IP Library Granted Patent US 12,646,939
Granted Patent B2
US 12,646,939 · App. 18/455,883 · Granted Jun 2, 2026

Power plant having a flexible firm skid

Inventors: Willy Steve Ziminsky (Greenville, SC); Brock Mclaren Wilson (Huntsville, AL)
Assignee: GE Vernova Infrastructure Technology LLC
H02J3/001H02J3/381H02J2101/22H02J2101/28
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,646,939
App. No.
18/455,883
Granted
Jun 2, 2026
Kind
B2
Abstract

A method of operating a power plant is provided. The method includes generating, with one or more power generators, a total plant power. The method further includes providing a first portion of the total plant power to one or more auxiliary devices to meet an auxiliary demand. The auxiliary demand being generated through operation of the one or more auxiliary devices. The one or more auxiliary devices being one of thermally, fluidly, or mechanically coupled to the one or more power generators. The method further includes providing a second portion of the total plant power to a flexible firm skid disposed within the power plant to meet a flexible firm demand. The method further includes providing a third portion of the total plant power to a power grid outside of the power plant to meet a grid demand.

Claims (45)

1 . A method of operating a power plant, the method comprising:

generating, with one or more power generators including a gas turbine, a total plant power;

providing a first portion of the total plant power to one or more auxiliary devices to meet an auxiliary demand, the auxiliary demand being generated through operation of the one or more auxiliary devices, the one or more auxiliary devices being one of thermally, fluidly, or mechanically coupled to the gas turbine;

providing a second portion of the total plant power to a flexible firm skid disposed within the power plant to meet a flexible firm demand, the flexible firm demand being generated through operation of the flexible firm skid; and

providing a third portion of the total plant power to a power grid outside of the power plant to meet a grid demand.

2 . The method as in claim 1 , wherein the flexible firm skid is not mechanically, thermally, or fluidly coupled to the one or more power generators.

3 . The method as in claim 1 , wherein the power plant operates within a maximum efficiency range at base load conditions, wherein the power plant generates a base load power output at the base load conditions, and wherein the method further comprises:

generating a flexible firm demand that is between about 1% and about 50% of the base load power output of the power plant to maintain the maximum efficiency range.

4 . The method as in claim 1 , wherein the flexible firm skid includes a containerized demand sink having a digital asset disposed within a housing.

5 . The method as in claim 4 , further comprising:

moving the containerized demand sink from a first location to a second location that is different than the first location.

6 . The method as in claim 4 , wherein the digital asset comprises at least one of data centers, digital factory equipment, and computing units.

7 . The method as in claim 4 , further comprising:

operating the containerized demand sink within a proximity of about 0 meters and about 500 meters of the one or more power generators.

8 . The method as in claim 1 , wherein the one or more power generators includes a renewable power generator, and wherein the method further comprises:

generating, with the renewable power generator, a renewable power output that forms a portion of the total plant power; and

adjusting the flexible firm demand based on a magnitude of the renewable power output.

9 . The method as in claim 1 , wherein the power plant operates within a maximum efficiency range at base load conditions, and wherein the method further comprises:

operating the power plant at base load conditions; and

adjusting an operation of the flexible firm skid to adjust the flexible firm demand when the total plant power exceeds a sum of the grid demand and the auxiliary demand to maintain operation of the power plant at base load conditions.

10 . The method as in claim 1 , wherein the method further comprises:

decreasing or eliminating the flexible firm demand by adjusting an operation of the flexible firm skid when the grid demand exceeds a power threshold.

11 . A power plant comprising:

one or more power generators including a gas turbine;

one or more auxiliary devices mechanically, thermally, or fluidly coupled to the gas turbine and disposed within the power plant, the one or more auxiliary devices configured to generate an auxiliary demand;

a flexible firm skid disposed within the power plant, the flexible firm skid configured to generate a flexible firm demand;

a controller operably connected to the one or more power generators, the one or more auxiliary devices, and the flexible firm skid, the controller including memory and one or more processors, the memory storing instructions that when executed by the one or more processors cause the power plant to perform one or more operations including the following:

generate, with one or more power generators, a total plant power;

provide a first portion of the total plant power to one or more auxiliary devices to meet an auxiliary demand, the auxiliary demand being generated through operation of the one or more auxiliary devices, the one or more auxiliary devices being one of thermally, fluidly, or mechanically coupled to the one or more power generators;

provide a second portion of the total plant power to a flexible firm skid disposed within the power plant to meet an flexible firm demand, the flexible firm demand being generated through operation of the flexible firm skid; and

provide a third portion of the total plant power to a power grid outside of the power plant.

12 . The power plant as in claim 11 , wherein the flexible firm skid is not mechanically, thermally, or fluidly coupled to the one or more power generators.

13 . The power plant as in claim 11 , wherein power plant operates within a maximum efficiency range at base load conditions, wherein power plant generates a base load power output at the base load conditions, and wherein one or more operations further comprises:

generating a flexible firm demand that is between about 1% and about 50% of the base load power output of the power plant to maintain the maximum efficiency range.

14 . The power plant as in claim 11 , wherein the flexible firm skid includes a containerized demand sink having a digital asset disposed within a housing.

15 . The power plant as in claim 14 , wherein the digital asset comprises at least one of data centers, digital factory equipment, and computing units.

16 . The power plant as in claim 14 , wherein the containerized demand sink is disposed within a proximity of about 0 meters and about 500 meters of the one or more power generators.

17 . The power plant as in claim 11 , wherein the one or more power generators includes a renewable power generator, and wherein the one or more operations further comprises:

generate, with the renewable power generator, a renewable power output wherein the renewable power output forms a portion of the total plant power; and

adjust the flexible firm demand based on a magnitude of the renewable power output.

18 . The power plant as in claim 11 , wherein the power plant operates within a maximum efficiency range at base load conditions, and wherein one or more operations further comprises:

operate the power plant at base load conditions to generate a base load power output;

adjust an operation of the flexible firm skid to adjust the flexible firm demand when the total plant power exceeds a sum of the grid demand and the auxiliary demand to maintain operation of the power plant at base load conditions.

19 . The power plant as in claim 11 , wherein when the grid demand exceeds a power threshold, the one or more operations include:

decrease or eliminating the flexible firm demand by adjusting an operation of the flexible firm skid.

Assignments (2)
CHANGE OF NAME Recorded Apr 30, 2026
From: GE INFRASTRUCTURE TECHNOLOGY LLC
To: GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 075332/0243 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 25, 2023
From: ZIMINSKY, WILLY STEVE; WILSON, BROCK MCLAREN
To: GE INFRASTRUCTURE TECHNOLOGY
Reel/Frame 064705/0057 →
Continuity (1)
Related Publication 20250070552A1 · Feb 27, 2025
References Cited (69)
US 8146374B1 · Zien · 2012 [cited by applicant]
US 9160175B2 · Cservolgyi et al. · 2015 [cited by applicant]
US 10110003B2 · Stalker · 2018 [cited by applicant]
US 10287988B2 · Asati et al. · 2019 [cited by applicant]
US 10367353B1 · McNamara et al. · 2019 [cited by applicant]
US 10444818B1 · McNamara et al. · 2019 [cited by applicant]
US 10452127B1 · McNamara et al. · 2019 [cited by applicant]
US 10608433B1 · McNamara et al. · 2020 [cited by applicant]
US 10618427B1 · McNamara et al. · 2020 [cited by applicant]
US 10626817B1 · Piche et al. · 2020 [cited by applicant]
US 10857899B1 · McNamara et al. · 2020 [cited by applicant]
US 10873211B2 · McNamara et al. · 2020 [cited by applicant]
US 10910873B2 · Bonachea · 2021 [cited by applicant]
US 11016456B2 · Henson et al. · 2021 [cited by applicant]
US 11016458B2 · McNamara et al. · 2021 [cited by applicant]
US 11016553B2 · McNamara et al. · 2021 [cited by applicant]
US 11025060B2 · McNamara et al. · 2021 [cited by applicant]
US 11031783B2 · McNamara et al. · 2021 [cited by applicant]
US 11031787B2 · McNamara et al. · 2021 [cited by applicant]
US 11031813B2 · McNamara et al. · 2021 [cited by applicant]
US 11042948B1 · McNamara et al. · 2021 [cited by applicant]
US 11128165B2 · McNamara et al. · 2021 [cited by applicant]
US 11221597B2 · Dempster · 2022 [cited by applicant]
US 11256320B2 · McNamara et al. · 2022 [cited by applicant]
US 11275427B2 · McNamara et al. · 2022 [cited by applicant]
US 11283261B2 · McNamara et al. · 2022 [cited by applicant]
US 11342746B2 · McNamara et al. · 2022 [cited by applicant]
US 11397999B2 · McNamara et al. · 2022 [cited by applicant]
US 11431195B2 · McNamara et al. · 2022 [cited by applicant]
US 11437821B2 · Cavness et al. · 2022 [cited by applicant]
US 11451059B2 · Cavness et al. · 2022 [cited by applicant]
US 11537183B2 · Lewis et al. · 2022 [cited by applicant]
US 11574372B2 · Barbour · 2023 [cited by applicant]
US 11581734B2 · McNamara et al. · 2023 [cited by applicant]
US 11592886B2 · Marks et al. · 2023 [cited by applicant]
US 11594888B2 · McNamara et al. · 2023 [cited by applicant]
US 11611219B2 · McNamara et al. · 2023 [cited by applicant]
US 20080018175A1 · McNamara et al. · 2008 [cited by applicant]
US 20090078401A1 · Cichanowicz · 2009 [cited by applicant]
US 20110316337A1 · Pelio · 2011 [cited by examiner]
US 20130328395A1 · Krizman et al. · 2013 [cited by applicant]
US 20140044261A1 · Massimo · 2014 [cited by applicant]
US 20190317539A1 · Veda et al. · 2019 [cited by applicant]
US 20200359572A1 · Henson et al. · 2020 [cited by applicant]
US 20210010385A1 · Spears · 2021 [cited by applicant]
US 20210027223A1 · Koide · 2021 [cited by applicant]
US 20210036547A1 · McNamara et al. · 2021 [cited by applicant]
US 20210092875A1 · Hellmann-Regen · 2021 [cited by applicant]
US 20210101499A1 · McNamara et al. · 2021 [cited by applicant]
US 20210288496A1 · McNamara et al. · 2021 [cited by applicant]
US 20210296928A1 · McNamara et al. · 2021 [cited by applicant]
US 20210312574A1 · McNamara et al. · 2021 [cited by applicant]
US 20220050714A1 · Grimshaw et al. · 2022 [cited by applicant]
US 20220065162A1 · Hunt et al. · 2022 [cited by applicant]
US 20220085603A1 · McNamara et al. · 2022 [cited by applicant]
US 20220171449A1 · McNamara et al. · 2022 [cited by applicant]
US 20220197363A1 · McNamara et al. · 2022 [cited by applicant]
US 20220294219A1 · McNamara et al. · 2022 [cited by applicant]
US 20220300394A1 · Webber · 2022 [cited by applicant]
US 20220335543A1 · Roston et al. · 2022 [cited by applicant]
US 20220407350A1 · McNamara et al. · 2022 [cited by applicant]
US 20230121669A1 · McNamara et al. · 2023 [cited by applicant]
US 20230180422A1 · Kazi · 2023 [cited by examiner]
US 20240061493A1 · Webber · 2024 [cited by examiner]
CN 115760400A · 2023 [cited by applicant]
EP 3738014A4 · 2022 [cited by applicant]
KR 20230000865A · 2023 [cited by applicant]
Kordkheili et al., On-Site Power Generation for Data Centers, Sustainable Digital Infrastructure Alliance (SDIA), Integrating Data Centers with Low Carbon Energy Assets, 2021, 12 Pages. Retrieved May 18, 2023 from Webpa… [cited by applicant]
European Search Report Corresponding to U.S. Appl. No. 24/191,976 on Feb. 21, 2025. [cited by applicant]