IP Library › Granted Patent US 12,489,533
Granted Patent B2
US 12,489,533 · App. 17/773,688 · Granted Dec 2, 2025

Method and apparatus for performing V2X communication in a wireless communication system

Inventors: Sangyeob Jung (Suwon-si, KR); Anil Agiwal (Suwon-si, KR); Hyunjeong Kang (Suwon-si, KR)
Assignee: Samsung Electronics Co., Ltd.
H04B17/327H04W4/40H04W24/10H04W52/10H04W52/241H04W52/383H04W76/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,489,533
App. No.
17/773,688
Granted
Dec 2, 2025
Kind
B2
Abstract

Provided are a method and apparatus for performing vehicle-to-everything (V2X) communication in a wireless communication system, and an operation method of a first terminal in a wireless communication system includes: receiving, from a second terminal, a PC5 radio resource control (RRC) reconfiguration message including configuration information for measurement of sidelink reference signal received power (SL-RSRP); measuring the SL-RSRP, based on the configuration information for measuring the SL-RSRP; and when a reporting type regarding the measurement of the SL-RSRP is periodic reporting and a measurement value of a Layer 3 filtered SL-RSRP is present, transmitting the measurement value of the Layer 3 filtered SL-RSRP to the second terminal.

Claims (34)

1 . An operation method of a first terminal in a wireless communication system, the operation method comprising:

receiving, from a second terminal, a radio resource control (RRC) reconfiguration message including configuration information associated with measurement of sidelink reference signal received power (SL-RSRP), wherein the configuration information associated with the measurement of the SL-RSRP includes information for a timer related to a periodic reporting regarding the measurement of the SL-RSRP;

performing measurement of a Layer 3 filtered SL-RSRP, based on the configuration information associated with the measurement of the SL-RSRP;

starting the timer related to the periodic reporting, based on the information for the timer; and

transmitting, to the second terminal, the measurement result of the Layer 3filtered SL-RSRP, based on an expiry of the timer or existence of the measurement result of the Layer 3 filtered SL-RSRP.

2 . The operation method of claim 1 ,

wherein performing measurement of the Layer 3 filtered SL-RSRP is associated with a filtering coefficient, a latest received measurement result of SL-RSRP, and a previous Layer 3 filtered measurement result of SL-RSRP, and

wherein the filtering coefficient is related to the measurement of the SL-RSRP and is included in the configuration information associated with the measurement of the SL-RSRP.

3 . The operation method of claim 1 , wherein the configuration information associated with the measurement of the SL-RSRP is configured for PC5 RRC connection between the first terminal and the second terminal, wherein the first terminal communicates with the second terminal for unicast.

4 . The operation method of claim 1 , wherein the transmitting of the measurement result of the Layer 3 filtered SL-RSRP to the second terminal comprises, regardless of whether the timer related to the periodic reporting has expired, transmitting the measurement result of the Layer 3 filtered SL-RSRP to the second terminal.

5 . The operation method of claim 1 , wherein the transmitting of the measurement result of the Layer 3 filtered SL-RSRP to the second terminal comprises, when the measurement result of the Layer 3 filtered SL-RSRP is greater than a threshold value, transmitting the measurement result of the Layer 3 filtered SL-RSRP to the second terminal.

6 . The operation method of claim 1 , wherein the transmitting of the measurement result of the Layer 3 filtered SL-RSRP to the second terminal comprises, when the measurement result of the Layer 3 filtered SL-RSRP is less than a threshold value, transmitting the measurement result of the Layer 3 filtered SL-RSRP to the second terminal.

7 . An operation method of a second terminal in a wireless communication system, the operation method comprising:

receiving, from a base station, a radio resource control (RRC) reconfiguration message including configuration information associated with measurement of sidelink reference signal received power (SL-RSRP), wherein the configuration information associated with the measurement of the SL-RSRP includes information for a timer related to a periodic reporting regarding the measurement of the SL-RSRP;

transmitting, to a first terminal, a RRC reconfiguration message including the configuration information associated with the measurement of the SL-RSRP, based on the RRC reconfiguration message received from the base station, wherein the SL-RSRP is measured by the first terminal based on the configuration information associated with the measurement of the SL-RSRP; and

receiving a measurement result of a Layer 3 filtered SL-RSRP from the first terminal,

wherein the measurement result of the Layer 3 filtered SL-RSRP is received from the first terminal in case that the measurement of the Layer 3 filtered SL-RSRP is performed by the first terminal.

8 . The operation method of claim 7 , wherein the configuration information associated with the measurement of the SL-RSRP is configured for PC5 RRC connection between the first terminal and the second terminal, wherein the first terminal communicates with the second terminal for unicast.

9 . The operation method of claim 7 , wherein the timer related to the periodic reporting starts based on the information for the timer.

10 . The operation method of claim 9 , wherein, regardless of whether the timer related to the periodic reporting has expired, the measurement result of the Layer 3 filtered SL-RSRP is received from the first terminal.

11 . A first terminal in a wireless communication system, the first terminal comprising:

a transceiver; and

at least one processor configured to:

receive, from a second terminal through the transceiver, a radio resource control (RRC) reconfiguration message including configuration information associated with measurement of sidelink reference signal received power (SL-RSRP), wherein the configuration information associated with the measurement of the SL-RSRP includes information for a timer related to a periodic reporting regarding the measurement of the SL-RSRP;

perform measurement of a Layer 3 filtered SL-RSRP, based on the configuration information associated with the measurement of the SL-RSRP;

start the timer related to the periodic reporting, based on the information for the timer; and

transmit, to the second terminal through the transceiver, the measurement result of the Layer 3 filtered SL-RSRP based on an expiry of the timer or existence of the measurement result of the Layer 3 filtered SL-RSRP.

12 . A second terminal in a wireless communication system, the second terminal comprising:

a transceiver; and

at least one processor configured to:

receive, from a base station through the transceiver, a radio resource control (RRC) reconfiguration message including configuration information associated with measurement of sidelink reference signal received power (SL-RSRP), wherein the configuration information associated with the measurement of the SL-RSRP includes information for a timer related to a periodic reporting regarding the measurement of the SL-RSRP;

transmit, to a first terminal through the transceiver, a RRC reconfiguration message including the configuration information associated with the measurement of the SL-RSRP, based on the RRC reconfiguration message received from the base station, wherein the SL-RSRP is measured by the first terminal based on the configuration information associated with the measurement of the SL-RSRP; and

receive, from the first terminal through the transceiver, a measurement result of a Layer 3 filtered SL-RSRP,

wherein the measurement result of the Layer 3 filtered SL-RSRP is received from the first terminal based on an expiry of the timer related to the periodic reporting or existence of the measurement result of the Layer 3 filtered SL-RSRP. in case that the measurement of the Layer 3 filtered SL-RSRP is performed by the first terminal.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 2, 2022
From: JUNG, SANGYEOB; AGIWAL, ANIL; KANG, HYUNJEONG
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 059780/0452 →
Priority Claims (1)
KR 10-2019-0142014 · Nov 7, 2019 · national
Continuity (1)
Related Publication 20220393780A1 · Dec 8, 2022
References Cited (93)
US 10278207B2 · Lee · 2019 [cited by examiner]
US 11109363B2 · Huang · 2021 [cited by examiner]
US 11553503B2 · Parron · 2023 [cited by examiner]
US 12095566B2 · Hwang · 2024 [cited by examiner]
US 20130210422A1 · Pani · 2013 [cited by examiner]
US 20160212721A1 · Sheng · 2016 [cited by examiner]
US 20170026861A1 · Tseng · 2017 [cited by examiner]
US 20170150490A1 · Chen · 2017 [cited by examiner]
US 20180220318A1 · Uemura · 2018 [cited by examiner]
US 20180227972A1 · Tsuboi et al. · 2018 [cited by applicant]
US 20180227973A1 · Tsuboi et al. · 2018 [cited by applicant]
US 20190075014A1 · Zhou · 2019 [cited by examiner]
US 20190394786A1 · Parron · 2019 [cited by examiner]
US 20200008183A1 · Chen · 2020 [cited by examiner]
US 20200067610A1 · Lee et al. · 2020 [cited by applicant]
US 20200145937A1 · Heo · 2020 [cited by examiner]
US 20200205062A1 · Azizi · 2020 [cited by examiner]
US 20200267523A1 · Tang · 2020 [cited by examiner]
US 20200305174A1 · Ganesan · 2020 [cited by examiner]
US 20200351975A1 · Tseng · 2020 [cited by examiner]
US 20200404736A1 · Zhou · 2020 [cited by examiner]
US 20210045093A1 · Rao · 2021 [cited by examiner]
US 20210051600A1 · Fakoorian · 2021 [cited by examiner]
US 20210058136A1 · Yang · 2021 [cited by examiner]
US 20210084596A1 · Lee · 2021 [cited by examiner]
US 20210136731A1 · Li · 2021 [cited by examiner]
US 20210136742A1 · Huang · 2021 [cited by examiner]
US 20210136848A1 · Park · 2021 [cited by examiner]
US 20210136856A1 · Tseng · 2021 [cited by examiner]
US 20210136861A1 · Park · 2021 [cited by examiner]
US 20210136863A1 · Park · 2021 [cited by examiner]
US 20210211845A1 · Lin · 2021 [cited by examiner]
US 20210219268A1 · Li · 2021 [cited by examiner]
US 20210250878A1 · Liu · 2021 [cited by examiner]
US 20210314917A1 · Lee · 2021 [cited by examiner]
US 20210336688A1 · Lee · 2021 [cited by examiner]
US 20210367876A1 · Ramachandra · 2021 [cited by examiner]
US 20210409990A1 · Wang · 2021 [cited by examiner]
US 20210410084A1 · Li · 2021 [cited by examiner]
US 20220014953A1 · Teyeb · 2022 [cited by examiner]
US 20220038929A1 · Tsuboi · 2022 [cited by examiner]
US 20220053439A1 · Hu · 2022 [cited by examiner]
US 20220150730A1 · Freda · 2022 [cited by examiner]
US 20220201654A1 · Lee · 2022 [cited by examiner]
US 20220217738A1 · Lee · 2022 [cited by examiner]
US 20220225295A1 · Sartori · 2022 [cited by examiner]
US 20220232523A1 · Lee · 2022 [cited by examiner]
US 20220256386A1 · Kimba Dit Adamou · 2022 [cited by examiner]
US 20220322325A1 · Svedman · 2022 [cited by examiner]
US 20220345990A1 · Godin · 2022 [cited by examiner]
US 20220346038A1 · Miao · 2022 [cited by examiner]
US 20240340959A1 · Deng · 2024 [cited by examiner]
CA 2971875C · 2022 [cited by examiner]
CA 2992689C · 2023 [cited by examiner]
CA 3008125C · 2023 [cited by examiner]
CN 103298023A · 2013 [cited by examiner]
CN 105766034A · 2016 [cited by examiner]
CN 108809897A · 2018 [cited by applicant]
CN 110383721A · 2019 [cited by applicant]
CN 110447294A · 2019 [cited by examiner]
CN 110463234A · 2019 [cited by examiner]
CN 110602776A · 2019 [cited by examiner]
CN 111726856A · 2020 [cited by examiner]
CN 112788647A · 2021 [cited by examiner]
CN 114731314A · 2022 [cited by examiner]
EP 3128791A1 · 2017 [cited by examiner]
EP 3618391A1 · 2020 [cited by applicant]
EP 3780823A1 · 2021 [cited by examiner]
EP 3944543A1 · 2022 [cited by applicant]
EP 3622758B1 · 2023 [cited by examiner]
JP 2017038117A · 2017 [cited by applicant]
JP 2018026819A · 2018 [cited by examiner]
KR 1020200127515A · 2020 [cited by applicant]
WO WO2017136666A1 · 2017 [cited by examiner]
WO 2018005531A1 · 2018 [cited by applicant]
WO WO2019165224A1 · 2019 [cited by examiner]
WO 2019190180A1 · 2019 [cited by applicant]
WO WO2021003623A1 · 2021 [cited by examiner]
WO WO2021073727A1 · 2021 [cited by examiner]
Extended European Search Report dated Dec. 8, 2022, issued in a counterpart European Application No. 20883745.0. [cited by applicant]
Spreadtrum Communications; Discussion on physical layer procedures for sideiink; 3GPP TSG RAN WG1 #97; R1-1906362; May 2, 2019, Reno, USA. [cited by applicant]
ZTE Corporation, Sanechips; Consideration on sidelink RRM measurement; 3GPP TSG RAN WG2 Meeting #106; R2-1906479; May 13, 2019, Reno, USA. [cited by applicant]
Samsung; On Physical Layer Procedures for NR V2X; 3GPP TSG RAN WG1 #98bis; R1-1910475; Oct. 8, 2019, Chongqing, China. [cited by applicant]
International Search Report dated Feb. 9, 2021, issued in an International Application No. PCT /KR2020/015334. [cited by applicant]
LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Control (RRC); Protocol specification (3GPP TS 36.331 version 15.7.0 Release 15); ETSI TS 136 331 V15.7.0; Sep. 27, 2019. [cited by applicant]
Ericsson; PHY layer procedures for NR sidelink; 3GPP TSG-RAN WG1 Meeting #98bis; R1-1910538; Oct. 7, 2019, Chongqing, China. [cited by applicant]
Intel Corporation; Resource allocation mode-1 for Nr V2X sidelink communication; 3GPP TSG RAN WG1 Meeting #98bis; R1-1910649; Oct. 8, 2019, Chongqing, China. [cited by applicant]
VIVO; Remaining issues on PC5-RRC message exchange; 3GPP TSG-RAN WG2 Meeting #107bis; R2-1912261; Oct. 3, 2019, Chongqing, China. [cited by applicant]
Korean Office Action dated Mar. 13, 2024, issued in a counterpart Korean Application No. 10-2019-0142014. [cited by applicant]
Chinese Office Action dated Apr. 16, 2024, issued in a counterpart Chinese Application No. 202080090286.0. [cited by applicant]
Chinese Office Action dated Sep. 9, 2024, issued in Chinese Application No. 202080090286.0. [cited by applicant]
European Office Action dated Nov. 7, 2024, issued in European Application No. 20883745.0. [cited by applicant]
Chinese Office Action dated Jan. 17, 2025, issued in Chinese Application No. 2020080090286.0. [cited by applicant]