlink (DL) listen before talk (LBT) performed prior to the transmission of the UL control signal, an outcome of UL LBT performed prior to the transmission of the UL control signal, and a time gap between the UL LBT and the transmission of the UL control signal.

Claims (66)

1. A method for determining a Physical Uplink Control Channel (PUCCH) resource for transmitting an uplink (UL) control signal, the method comprising:

receiving at least one physical resource configuration for transmitting the UL control signal, the physical resource configuration comprising an indication of a plurality of PUCCH resources in a frequency domain;

determining a PUCCH resource based on the received at least one physical resource configuration;

adjusting the determined PUCCH resource for transmitting the UL control signal in response to an UL listen before talk (LBT) failure prior to the transmission of the UL control signal, wherein adjusting the determined PUCCH resource for transmitting the UL control signal is based on an outcome of the UL LBT performed before the transmission of the UL control signal, and a time gap between the UL LBT and the transmission of the UL control signal is longer than a predefined threshold; and

transmitting the UL control signal using the adjusted PUCCH resource.

2. The method according to claim 1 , wherein the physical resource configuration further comprises a primary physical resource block (PRB) allocation, and at least one of a second priority PRB or a sub-band allocation for transmitting the UL control signal.

3. The method according to claim 2 , wherein adjusting the determined PUCCH resource for transmitting the UL control signal comprises:

determining whether at least one physical resource block (PRB) allocation of the determined PUCCH resource is located within an active downlink (DL) sub-band set of a channel occupancy time (COT); and

in response to the at least one PRB allocation of the determined PUCCH resource being located within the active DL sub-band set of the COT, determining to use the at least one PRB allocation of the determined resource for transmitting the UL control signal; or

in response to each PRB allocation of the determined PUCCH resource being located outside of the active DL sub-band set of the COT, determining to drop the UL control signal.

4. The method according to claim 1 , wherein the physical resource configuration further comprises a physical resource block (PRB) allocation, and a validity value indicating a number of active sub-bands in which a resource for the UL control signal is valid.

5. The method according to claim 1 , wherein the method further comprises:

as a preprocessing before the transmission, multiplexing the UL control signal on a candidate PUCCH resource determined based on an outcome of a downlink (DL) LBT or an outcome of a tentative UL LBT performed during a previous time instance; and

wherein adjusting the determined PUCCH resource for transmitting the UL control signal comprises:

performing UL LBT immediately before the transmission of the UL control signal; and

in response to the UL LBT succeeding in the candidate resource, determining the candidate PUCCH resource as the resource for transmitting the UL control signal.

6. The method according to claim 1 , wherein adjusting the determined PUCCH resource comprises:

determining whether the UL LBT succeeds in at least one physical resource block (PRB) allocation of the determined PUCCH resource; and

in response to the UL LBT succeeding in the at least one PRB allocation of the determined PUCCH resource, determining to use the at least one PRB allocation of the determined resource for transmitting the UL control signal; or

in response to the UL LBT failing in each PRB allocation of the determined PUCCH resource, determining to drop the UL control signal.

7. The method according to claim 1 , wherein adjusting the determined PUCCH resource comprises:

determining whether the UL LBT succeeds in at least one physical resource block (PRB) allocation of the determined PUCCH resource; and

in response to the UL LBT succeeding in the at least one PRB allocation of determined PUCCH resource, determining to use the determined PUCCH resource for transmitting the UL control signal; and/or

in response to the UL LBT failing:

determining a set of PUCCH resources from a plurality of PUCCH resources located within an active UL sub-band set of a channel occupancy time and

determining a PUCCH resource for transmitting the UL control signal from the determined set of PUCCH resources by selecting a PUCCH resource with a resource identifier value closest to a resource identifier value of the determined PUCCH resource.

8. The method according to claim 1 , wherein adjusting the determined PUCCH resource comprises:

determining whether the UL LBT succeeds in at least one physical resource block (PRB) allocation of determined PUCCH resource; and

in response to the UL LBT succeeding in the at least one PRB allocation of determined PUCCH resource, determining to use the determined PUCCH resource for transmitting the UL control signal; and/or

in response to the UL LBT failing:

determining valid PUCCH resources from a plurality of PUCCH resources located within an active UL sub-band set of a channel occupancy time,

mapping the valid PUCCH resources to corresponding resource indicators and

determining a PUCCH resource for transmitting the UL control signal based on a resource indicator assigned by a network node.

9. An apparatus for determining a Physical Uplink Control Channel (PUCCH) resource for transmitting an uplink (UL) control signal, the apparatus comprising:

at least one processor; and

at least one memory including computer program code, the at least one memory and the computer program code being configured, with the at least one processor, to cause the apparatus to perform the following:

receive at least one physical resource configuration for transmitting the UL control signal, the physical resource configuration comprising an indication of a plurality of PUCCH resources in a frequency domain;

determine a PUCCH resource based on the received at least one physical resource configuration or the assigned resource indicator;

adjust the determined PUCCH resource for transmitting the UL control signal in response to an UL listen before talk (LBT) failure prior to the transmission of the UL control signal, wherein adjusting the determined PUCCH resource for transmitting the UL control signal is based on an outcome of the UL LBT performed before the transmission of the UL control signal, and a time gap between the UL LBT and the transmission of the UL control signal is longer than a predefined threshold; and

transmit the UL control signal using the adjusted PUCCH resource.

10. The apparatus according to claim 9 , wherein the physical resource configuration further comprises a primary physical resource block (PRB) allocation, and at least one of a second priority PRB or a sub-band allocation for transmitting the UL control signal.

11. The apparatus according to claim 10 , wherein adjusting the determined resource for transmitting the UL control signal comprises:

determining whether at least one physical resource block (PRB) allocation of the determined PUCCH resource is located within an active downlink (DL) sub-band set of a channel occupancy time (COT); and

in response to the at least one PRB allocation of the determined PUCCH resource being located within the active DL sub-band set of the COT, determining to use the at least one PRB allocation of the determined resource for transmitting the UL control signal; or

in response to each PRB allocation of the determined PUCCH resource being located outside of the active DL sub-band set of the COT, determining to drop the UL control signal.

12. The apparatus according to claim 9 , wherein the physical resource configuration further comprises a physical resource block (PRB) allocation, and a validity value indicating a number of active sub-bands in which a resource for the UL control signal is valid.

13. The apparatus according to claim 9 , wherein the at least one memory and the computer program code are further configured, with the at least one processor, to cause the apparatus to perform:

as a preprocessing before the transmission, multiplexing the UL control signal on a candidate PUCCH resource determined based on an outcome of downlink (DL) LBT or an outcome of a tentative UL LBT performed during a previous time instance; and

wherein adjusting the determined PUCCH resource for transmitting the UL control signal comprises:

performing UL LBT immediately before the transmission of the UL control signal; and

in response to the UL LBT succeeding in the candidate resource, determining the candidate PUCCH resource as the resource for transmitting the UL control signal.

14. The apparatus according to claim 9 , wherein adjusting the determined PUCCH resource comprises:

determining whether the UL LBT succeeds in at least one physical resource block (PRB allocation of the determined PUCCH resource; and

in response to the UL LBT succeeding in the at least one PRB allocation of the determined PUCCH resource, determining to use the at least one PRB allocation of the determined resource for transmitting the UL control signal; and

in response to the UL LBT failing in each PRB allocation of the determined PUCCH resource, determining to drop the UL control signal.

15. The apparatus according to claim 9 , wherein adjusting the determined PUCCH resource comprises:

determining whether the UL LBT succeeds in at least one physical resource block (PRB) allocation of the determined PUCCH resource; and

in response to the UL LBT succeeding in the at least one PRB allocation of determined PUCCH resource, determining to use the determined PUCCH resource for transmitting the UL control signal; and/or

in response to the UL LBT failing:

determining a set of PUCCH resources from the plurality of PUCCH resources located within an active UL sub-band set of a channel occupancy time, and

determining a PUCCH resource for transmitting the UL control signal from the determined set of PUCCH resources by selecting a PUCCH resource with a resource identifier value closest to a resource identifier value of the determined PUCCH resource.

16. A computer program product comprising a non-transitory computer-readable storage medium bearing computer program code for determining a Physical Uplink Control Channel (PUCCH) resource for transmitting an uplink (UL) control signal embodied therein, which when executed by at least one processor of a device, causes the device to:

receive at least one physical resource configuration for transmitting the UL control signal, the physical resource configuration comprising an indication of a plurality of PUCCH resources in a frequency domain;

determine a PUCCH resource based on the received at least one physical resource configuration;

adjust the determined PUCCH resource for transmitting the UL control signal in response to an UL listen before talk (LBT) failure prior to the transmission of the UL control signal, wherein the determined PUCCH resource for transmitting the UL control signal is adjusted based on an outcome of the UL LBT performed before the transmission of the UL control signal, and a time gap between the UL LBT and the transmission of the UL control signal is longer than a predefined threshold; and

transmit the UL control signal using the adjusted PUCCH resource.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 26, 2022
From: J. HOOLI, KARI; T. TIIROLA, ESA; E. LUNTTILA, TIMO; SCHOBER, KAROL
To: NOKIA TECHNOLOGIES OY
Reel/Frame 059703/0839 →
Continuity (2)
Provisional Application 62790676 · Jan 10, 2019
Related Publication 20210321392A1 · Oct 14, 2021
References Cited (34)
US 20170289869A1 · Nogami et al. · 2017 [cited by applicant]
US 20180027589A1 · Yang · 2018 [cited by applicant]
US 20180124749A1 · Park et al. · 2018 [cited by applicant]
US 20180359072A1 · Tiirola et al. · 2018 [cited by applicant]
US 20190132834A1 · Yan · 2019 [cited by examiner]
US 20190349815A1 · Tiirola et al. · 2019 [cited by applicant]
US 20200008229A1 · Li et al. · 2020 [cited by applicant]
US 20200045733A1 · Tiirola et al. · 2020 [cited by applicant]
US 20200329447A1 · Siomina · 2020 [cited by examiner]
US 20210328728A1 · El Hamss · 2021 [cited by examiner]
CN 105898770A · 2016 [cited by applicant]
CN 108574987A · 2018 [cited by applicant]
WO WO2020068251A1 · 2019 [cited by examiner]
WO 2019219155A1 · 2019 [cited by applicant]
“Revised SID on NR-based Access to Unlicensed Spectrum”, 3GPP TSG RAN Meeting #80, RP-181339, Agenda: 9.4.3, Qualcomm Incorporated, Jun. 11-14, 2018, 5 pages. [cited by applicant]
“Potential Solutions and Techniques for NR Unlicensed”, 3GPP TSG RAN Meeting #80, R1-1802526, Agenda: 7.6.4, Nokia, Feb. 26-Mar. 2, 2018, 10 pages. [cited by applicant]
“CR on Updating Requirement for BWP Switching Delay in TS38.133 (Section 8.6)”, 3GPP TSG-RAN WG4 Meeting #88b, R4-1814069, Mediatek Inc., Oct. 8-12, 2018, 2 pages. [cited by applicant]
“Feature Lead Summary of HARQ Enhancement in NR-U”, 3GPP TSG RAN WG1 Meeting #95, R1-1814146, Agenda Item: 7.2.2.4.3, Huawei, Nov. 12-16, 2018, 15 pages. [cited by applicant]
Lagen et al., “New Radio Beam-Based Access to Unlicensed Spectrum: Design Challenges and Solutions”, arXiv, Sep. 27, 2018, 18 pages. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on NR-based access to unlicensed spectrum (Release 16)”, 3GPP TR 38.889 V16.0.0, Dec. 2018, pp. 1-119. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on Licensed-Assisted Access to Unlicensed Spectrum; (Release 13)”, 3GPP TR 36.889 V13.0.0, Jun. 2015, 285 pages. [cited by applicant]
International Search Report and Written Opinion received for corresponding Patent Cooperation Treaty Application No. PCT/FI2020/050003, dated Mar. 20, 2020, 18 pages. [cited by applicant]
“Physical Layer Design of UL Signals and Channels for NR Unlicensed Operation”, 3GPP TSG RAN WG1 Meeting #95 , R1-1812559, Agenda: 7.2.2.3.2, LG Electronics, Nov. 12-16, 2018, 11 pages. [cited by applicant]
“UL PHY Channels for NR Unlicensed”, 3GPP TSG RAN WG1 Meeting #95, R1-1812193, Agenda: 7.2.2.3.2, Huawei, Nov. 12-16, 2018, 22 pages. [cited by applicant]
Extended European Search Report received for corresponding European Patent Application No. 20738415.7, dated Mar. 11, 2022, 10 pages. [cited by applicant]
“HARQ enhancements in NR unlicensed”, 3GPP TSG RAN WG1 Meeting #94, R1-1808063, Agenda: 7.2.2.4.3, Huawei, Aug. 20-24, 2018, 8 pages. [cited by applicant]
Ericsson, “Corrections to Handling of SL Unknown Protocol Data”, 3GPP TSG- RAN WG2 #103, Change Request CR 1343, R1-1812358, (Aug. 20-24, 2018), 2 pages. [cited by applicant]
Huawei et al., “HARQ Enhancements in NR Unlicensed”, 3GPP TSG RAN WG1 Meeting #95, R1-1812196, (Nov. 12-16, 2018), 13 pages. [cited by applicant]
Office Action for Chinese Application No. 202080005426.X dated Oct. 28, 2023, 15 pages. [cited by applicant]
Office Action for Indonesian Application No. P00202104595 dated Feb. 7, 2024, 6 pages. [cited by applicant]
Qualcomm Incorporated, “Views on NR for Bands in 6-24GHz Range”, 3GPP TSG RAN Meeting 82, RP-182398, (Dec. 10-13, 2018), 121 pages. [cited by applicant]
Office Action for European Application No. 20738415.7 dated Apr. 25, 2024, 6 pages. [cited by applicant]
Office Action for Chinese Application No. 202080005426.X dated Apr. 19, 2024, 11 pages. [cited by applicant]
Office Action for Indonesian Application No. P00202104595 dated Oct. 25, 2024, 6 pages. [cited by applicant]