IP Library Granted Patent US 12,464,369
Granted Patent B2
US 12,464,369 · App. 17/997,637 · Granted Nov 4, 2025

Adaptively configuring guard bands of a communications channel of a user equipment

Inventors: Esa Tapani Tiirola (Oulu, FI); Timo Erkki Lunttila (Espoo, FI); Karol Schober (Helsinki, FI)
Assignee: Nokia Technologies Oy
H04W16/14H04L5/0053H04W72/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,464,369
App. No.
17/997,637
Granted
Nov 4, 2025
Kind
B2
Abstract

A method of operating a user equipment (UE), the UE being included in a communications network, the communications network further including a base station, includes determining, by the UE, a wide channel; determining, by the UE, at least one sub-channel within the wide channel, a channel bandwidth (BW) of the at least one sub-channel being a first BW (S 210 ); receiving a configuration of at least one DL or UL carrier, a channel BW of the at least one carrier being a second BW (S 220 ); determining a first and last usable physical resource block (PRB) of the at least one sub-channel based on the first BW and the second BW (S 230 , S 240 ); and performing at least one of transmitting data to, or receiving data from, the base station via the at least one DL carrier or UL carrier, using the at least one sub-channel.

Claims (57)

1 . A user equipment (UE) comprising:

a processor; and

memory storing computer-executable instructions that, when executed by the processor, causes the UE to at least:

determine a wide channel;

determine at least one sub-channel within the wide channel, a channel bandwidth (BW) of the at least one sub-channel being a first BW;

receive a configuration of at least one downlink (DL) or uplink (UL) carrier, a channel BW of the at least one carrier being a second BW;

determine a first and last usable physical resource block (PRBs) of the at least one sub-channel based on the first BW and the second BW by

setting first and last useable PRBs of the at least one sub-channel based on a first pair of guard bands (GBs), if a size of the second BW is equal to a size of the first BW, and

setting the first and last useable PRBs of the at least one sub-channel based on a second pair of GBs, if the size of a second BW is less than the size of the first BW, a size of a total bandwidth of the second pair of GBs being greater than a size of a total bandwidth of the first pair of GBs; and

perform at least one of transmitting data to, or receiving data from, a network element via the at least one DL carrier or UL carrier.

2 . The UE of claim 1 , wherein a size of a BW of the wide channel is 2.16 GHz.

3 . The UE of claim 1 , wherein the size of the first BW is n*432 MHz, wherein n is an integer ≥1.

4 . The UE of claim 1 , wherein a total number of sub-channels included in the wide channel is five.

5 . The UE of claim 1 , wherein the size of the second BW is at least one of 100 MHz and n*400 MHz wherein n is an integer ≥1.

6 . The UE of claim 1 , wherein the UE further caused to:

obtain a third pair of guard bands (GBs) and determine a maximum number of PRBs of the at least one DL or UL carrier based on the third pair of guard bands.

7 . The UE of claim 1 , wherein the second BW is n*432 MHz or n*400 MHZ, wherein n is an integer ≥1, and the at least one carrier occupies at maximum n adjacent sub-channels.

8 . The UE of claim 7 , wherein the UE supports at least two contiguous carriers and each carrier is confined within n adjacent sub-channels.

9 . The UE of claim 1 , wherein the UE is capable of operating according to both the first pair and the second pair of GBs, and wherein the UE further caused to:

perform an initial access according to the second pair of GBs; and

subsequent to the initial access, receive a radio resource control message from the base station to start operating according to the first pair of GBs.

10 . The UE of claim 1 , wherein the UE is capable of operating according to only the second pair of GBs, and wherein the UE further caused to:

determine the first usable PRB based on a received system information block broadcast.

11 . A base station comprising:

a processor; and

memory storing computer-executable instructions that, when executed by the processor, cause the base station:

configure at least a first sub-channel, from among sub-channels of a wide channel, with a first channel configuration for at least one of transmitting downlink (DL) data to, or receiving uplink (UL) data from, at least a first UE configured to operate in a first mode;

configure at least a second sub-channel, from among the sub-channels of the wide channel, with a second channel configuration for at least one of transmitting DL data to, or receiving UL data from, at least a second UE configured to operate in a second mode; and

perform at least one of:

transmit DL data to at least the first UE using at least the first sub-channel,

receive UL data from at least the first UE using at least the first sub-channel,

transmit DL data to at least the second UE using at least the second sub-channel, or

transmit UL data to at least the second UE using at least the second sub-channel,

wherein,

the first channel configuration includes a first plurality of physical resource blocks (PRBs) between a first guard band (GB) and a second GB,

the second channel configuration includes a second plurality of PRBs between a third GB and a fourth GB,

a total number of PRBs in the second plurality of PRBs is less than a total number of PRBs in the first plurality of PRBs, and

each PRB in the second plurality of PRBs is aligned with a corresponding PRB in the first plurality of PRBs with respect to frequency.

12 . The base station of claim 11 , wherein a size of a bandwidth of the wide channel is 2.16 GHz.

13 . The base station of claim 11 , wherein a size of a bandwidth of the first sub-channel is 432 MHz.

14 . The base station of claim 11 , wherein a total number of sub-channels included in the wide channel is five.

15 . The base station of claim 11 , wherein a size of a bandwidth of the second sub-channel is at least one of 100 MHz and 400 MHz.

16 . The base station of claim 11 , wherein the base station supports at least first and second carriers and the first and second carriers are confined to the first and second sub-channels.

17 . The base station of claim 16 , wherein the at least first and second carriers operate according to a common PRB grid.

18 . A method of operating a user equipment (UE), the method comprising:

determining a wide channel;

determining at least one sub-channel within the wide channel, a channel bandwidth (BW) of the at least one sub-channel being a first BW;

receiving a configuration of at least one DL or UL carrier, a channel BW of the at least one carrier being a second BW;

determining a first and last usable physical resource block (PRB) of the at least one sub-channel based on the first BW and the second BW by

setting first and last useable physical resource blocks (PRBs) of the at least one sub-channel based on a first pair of GBs, if a size of the second BW is equal to a size of the first BW, and

setting the first and last useable PRBs of the at least one sub-channel based on a second pair of GBs, if the size of a second BW is less than the size of the first BW, a size of a total bandwidth of the second pair of GBs being greater than a size of a total bandwidth of the first pair of GBs; and

performing at least one of transmitting data to, or receiving data from, a base station via the at least one DL carrier or UL carrier, using the at least one sub-channel.

19 . The method of claim 18 , further comprising:

Obtaining a third pair of guard bands (GBs) and determine a maximum number of PRBs of the at least one DL or UL carrier based on the third pair of guard bands.

20 . The method of claim 18 , wherein the UE is capable of operating according to both the first pair and the second pair of GBs, and the method further comprising:

performing an initial access according to the second pair of GBs; and

subsequent to the initial access, receiving a radio resource control message from the base station to start operating according to the first pair of GBs.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 22, 2022
From: TIIROLA, ESA; LUNTTILA, TIMO; SCHOBER, KAROL
To: NOKIA TECHNOLOGIES OY
Reel/Frame 061847/0963 →
Continuity (2)
Provisional Application 63025537 · May 15, 2020
Related Publication 20230224719A1 · Jul 13, 2023
References Cited (24)
US 20140286269A1 · Stanwood · 2014 [cited by examiner]
US 20180049067A1 · He et al. · 2018 [cited by applicant]
US 20180206271A1 · Chatterjee · 2018 [cited by examiner]
US 20190274162A1 · Zhang et al. · 2019 [cited by applicant]
US 20200120720A1 · Wu et al. · 2020 [cited by applicant]
US 20220150008A1 · Schober · 2022 [cited by examiner]
US 20230224719A1 · Tiirola · 2023 [cited by examiner]
EP 3754892A1 · 2020 [cited by examiner]
WO 2019042291A1 · 2019 [cited by applicant]
WO WO2020165487A1 · 2020 [cited by examiner]
WO WO2020242351A1 · 2020 [cited by examiner]
WO WO2021229141A1 · 2021 [cited by examiner]
“New SID: Study on supporting NR from 52.6GHz to 71 Ghz”, 3GPP TSG RAN Meeting #86, RP-193259, Agenda: 9.1.1, Intel Corporation, Dec. 9-12, 2019, 3 pages. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical channels and modulation (Release 16)”, 3GPP TS 38.211, V16.1.0, Mar. 2020, pp. 1-130. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; User Equipment (UE) radio transmission and reception; Part 2: Range 2 Standalone (Release 16)”, 3GPP TS 38.101-2, V16.2.0, Dec… [cited by applicant]
“IEEE 802.11ad”, Wikipedia, Retrieved on Nov. 1, 2022, Webpage available at : https://en.wikipedia.org/wiki/IEEE_802.11ad, 3 pages. [cited by applicant]
“IEEE 802.11ay”, Wikipedia, Retrieved on Nov. 1, 2022, Webpage available at : https://en.wikipedia.org/wiki/IEEE_802.11ay, 3 pages. [cited by applicant]
“Required changes to NR using existing DL/UL NR waveform”, 3GPP TSG RAN WG1 #101-e, R1-2003811, Agenda: 8.1.1, Nokia, May 25-Jun. 5, 2020, 22 pages. [cited by applicant]
International Search Report and Written Opinion received for corresponding Patent Cooperation Treaty Application No. PCT/FI2021/050324, dated Jul. 16, 2021, 15 pages. [cited by applicant]
“Remaining issues on WB operation in NR-U”, 3GPP TSG RAN WG1 Meeting #100b, R1-2002226, Agenda: 7.2.2.2.5, Nokia, Apr. 20-30, 2020, 9 pages. [cited by applicant]
“The NR-U channel raster and allowed intra-cell GB for wideband operation”, TSG-RAN Working Group 4 (Radio) meeting #94-e, R4-2001319, Agenda: 8.1.1.2, Ericsson, Feb. 20-Mar. 6, 2020, 6 pages. [cited by applicant]
“Summary on wide-band operation for NR-U”, 3GPP TSG RAN WG1 #98bis, R1-1910824, Agenda: 7.2.2.2.5, LG Electronics, Oct. 14-20, 2019, 17 pages. [cited by applicant]
Partial European Search Report received for corresponding European Patent Application No. 21804159.8, dated May 22, 2024, 12 pages. [cited by applicant]
Extended European Search Report received for corresponding European Patent Application No. 21804159.8, dated Aug. 12, 2024, 12 pages. [cited by applicant]