IP Library › Granted Patent US 12,428,913
Granted Patent B1
US 12,428,913 · App. 18/616,716 · Granted Sep 30, 2025

Systems and methods for conformance control of a wellbore

Inventors: Xingang Bu (Beijing, CN); Abdulkareem AlSofi (Beijing, CN); Tianping Huang (Beijing, CN); Mohammed B. AlOtaibi (Dhahran, SA)
Assignee: Saudi Arabian Oil Company
E21B7/18E21B43/16E21B49/008
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,428,913
App. No.
18/616,716
Granted
Sep 30, 2025
Kind
B1
Abstract

A conformance control method includes identifying a target location of a wellbore formed from a terranean surface to two subterranean formations that include a high permeability formation having a first permeability and a low permeability formation having a second permeability that is equal or less than one-third of the first permeability. The method includes forming a first plurality of tunnels in the high permeability formation from the wellbore; injecting, into the high permeability formation and the low permeability formation, a chemical fluid from the wellbore through the first plurality of tunnels; expanding a sweep area of the injected chemical fluid by injecting the chemical fluid into the high permeability formation through the first plurality of tunnels; forming a second plurality of tunnels in the low permeability formation from the wellbore; and increasing a contact area of an injection fluid in the low permeability formation with the second plurality of tunnels.

Claims (33)

1. A conformance control method, comprising:

identifying a target location of a wellbore formed from a terranean surface to at least two subterranean formations, the at least two subterranean formations comprising a high permeability formation having a first permeability and a low permeability formation having a second permeability that is equal or less than one-third of the first permeability;

forming, with a radial jet drilling assembly, a first plurality of tunnels in the high permeability formation from the wellbore;

injecting, into the high permeability formation, a chemical fluid from the wellbore through the first plurality of tunnels;

expanding a sweep area of the injected chemical fluid by injecting the chemical fluid into the high permeability formation through the first plurality of tunnels;

forming, with the radial jet drilling assembly, a second plurality of tunnels in the low permeability formation from the wellbore subsequent to injecting the chemical fluid from the wellbore, through the first plurality of tunnels, and into the high permeability formation; and

increasing a contact area of an injection fluid in the low permeability formation with the second plurality of tunnels.

2. The conformance control method of claim 1 , wherein each of the first plurality of tunnels is 1-2 inches in diameter and between 100 and 700 feet in length from the wellbore, and each of the second plurality of tunnels is 1-2 inches in diameter and between 100 and 700 feet in length from the wellbore.

3. The conformance control method of claim 1 , wherein the chemical fluid comprises a gel.

4. The conformance control method of claim 3 , wherein the chemical fluid comprises swellable particles.

5. The conformance control method of claim 1 , comprising logging the wellbore.

6. The conformance control method of claim 5 , comprising identifying the target location based at least in part on a log of the wellbore generated by the logging.

7. The conformance control method of claim 1 , comprising injecting the injection fluid into the wellbore subsequent to forming the second plurality of tunnels in the low permeability formation.

8. The conformance control method of claim 1 , wherein the first plurality of tunnels comprises between 2 and 8 tunnels, and the second plurality of tunnels comprises between 2 and 8 tunnels.

9. The conformance control method of claim 1 , wherein a volume of the injected chemical fluid comprises between 0.02 and 0.10 pore volume of the high permeability formation.

10. The conformance control method of claim 1 , comprising isolating, with a temporary zonal isolation device, the low permeability formation from the wellbore prior to injecting the chemical fluid from the wellbore through the first plurality of tunnels.

11. A well system, comprising:

a wellbore formed from a terranean surface to a target location comprising at least two subterranean formations, the at least two subterranean formations comprising a high permeability formation having a first permeability and a low permeability formation having a second permeability that is equal or less than one-third of the first permeability;

a radial jet drilling assembly configured to perform operations comprising:

forming a first plurality of tunnels in the high permeability formation from the wellbore; and

subsequent to an injection of a chemical fluid into the high permeability formation from the first plurality of tunnels, forming a second plurality of tunnels in the low permeability formation from the wellbore; and

a fluid injection system configured to inject the chemical fluid into the high permeability formation from the wellbore through the first plurality of tunnels, wherein

a sweep area of the injected chemical fluid is expanded by injecting the chemical fluid into the high permeability formation through the first plurality of tunnels, and

a contact area of an injection fluid is increased in the low permeability formation with the second plurality of tunnels.

12. The well system of claim 11 , wherein each of the first plurality of tunnels is 1-2 inches in diameter and between 100 and 700 feet in length from the wellbore, and each of the second plurality of tunnels is 1-2 inches in diameter and between 100 and 700 feet in length from the wellbore.

13. The well system of claim 11 , wherein the chemical fluid comprises a gel.

14. The well system of claim 13 , wherein the chemical fluid comprises swellable particles.

15. The well system of claim 11 , comprising a logging system configured to perform injection profile logging of the wellbore.

16. The well system of claim 15 , wherein the target location is identified based at least in part on a log of the wellbore generated by the logging system.

17. The well system of claim 11 , wherein the fluid injection system is configured to inject an injection fluid into the wellbore subsequent to the formation of the second plurality of tunnels in the low permeability formation.

18. The well system of claim 11 , wherein the first plurality of tunnels comprises between 2 and 8 tunnels, and the second plurality of tunnels comprises between 2 and 8 tunnels.

19. The well system of claim 11 , wherein a volume of the injected chemical fluid comprises between 0.02 and 0.10 pore volume of the high permeability formation.

20. The well system of claim 11 , comprising a temporary zonal isolation device positioned in the wellbore to fluidly isolate the low permeability formation from the wellbore prior to injection of the chemical fluid from the wellbore through the first plurality of tunnels.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 6, 2024
From: ARAMCO FAR EAST (BEIJING) BUSINESS SERVICES CO. LTD.
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 067317/0648 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 10, 2024
From: BU, XINGANG; ALSOFI, ABDULKAREEM; HUANG, TIANPING
To: ARAMCO FAR EAST (BEIJING) BUSINESS SERVICES CO. LTD.
Reel/Frame 067065/0842 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 10, 2024
From: ALOTAIBI, MOHAMMED B.
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 067065/0967 →
References Cited (47)
US 3297088A · Huitt · 1967 [cited by examiner]
US 3682245A · Argabright · 1972 [cited by examiner]
US 3815681A · Richardson · 1974 [cited by examiner]
US 4141415A · Wu · 1979 [cited by examiner]
US 4232741A · Richardson · 1980 [cited by examiner]
US 4287951A · Sydansk · 1981 [cited by examiner]
US 4804043A · Shu · 1989 [cited by examiner]
US 4842070A · Sharp · 1989 [cited by examiner]
US 5316082A · Jennings, Jr. · 1994 [cited by examiner]
US 5915477A · Stuebinger · 1999 [cited by examiner]
US 5934390A · Uthe · 1999 [cited by applicant]
US 8104535B2 · Sierra · 2012 [cited by examiner]
US 8256537B2 · Adam · 2012 [cited by applicant]
US 8657005B2 · Entchev · 2014 [cited by examiner]
US 9121271B2 · Shook · 2015 [cited by examiner]
US 9617839B2 · Modavi · 2017 [cited by examiner]
US 9915123B2 · Bennetzen · 2018 [cited by examiner]
US 10246981B2 · Li · 2019 [cited by examiner]
US 10927290B2 · Han · 2021 [cited by examiner]
US 11578572B2 · AlYousif · 2023 [cited by examiner]
US 11920446B2 · Al-Qasim · 2024 [cited by examiner]
US 11952532B2 · Kaidar · 2024 [cited by examiner]
US 20080156496A1 · East · 2008 [cited by examiner]
US 20110042083A1 · Sierra · 2011 [cited by examiner]
US 20110220359A1 · Soliman · 2011 [cited by examiner]
US 20110265994A1 · Entchev · 2011 [cited by examiner]
US 20110320128A1 · Shook · 2011 [cited by examiner]
US 20150345267A1 · Modavi · 2015 [cited by examiner]
US 20160186041A1 · Bennetzen · 2016 [cited by examiner]
US 20170081583A1 · Han · 2017 [cited by examiner]
US 20180087362A1 · Li · 2018 [cited by examiner]
US 20180308034A1 · Madasu · 2018 [cited by examiner]
US 20210380866A1 · Kaidar · 2021 [cited by examiner]
US 20220154563A1 · AlYousif · 2022 [cited by examiner]
US 20230184072A1 · Al-Qasim · 2023 [cited by examiner]
DK 201570163A1 · 2015 [cited by examiner]
EP 2333026A1 · 2011 [cited by examiner]
Ashena et al., “Well Productivity Improvement Using Radial Jet Drilling,” Prepared for presentation at the SPE International Conference and Exhibition on Formation Damage Control held in Lafayette, Louisiana, USA, Feb. … [cited by applicant]
Azari et al., “Review of Reservoir Engineering Aspects of Conformance Control Technology,” Presented at the Permian Basin Oil and Gas Recovery Conference, Midland, Texas, Mar. 1996, 16 pages. [cited by applicant]
Balch et al., “Field Testing and Validation of a Mechanical Alternative to Radial Jet Drilling for Improving Recovery in Mature Oil Wells,” Prepared for presentation at the SPE Western Regional Meeting held in Anchorage… [cited by applicant]
Dickinson et al., “Coiled-Tubing Radials Placed by Water-Jet Drilling: Field Results, Theory, and Practice,” Prepared for presentation at the 68th Annual Technical Conference and Exhibition of the Society of Petroleum E… [cited by applicant]
Huang et al., “Review of Radial Jet Drilling and the key issues to be applied in new geo-energy exploitation,” 10th International Conference on Applied Energy, Aug. 22-25, 2018, 6 pages. [cited by applicant]
Kamel, “Radial Jet Drilling: A Technical Review,” Prepared for presentation at the SPE Middle East Oil & Gas Show and Conference held in Manama, Kingdom of Bahrain, Mar. 6-9, 2017, 13 pages. [cited by applicant]
Kamel, “RJD: A Cost Effective Frackless Solution For Production Enhancement In Marginal Fields,” International Journal of Scientific & Technology Research, Feb. 2017, 6(2):190-196, 7 pages. [cited by applicant]
Liu et al., “Applied Technologies and Prospects of Conformance Control Treatments in China,” Oil & Gas Science and Technology—Rev. IFP Energies nouvelles, 2010, 65(6):859-877, 21 pages. [cited by applicant]
Nagar et al., “Radial Jet Drilling Improves Injectivity & Conformance in High Permeability Layered Sandstone Reservoir Across Mangala, Bhagyam & Aishwarya Onshore Fields in India,” Prepared for presentation at the SPE A… [cited by applicant]
Seright et al., “Water shutoff and conformance improvement: an introduction,” Petroleum Science, Feb. 4, 2021, 18:450-478, 29 pages. [cited by applicant]