IP Library Granted Patent US 12,359,754
Granted Patent B2
US 12,359,754 · App. 18/590,254 · Granted Jul 15, 2025

Sliding connector spool

Inventor: Alagarsamy Sundararajan (Sugarland, TX)
Assignee: SRI ENERGY, INC.
F16L23/024E21B34/025F16L19/005F16L19/025F16L23/0286
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,359,754
App. No.
18/590,254
Granted
Jul 15, 2025
Kind
B2
Abstract

An embodiment includes a spool that may expand and contract to ease removal and addition of components to an oilfield manifold.

Claims (47)

1. A method comprising:

accessing a spool for oilfield manifolds, the spool comprising: (1) a first conduit; (2) a second conduit including threads; (3) a third conduit coupled to the first and second conduits; and (4) a fourth conduit, the fourth conduit including threads that engage the threads of the second conduit;

coupling the first conduit to a first flange via a first ring joint gasket;

coupling the second conduit to a second flange via a second ring joint gasket;

wherein rotating the fourth conduit about an axis in a first rotational direction moves the second conduit linearly along the axis in a first linear direction; and

wherein rotating the fourth conduit about the axis in a second rotational direction moves the second conduit linearly along the axis in a second linear direction;

wherein the first, second, and third conduits collectively form a channel that couples first and second opposing ends of the spool to one another and which includes the axis;

wherein the first and second rotational directions are opposite of each other and the first and second linear directions are opposite of each other.

2. The method of claim 1 comprising:

rotating the fourth conduit about the axis in the first rotational direction to move the second conduit linearly along the axis in the first linear direction; and

shortening an overall length of the spool in response to rotating the fourth conduit about the axis in the first rotational direction.

3. The method of claim 2 comprising removing the spool from a manifold in response to shortening the overall length of the spool.

4. The method of claim 3 , wherein the removing the spool from the manifold is performed without altering a physical location of the first flange and without altering a physical location of the second flange.

5. The method of claim 4 comprising adding the spool to the manifold or an additional manifold in response to lengthening the overall length of the spool.

6. The method of claim 5 comprising adding the spool to the manifold without altering the physical location of the first flange and without altering the physical location of the second flange.

7. The method of claim 2 comprising:

rotating the fourth conduit about the axis in the second rotational direction to move the second conduit linearly along the axis in the second linear direction; and

lengthening the overall length of the spool in response to rotating the fourth conduit about the axis in the second rotational direction.

8. The method of claim 1 comprising:

rotating the fourth conduit about the axis in the second rotational direction to move the second conduit linearly along the axis in the second linear direction; and

lengthening an overall length of the spool in response to rotating the fourth conduit about the axis in the second rotational direction.

9. The method of claim 8 comprising adding the spool to a manifold in response to lengthening the overall length of the spool.

10. The method of claim 9 , wherein the adding the spool to the manifold is performed without altering a physical location of the first flange and without altering a physical location of the second flange.

11. The method of claim 1 , wherein:

in a first orientation the spool is at its minimum length;

in a second orientation the spool is at its maximum length;

in a third orientation the spool has an intermediate length between the minimum length and the maximum length.

12. The method of claim 11 comprising operating the spool and passing fluid through the channel while the spool is in the third orientation.

13. The method of claim 1 , wherein the first flange is part of a choke.

14. The method of claim 1 , wherein the channel is oriented vertically with respect to a horizontal earth surface.

15. A method comprising:

accessing a spool for oilfield manifolds, the spool comprising: (1) a first conduit; (2) a second conduit including threads; (3) a third conduit coupled to the first and second conduits; and (4) a fourth conduit, the fourth conduit including threads that engage the threads of the second conduit;

coupling the first conduit to a first flange;

coupling the second conduit to a second flange;

wherein rotating the fourth conduit about an axis in a first rotational direction moves the second conduit linearly along the axis in a first linear direction; and

wherein rotating the fourth conduit about the axis in a second rotational direction moves the second conduit linearly along the axis in a second linear direction;

wherein the first, second, and third conduits collectively form a channel that couples first and second opposing ends of the spool to one another and which includes the axis;

wherein the first and second rotational directions are opposite of each other and the first and second linear directions are opposite of each other.

16. The method of claim 15 comprising:

rotating the fourth conduit about the axis in the first rotational direction to move the second conduit linearly along the axis in the first linear direction; and

shortening an overall length of the spool in response to rotating the fourth conduit about the axis in the first rotational direction.

17. The method of claim 16 comprising removing the spool from a manifold in response to shortening the overall length of the spool.

18. The method of claim 17 , wherein the removing the spool from the manifold is performed without altering a physical location of the first flange and without altering a physical location of the second flange.

19. The method of claim 15 comprising:

rotating the fourth conduit about the axis in the second rotational direction to move the second conduit linearly along the axis in the second linear direction; and

lengthening an overall length of the spool in response to rotating the fourth conduit about the axis in the second rotational direction.

20. The method of claim 19 comprising adding the spool to a manifold: (a) in response to lengthening the overall length of the spool, and (b) without altering a physical location of the first flange and without altering a physical location of the second flange.

Continuity (3)
Continuation 18307903 · Apr 27, 2023
Provisional Application 63335262 · Apr 27, 2022
Related Publication 20240200700A1 · Jun 20, 2024
References Cited (57)
US 323834A · Turner · 1885 [cited by examiner]
US 1334007A · White · 1920 [cited by applicant]
US 1573511A · Claude · 1926 [cited by applicant]
US 2448232A · Muse · 1948 [cited by applicant]
US 3427051A · White et al. · 1969 [cited by applicant]
US 3647245A · Hanes et al. · 1972 [cited by applicant]
US 3664690A · Williams et al. · 1972 [cited by applicant]
US 3807777A · Larkin · 1974 [cited by applicant]
US 3889985A · Gartmann · 1975 [cited by applicant]
US 4219226A · Kappenhagen · 1980 [cited by applicant]
US 4570673A · Kendrick et al. · 1986 [cited by applicant]
US 4603887A · Mayfield et al. · 1986 [cited by applicant]
US 4659114A · Gerber · 1987 [cited by applicant]
US 4720124A · Taylor et al. · 1988 [cited by applicant]
US 4932686A · Anderson, Jr. · 1990 [cited by applicant]
US 5404912A · Hausler et al. · 1995 [cited by applicant]
US 5853113A · Small et al. · 1998 [cited by applicant]
US 6471249B1 · Lewis · 2002 [cited by applicant]
US 6557905B2 · Mack · 2003 [cited by examiner]
US 6718997B2 · Biszko · 2004 [cited by applicant]
US 6832790B2 · Olson · 2004 [cited by examiner]
US 8079622B2 · Maier · 2011 [cited by applicant]
US 8157006B2 · Koleilat et al. · 2012 [cited by applicant]
US 8696039B2 · Guidry · 2014 [cited by examiner]
US 8857863B1 · Patin et al. · 2014 [cited by applicant]
US 8978763B2 · Guidry · 2015 [cited by examiner]
US 9267615B1 · Corte, Jr. et al. · 2016 [cited by applicant]
US 9765912B2 · Spears et al. · 2017 [cited by applicant]
US 9932800B2 · Guidry · 2018 [cited by applicant]
US 10132146B2 · Guidry · 2018 [cited by applicant]
US 10562001B2 · Lattanzio et al. · 2020 [cited by applicant]
US 10801294B2 · Jespersen et al. · 2020 [cited by applicant]
US 10995561B1 · Travix et al. · 2021 [cited by applicant]
US 11105175B2 · Chirko et al. · 2021 [cited by applicant]
US 11131393B2 · Sundararajan · 2021 [cited by applicant]
US 11193349B1 · Dille et al. · 2021 [cited by applicant]
US 11214455B2 · McGuire et al. · 2022 [cited by applicant]
US 11333030B2 · Guevel · 2022 [cited by applicant]
US 11454100B1 · Choate · 2022 [cited by applicant]
US 20060267342A1 · Boyd · 2006 [cited by applicant]
US 20080309068A1 · Hall · 2008 [cited by examiner]
US 20090261575A1 · Bull et al. · 2009 [cited by applicant]
US 20210238006A1 · Moseley et al. · 2021 [cited by applicant]
US 20210239241A1 · Mullins et al. · 2021 [cited by applicant]
US 20210285580A1 · Travis · 2021 [cited by applicant]
US 20210301953A1 · Crawford · 2021 [cited by applicant]
WO 2008100059A1 · 2008 [cited by applicant]
WO 2009091725A1 · 2009 [cited by applicant]
WO 2015152729A1 · 2015 [cited by applicant]
WO 2018157270A1 · 2018 [cited by applicant]
WO 2019127591A1 · 2019 [cited by applicant]
“Seismic Pipe & Fittings”, U.S. Pipe, retrieved from uspipe.com, 2020, 22 pages. [cited by applicant]
“Rotating Swivel Spool”, Heshka Oil, retrieved from heshkaoil.com, 2020, 4 pages. [cited by applicant]
“Adjustable-Length Pipe Couplings—vonRoll hydro”, 2020, 13 pages. [cited by applicant]
Choi et al., “Expansion Spool Design of an Offshore Pipeline by the Slope Deflection Method”, Journal of Ocean Engineering and Technology 24.5 (2010): 1-7. [cited by applicant]
Patent Cooperation Treaty, International Search Report and Written Opinion dated Aug. 25, 2023 in International Application No. PCT/US2023/020107 (10 pages). [cited by applicant]
European Patent Office, Communication Pursuant to Rules 161(2) and 162 EPC dated Aug. 29, 2024 in European Patent Application No. 23797246.8 (3 pages). [cited by applicant]