IP Library Granted Patent US 12,560,042
Granted Patent B2
US 12,560,042 · App. 17/967,624 · Granted Feb 24, 2026

Methane hydrate production equipment and method

Inventors: David A. Anderson (Montrose, GB); Fiona Robertson (Aberdeen, GB); Paul Clark (Aberdeen, GB); Robin Rajan (Bengaluru, IN)
Assignee: Baker Hughes Energy Technology UK Limited
E21B33/038E21B33/043E21B34/04E21B41/0099E21B41/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,560,042
App. No.
17/967,624
Granted
Feb 24, 2026
Kind
B2
Abstract

A system for subsea operations and associated methods are disclosed. The system includes a well adapter to be associated with a production or monitoring well where the well adapter can receive a cap for capping the production or monitoring well and can receive a valve package to allow flow of production fluids therethrough, from the production well to the well adapter.

Claims (44)

1 . A system for subsea operations, comprising:

a well adapter to be associated with a production or monitoring well, wherein the well adapter is configured to receive a cap for capping the production or monitoring well, is configured to receive a valve package, and is configured to allow flow of production fluids therethrough, from the production well to the valve package.

2 . The system of claim 1 , further comprising:

one or more of an Xmas tree, a lower riser package (LRP), and an emergency disconnect package (EDP) to form the valve package.

3 . The system of claim 1 , further comprising:

access ports in the well adapter to allow communication equipment, downhole pressure transducers (DHPTs), or monitoring equipment to access the production or monitoring well.

4 . The system of claim 1 , further comprising:

a passthrough feature of the well adapter to allow water to flow independent of gas from a methane hydrate layer of the production or monitoring well.

5 . The system of claim 1 , further comprising:

an alignment frame to form part of the well adapter and to comprise controls for operation by a remotely operated vehicle (ROV).

6 . The system of claim 1 , further comprising:

a wellhead coupler to be part of the well adapter and to sit over a wellhead housing of the production or monitoring well; and

dogs within the wellhead coupler to lock against grooves of an outer diameter of the wellhead housing.

7 . The system of claim 1 , further comprising:

a tubing associated with the well adapter, the tubing to be within a casing hanger of the production or monitoring well.

8 . The system of claim 1 , further comprising:

a tubing hanger to be associated with a wellhead housing of the production or monitoring well, the tubing hanger to receive the well adapter that is stabbed connected using an open water intervention riser system (OWIRS).

9 . The system of claim 1 , further comprising:

a tubing hanger to be associated with the well adapter and with a tubing, the tubing to be within a casing hanger of the production or monitoring well.

10 . A well adapter configured to be associated with a production or monitoring well, the well adapter further configured to receive a cap for capping the production or monitoring well and further configured to receive a valve package to allow flow of production fluids therethrough, from the production well to the valve package.

11 . The well adapter of claim 10 , further comprising one or more of:

access ports in the well adapter to allow communication equipment, downhole pressure transducers (DHPTs), or monitoring equipment to access the production or monitoring well;

a passthrough feature of the well adapter to allow water to flow independent of gas from a methane hydrate layer of the production or monitoring well; or

an alignment frame to form part of the well adapter and to comprise controls for operation by a remotely operated vehicle (ROV).

12 . A method for subsea operations, comprising:

enabling a well adapter to be associated with a production or monitoring well; and

associating a cap or a valve package with the well adapter, the cap to allow capping of the production or monitoring well and the valve package to receive a flow of production fluids there through, from the production well and through the well adapter.

13 . The method of claim 12 , further comprising:

enabling the valve package using one or more of an Xmas tree, a lower riser package (LRP), and an emergency disconnect package (EDP).

14 . The method of claim 12 , further comprising:

enabling access ports in the well adapter to allow communication equipment, downhole pressure transducers (DHPTs), or monitoring equipment to access the production or monitoring well.

15 . The method of claim 12 , further comprising:

providing a passthrough feature of the well adapter to allow water to flow independent of gas from a methane hydrate layer of the production or monitoring well.

16 . The method of claim 12 , further comprising:

providing the well adapter with an alignment frame that comprises controls for operation by a remotely operated vehicle (ROV).

17 . The method of claim 12 , further comprising:

enabling a wellhead coupler to be part of the well adapter and to sit over a wellhead housing of the production or monitoring well; and

providing dogs within the wellhead coupler to lock against grooves of an outer diameter of the wellhead housing.

18 . The method of claim 12 , further comprising:

associating a tubing with the well adapter, the tubing to be within a casing hanger of the production or monitoring well.

19 . The method of claim 12 , further comprising:

associating a tubing hanger with a wellhead housing of the production or monitoring well, the tubing hanger to receive the well adapter that is stabbed connected using an open water intervention riser system (OWIRS).

20 . The method of claim 12 , further comprising:

associating a tubing hanger with the well adapter and with a tubing, the tubing to be within a casing hanger of the production or monitoring well.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 17, 2022
From: ANDERSON, DAVID A.; ROBERTSON, FIONA; CLARK, PAUL; RAJAN, ROBIN
To: BAKER HUGHES ENERGY TECHNOLOGY UK LIMITED
Reel/Frame 061445/0368 →
Priority Claims (1)
IN 202111049160 · Oct 27, 2021 · national
Continuity (1)
Related Publication 20230130315A1 · Apr 27, 2023
References Cited (46)
US 4552213A · Boyd · 1985 [cited by examiner]
US 6688386B2 · Cornelssen · 2004 [cited by applicant]
US 6715554B1 · Cunningham · 2004 [cited by examiner]
US 6913083B2 · Smith · 2005 [cited by examiner]
US 7165619B2 · Fox · 2007 [cited by examiner]
US 7331394B2 · Edwards · 2008 [cited by examiner]
US 7677320B2 · Shaw · 2010 [cited by applicant]
US 8316946B2 · June · 2012 [cited by examiner]
US 8322442B2 · Voss · 2012 [cited by examiner]
US 8960302B2 · Shilling · 2015 [cited by examiner]
US 8997872B1 · Lugo · 2015 [cited by applicant]
US 9309740B2 · June · 2016 [cited by examiner]
US 9631460B2 · June · 2017 [cited by examiner]
US 9650855B2 · Caldwell · 2017 [cited by examiner]
US 9784063B2 · June · 2017 [cited by examiner]
US 9874065B2 · Christensen · 2018 [cited by examiner]
US 9874076B2 · Christensen · 2018 [cited by examiner]
US 9909380B2 · June · 2018 [cited by examiner]
US 10036226B2 · Maher · 2018 [cited by examiner]
US 10240424B2 · Brown · 2019 [cited by examiner]
US 10337276B2 · Powell · 2019 [cited by examiner]
US 10968707B2 · Billington · 2021 [cited by examiner]
US 11047198B2 · Ross · 2021 [cited by examiner]
US 11125041B2 · Bay · 2021 [cited by examiner]
US 11136857B2 · Cramm · 2021 [cited by examiner]
US 11142983B2 · Thomas · 2021 [cited by examiner]
US 11767754B2 · Kalb · 2023 [cited by examiner]
US 11773678B2 · Bartlett · 2023 [cited by examiner]
US 11846162B2 · Jonsjord · 2023 [cited by examiner]
US 20020011336A1 · Baskett et al. · 2002 [cited by applicant]
US 20040112604A1 · Milberger et al. · 2004 [cited by applicant]
US 20050028980A1 · Page · 2005 [cited by examiner]
US 20070246220A1 · Fenton · 2007 [cited by applicant]
US 20120043089A1 · Hoffman · 2012 [cited by examiner]
US 20120318520A1 · Lugo · 2012 [cited by examiner]
US 20140251633A1 · Dahlem et al. · 2014 [cited by applicant]
US 20150047850A1 · Johnson · 2015 [cited by examiner]
US 20150330194A1 · June · 2015 [cited by examiner]
US 20180209236A1 · Talgø · 2018 [cited by examiner]
US 20190226303A1 · Billington · 2019 [cited by examiner]
EP 0885345A1 · 1998 [cited by applicant]
JP 2000517013A · 2000 [cited by applicant]
JP 2019504223A · 2019 [cited by applicant]
Yamamoto et al., “Well design for methane hydrate production: developing a low-cost production well for offshore Japan,” Offshore Technology Conference Asia, Mar. 2018, 8 pages. [cited by applicant]
Yamamoto et al., “Construction process of a low-cost subsea well for methane hydrate production in nankai trough,” 27th Ocean Engineering Symposium, Aug. 2018, 7 pages. [cited by applicant]
International Search Report and Written Opinion issued in PCT Application No. PCT/EP2022/025484, mailed Mar. 6, 2023 (15 pages). [cited by applicant]