IP Library › Granted Patent US 12,421,144
Granted Patent B1
US 12,421,144 · App. 19/171,379 · Granted Sep 23, 2025

Method for predicting aeration quantity required to maintain stable dissolved oxygen concentration in activated sludge system

Inventors: Lin Ye (Jiangsu, CN); Ruoxuan Bian (Jiangsu, CN); Yiheng Qiao (Jiangsu, CN); Zirui Yin (Jiangsu, CN); Xuxiang Zhang (Jiangsu, CN)
Assignee: NANJING UNIVERSITY
C02F3/12C02F3/006C02F2209/005C02F2209/14C02F2209/225C02F2209/38C02F2209/40
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,421,144
App. No.
19/171,379
Granted
Sep 23, 2025
Kind
B1
Abstract

Disclosed is a method for predicting aeration quantity required to maintain a stable dissolved oxygen concentration in an activated sludge system, including measuring operating parameters of a biochemical tank of a wastewater treatment plant at intervals of a t 1 time period over a certain period of time; replacing the DO concentration data with DO concentration data after a t 2 time period from the time of measurement; filtering the DO concentration data after being replaced to form a dataset; building a random forest model, and building a machine learning matrix using data in the dataset to train the random forest model; evaluating prediction performance of the trained random forest model; and using the trained random forest model to predict an aeration airflow rate required to achieve the target DO concentration value after the t 2 time period, thereby adjusting an aeration airflow rate.

Claims (66)

1. A method for predicting aeration quantity required to maintain a stable dissolved oxygen concentration in an activated sludge system, comprising the following steps:

step 1: measuring and recording influent flow rate, influent organic matter concentration, influent ammonia nitrogen concentration, dissolved oxygen (DO) concentration in the activated sludge system, sludge concentration, and aeration airflow rate in a biochemical tank of a wastewater treatment plant at intervals of a t 1 time period over a certain period of time, wherein the sludge concentration is suspended solid concentration in the activated sludge system;

step 2: in view of lag effect in changes in the DO concentration in the activated sludge system, replacing the DO concentration data recorded at a time of measurement in the step 1 with DO concentration data after a t 2 time period from the time of measurement;

step 3: filtering the DO concentration data after being replaced in the step 2, deleting the data that falls outside a normal range of DO concentration, and forming a dataset by combining the filtered DO concentration data with the influent flow rate, the influent organic matter concentration, the influent ammonia nitrogen concentration, the DO concentration in the activated sludge system, the sludge concentration, and the aeration airflow rate measured in the step 1;

step 4: building a random forest model, building a machine learning matrix using data in the dataset, dividing the machine learning matrix into a training set and a test set, training the random forest model, and evaluating prediction performance of the random forest model; and

step 5: taking a preset DO concentration required to be reached after the t 2 time period at a current time as a target DO concentration value, inputting the target DO concentration value and influent flow rate, influent organic matter concentration, influent ammonia nitrogen concentration, and sludge concentration measured at the current time into the trained random forest model to predict an aeration airflow rate required to achieve the target DO concentration value, and adjusting an aeration airflow rate of an aeration blower according to the aeration airflow rate;

wherein the machine learning matrix in the step 4 is expressed as follows:

[

FL

1

COD

1

intFL

1

N

1

DO

t

-

1

SS

1

FL

2

COD

2

intFL

2

N

2

DO

t

-

2

SS

2

⋮

⋮

⋮

⋮

⋮

⋮

FL

m

COD

m

intFL

m

N

m

DO

t

-

m

SS

m

]

,

in the matrix, FL 1 -FL m are data of aeration airflow rate, COD 1 -COD m are data of influent chemical oxygen demand, intFL 1 -intFL m are data of influent flow rate, N 1 -N m are data of influent ammonia nitrogen concentration, DO t-1 -DO t-m are DO concentration data in the activated sludge system, SS 1 -SS m are data of sludge concentration, and m denotes a total number of records taken at intervals of a t 1 time period over a certain period of time;

a method for evaluating prediction performance in the step 4 is as follows: using an error between a predicted value and a measured value to characterize the prediction performance of the random forest model by calculating mean absolute percentage error (MAPE) and coefficient of determination (R 2 ) of the trained random forest model on the test set; and when R 2 is greater than 0.8 and MAPE is less than 20%, the random forest model is considered to have good prediction performance, otherwise, the DO concentration data in the dataset needs to be further replaced;

a method for further replacing the DO concentration data in the dataset is as follows: adjusting values of the t 2 time period and the normal range of DO concentration, replacing the DO concentration data at a time of measurement in the dataset with DO concentration data after an adjusted t 2 time period from the time of measurement, and using the dataset to build a machine learning matrix again, so as to train the random forest model again to have the good prediction performance;

the adjusted t 2 time period represents lag feedback time for the changes in the DO concentration in the activated sludge system, and a value range thereof is 5-30 min and is an integer multiple of the t 1 time period; and

in the step 5, the aeration airflow rate of the aeration blower is adjusted in advance to reach the required aeration airflow rate predicted by the trained random forest model, under a condition that a directly monitored value of DO concentration in the activated sludge system exhibits significant fluctuations or is about to exceed a normal range of a target value, such that the DO concentration after the t 2 time period reaches the target value.

2. The method for predicting aeration quantity required to maintain a stable dissolved oxygen concentration in an activated sludge system according to claim 1 , wherein the t 2 time period in the step 2 represents lag feedback time for the changes in the DO concentration in the activated sludge system, and is an integer multiple of the t 1 time period.

3. The method for predicting aeration quantity required to maintain a stable dissolved oxygen concentration in an activated sludge system according to claim 1 , wherein the normal range of DO concentration in the step 3 is usually 2.0-3.0 mg/L.

4. The method for predicting aeration quantity required to maintain a stable dissolved oxygen concentration in an activated sludge system according to claim 1 , wherein the DO concentration is considered to be in a stable state when the directly monitored value of DO concentration in the activated sludge system in the step 5 falls within a range of ±0.5 mg/L of the target value; and when the DO concentration exceeds the range, the aeration airflow rate of the aeration blower is adjusted in advance to reach the required aeration airflow rate predicted by the trained random forest model.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 10, 2025
From: YE, LIN; BIAN, RUOXUAN; QIAO, YIHENG; YIN, ZIRUI; ZHANG, XUXIANG
To: NANJING UNIVERSITY
Reel/Frame 070792/0353 →
Priority Claims (1)
CN 202410644303.0 · May 23, 2024 · national
References Cited (7)
CN 111680449 · 2020 [cited by applicant]
CN 114314823 · 2022 [cited by applicant]
CN 117509882A · 2024 [cited by examiner]
JP 2020114570 · 2020 [cited by applicant]
Yu et al., English machine translation CN 114314823, pp. 1-16 (Year: 2022). [cited by examiner]
Chen et al., English machine translation CN 117509882, pp. 1-9 (Year: 2024). [cited by examiner]
“Office Action of China Counterpart Application”, issued on Nov. 21, 2024, with English translation thereof, p. 1-p13. [cited by applicant]